www.Mulo.world

The site's good ideas, invention by invention: what holds up physically in each page, including the archived pages. 20/11/26

Number of good ideas: 656
Uncertain ideas, in italics, not counted: 22

This site contains some thirty inventions. Some hold up, others do not, and it is written on each page. But a page whose overall result is wrong can contain a sound idea. This page does not list the inventions, it lists the ideas, one per line, keeping only those that hold up physically. Each section links to the original page. In italics, at the end of some sections, the ideas judged interesting but physically uncertain, with the reason for the doubt: they are not counted in the total, they are there so that someone can check them. The archived pages are included: their good ideas served the following versions, and it is one of them, the Hydroloop (in French), that today carries the world plan (in French).

The complete list of inventions, with their versions, the address of each page and its status, is on the page Inventory of inventions.
------------------------------
HYDROLOOP 2026 (V1 TO V18) AND WORLD PLAN
------------------------------
V16 Pacha 1 (in French) | V16 Pacha 2 | V16 Pacha 3 (in French) | V15 Canyon | Best locations | Pacha locations (in French) | Hydroloop V8 (in French) | V9 (in French) | V10 (in French) | V11 (in French) | V12 (in French) | V13 (in French) | V14 | V7 revised (in French) | V4 revised (in French) | V3 revised (in French) | V6 revised (in French) | V5 revised (in French) | V3 ECO (in French) | World plan (in French)

* Closed-circuit pumped storage on a hill, without a river or a large dam: two reservoirs, a pipe, Pelton turbines.
* Couple wind power directly to pumping, without going through the grid.
* Upstream rainwater retention that feeds the circuit and regulates floods downstream.
* A head of 160 to 300 m rather than large volumes: less land take, more energy per m³.
* Bifacial photovoltaics on the embankments and around the reservoirs, pumping by day, generating in the evening.
* Size a version below the concession threshold (1 MW in France) for a first site that can be authorised in a few months.
* Start from the ANU atlas of 616,000 existing sites instead of looking for new sites.
* Show the dispatchable share (24%) separately from gross output.
* Give an LCOE with an explicit rate and lifetime, and a calculated ROI, not an asserted one.
* Acknowledge the industrial bottlenecks (256 GW/year of wind) in the page itself.
* Pneumatically operated guard valves that close even when the plant is de-energised, supplied by a compressed air reservoir.
* Pneumatic diaphragm pumps at the low point of each reservoir for desilting and emergency draining, without electricity.
* White, ventilated floating cover on the upper reservoir: evaporation reduced by 70 to 80% and water that stays cool.
* An abandoned quarry with a body of water as lower reservoir: the site is already artificial and the impact study shorter.
* A pure high-head storage plant (1,500 m) rather than a bigger production plant: the energy of a m³ is proportional to the head, the V14 reservoirs store five times more, and the service is judged in euros per MWh cycled against batteries, not against wind turbines.
* On a storage plant, storage pays for the site and production is judged on its own account: wind turbines at 26 €/MWh on the ridge pay back in 4.5 years, hybrid panels at 47 €/MWh replace the surplus that is bought; they are added as soon as the lidar gives 6 m/s, they are not required.
* The cold of altitude comes down with the turbined water: 23 m³/s at 5 to 10 °C coming from 2,500 m make 580 MW of cooling for ten hours for data centres and neighbourhoods, and the lukewarm water cools again as it goes back up.
* A coastal seawater V15 already has in its shaft the 60 to 70 bar of reverse osmosis: a bypass at the 600 m level feeds the membranes without a high-pressure pump, the fresh water for 400,000 inhabitants paid for with surplus at 20 €/MWh.
* The synchronous alternators of the Peltons restart a metropolis after a blackout and provide the inertia that grids full of panels lose: two services that batteries only provide at great expense in electronics.
* A shaft at 150 bar and a reservoir at the top is gravity fire defence for the whole slope, with no pump or electricity on the day everything fails.
* A two-cell upper reservoir and an empty buffer reservoir halfway down sized for one cell: the rule on reservoirs above a city becomes a built protection.
* Hydraulic short circuit (Kops II): pump and turbine at the same time, the Pelton absorbs the surplus with its deflectors, net power is adjusted in seconds with fixed-speed pumps, cheaper than converters.
* At altitude, rain retention becomes snow retention: a belt canal brings the spring melt to the upper reservoir.
* Separate Pelton and multi-stage pumps to exceed the 700 to 800 m of a reversible pump-turbine: Bieudron at 1,883 m and San Fiorano at 1,440 m have done so for thirty years.
* A third reservoir, a rain lake ten times larger than the upper reservoir and placed higher than it, fed by a belt canal on the natural slopes: rain first, pumps next, and all the wind is sold directly as long as the lake has water (V16 Pacha).
* The oversized rain catchment is the mountain: a built catchment in clay and gravel costs 12 €/m² and 2 km² give only 1.7 million m³ a year; a belt canal over 300 km² of slopes gives a hundred times more for ten times less; the built catchment stays at 0.2 or 0.5 km² as a guarantee for dry years, almost eternal.
* The size of a Pacha is chosen on the ratio between the water that falls and the water the Pelton turns: 50 million m³ a year for a V11, 200 for a V14, 267 for a V15; 30 rainy km² cover half a V11 and a tenth of a V14.
* The rain lake is worth ten times the upper reservoir, not twenty-five: beyond that, it is the embankment that grows, not the gain; in the monsoon, it is the Pelton that is doubled, not the lake.
* At 1,500 m, rain is worth five times more (3.7 kWh per m³) and the 300 MW Pelton that sleeps fourteen hours a day swallows the monsoon without storing it: the Pacha 3 turbines the mountain off-peak.
* Rain turbined at 1,500 m arrives at the bottom as fresh water, by gravity: on a coast, the two-cell upper reservoir becomes one fresh cell and one salt cell, and the fresh lower reservoir is the city's reservoir, 100 million m³ a year without desalination (V16 Pacha 3).
* A lake of 8 million m³ cannot be received in a buffer reservoir: the Pacha never goes above a city, only where the sea or a pit receives everything.
* Turbined rainwater comes out at the bottom in a stream regulated all year round: a Pacha returns water to its valley as much as energy, clips its floods, and the regulated water is often worth more than the kWh gained.
* The lake in clay and gravel rather than membrane: two thousand years of precedents (Nabataean Negev, tanks of southern India), almost nothing to pay after construction, and it will still be there when the wind turbines have been replaced three times.
* The Pacha rain catchment is the mountain connected to the lake by a belt canal: 0.5 M€ per kilometre, 7 km² captured per kilometre, paid back in one to two years and good for a century; it is the only item that lowers the kWh (V11: 35 €/MWh, 29.4 with 20 km of canal; V14: 28, 24 with 30 km, 23.6 with 45).
* Reshaping slopes so that they run off more never pays: ten points of runoff cost more than the kWh gained; the mountain is captured as it is.
* The rain Pelton is sized on the surplus beyond what the peak consumes, not on the whole inflow: the peak is served first because its kWh is worth more, and the surplus turns a small Pelton day and night, two units above 5 MW so that one runs while the other is being serviced.
* Behind a V15, no rain Pelton to buy: the large Pelton that sleeps fourteen hours a day turbines the rain off-peak, and the lake can stay small, five times the upper reservoir, because the machine does the work.
* The last 10% of the lake only go to the upper reservoir: the peak keeps its water even in the dry season.
* Choose the machine again when the reasons for the first choice have disappeared: the Pelton had been taken for its flexibility when pumps were fixed-speed; with variable-speed reversible Francis (Goldisthal), at 300 m the two machines are level to within 0.5 €/MWh and the choice is made on whether frequency reserve is paid or not and on sediments.
* At 160 m, the Pelton is not in its place: a reversible Francis or a reversed pump gains 2 to 4 €/MWh on the 1 MW module, the most expensive kWh of the plan; it is the only place where changing the machine changes the plan.
* Pelton wherever the water is loaded (torrent, Pacha rain, alternating fresh water and seawater): buckets are changed in the workshop, an eroded Francis runner has to be replaced.
* Look for Pacha sites with rain first (at least 1,500 mm), then the slope that can be captured, the contour line of the canal, the valley for the lake and nothing below: rain is not where coal burns, the Pacha replaces the fuel oil and gas of windward coasts and islands.
* A Pacha is not one more plant but an option on a plant already counted: 0.17 to 0.26 M€ per added annual GWh, three times less than a new plant, because it builds no wind turbine, no reservoir and no pipe.
* Count regulated water next to the kWh: 330 km³ a year for 2,550 Pacha, and payers that electricity does not have (water agencies, irrigators, cities that desalinate).
* Build the lake and the canal at the same time as the base plant, not afterwards: the lake fills the upper reservoir from the first impoundment, and a conversion after the fact costs the same canal but loses ten years of rain.
* A mountain lake or a reservoir that already exists above a 300 m slope is an almost finished Pacha: only a canal and a rain Pelton remain, it is the first prototype to build.
* A perennial base flow is worth more than its volume: a stream of 1 m³/s, 30% of the water of a Pacha 1, removes the 39 days of empty lake and turns the rain plant into a continuous plant (V17 Gold).
* The Gold's water comes from somewhere other than the catchment of the belt canal, which has already cut all the thalwegs: a neighbouring valley by canal or tunnel, a watercourse rising below the canal, or a watercourse pumped back up; and it is never raised higher than necessary, the upper reservoir is the target, the lake is only the stock.
* Three ways to raise a stream without urgency: the hydraulic ram (7 to 8% of the flow, without energy), the pump on the plant's surplus (30 m of lift cost 14% of the energy returned at 300 m), the multi-blade windmill for isolated intakes far from any cable.
* A borehole is not a spring: pumped, it returns less than it costs (50 L/s lifted 100 m: +1 GWh and a kWh that goes up); only water that comes out on its own, karst, volcanic or artesian spring, counts.
* Karst, excluded for the lake because it leaks, is the best supplier of water: the large spring emerges at the contact with the impermeable layer, and it is on this layer, further down, that the lake is placed.
* Spring water is clear: it gives back to the Pacha the reversible Francis that rainwater had taken away from them, 0.5 €/MWh less.
* At 1,500 m, water is worth 3.7 kWh per cubic metre: it is on a Pacha 3 that a 10 km tunnel to fetch a torrent pays for itself, and a meltwater torrent falls there in June, when the upper reservoir is emptying; on a Pacha 1, you go around, you do not dig.
* On a battery, free water counts twice: turbined off-peak, and in place of the grid surplus that is no longer bought.
* Reread a list of sites with a new criterion before setting a percentage in a plan: 65% of Pacha sites have a divertible watercourse on the map and 23% a large spring, half of them are kept (30% and 11%) for water rights, reserved flow, tunnels and springs already captured.
* When the grid overflows, our wind turbines and panels overflow too: it is with them that the water is raised first, the grid only completes (V18 Sky 2: 70 of the 82 GWh pumped).
* Keep the turbined water in a lower lake instead of returning it immediately: it becomes water that can be raised again, and the valley still receives it over the year (V18 Sky).
* On a Gold, the pumps are hardly used any more: the Sky gives them work again without buying new ones.
* A storage plant is sized on its turbine as much as on its lake: without the power to empty it quickly, a large reserve only serves a few days a year.
* The reserve is paid for by the height: at 1,500 m a m³ is worth five times more than at 300 m, it is on high heads that a large winter reserve pays back (V18 Sky 3: 28 M€ net a year against 6 on the Sky 2).
* Never pump seawater into a freshwater lake: the salt loop and the fresh reserve stay separate, switched intake and freshwater flushing (V18 Sky 3).
* Keep the covered lower reservoir next to the lower lake: in very hot weather, the water that has to wait at the bottom waits there, where evaporation is better controlled than on a lake (V18 Sky).
* Rain that falls at the bottom is free water but not free energy: it has to be raised; the lower lake is placed where the slopes already run off into it, without a built catchment (V18 Sky).
* The water that helps a Sky is the water that arrives at the top: an artesian spring whose pressure carries it up to the lake is worth 3.7 kWh per m³ at 1,500 m, without a pump (V18 Sky Artesia).
* The spring and the Sky reinforce each other: free water fills the reserve that the pumps no longer have to fill, 8.1 M€ a year more than the sum of the two (V18 Sky Artesia).
* Only take from a confined aquifer what it returns, with pressure measured continuously: each additional borehole lowers the pressure of all the others, and never fossil water (V18 Sky Artesia).
* Show the high figure and the low figure of a saving that is calculated but not confirmed (10,980 and 10,780 billion) rather than removing it from the total before a manufacturer has signed it.
* The ramparts that overlook large cities (Tehran, Santiago, Los Angeles, Almaty) are the best storage sites: the lower reservoir is at the city's door, the grid is there, the power is returned where it is consumed.
* Score a site out of 100 with explicit weights (wind 25, substation 15, city 15, geometry 15, status 10, water 8, soil 6, sun 3, acceptance 3) and four exclusion rules that come before the score.
* Tribal or sacred land: as a joint venture with the nation concerned or not at all; the Little Colorado refusals in 2021 and 2022 taught everyone this.
* Prepare the plant during the operation of an open-pit mine or quarry: the machines that dig anyway leave a 300 m slope with a regular gradient for the penstock and a ridge platform for the upper reservoir; the pit becomes the lower reservoir, the mine's connection and tracks already exist, and the land can be sold or kept for a future Hydroloop at no real extra cost: a revised V7 or a V11 for medium pits, a V14 for large mines, whose pit 300 to 800 m deep is an oversized lower reservoir, whose spoil heaps make an artificial ridge for the wind turbines and the upper reservoir, and whose extra-high-voltage connection already exists. Pumped storage in a mine pit already exists (Kidston in Australia, 250 MW in an old gold mine); the slope is set with the geotechnical engineer, not in advance, and mine water must be neutralised before the Peltons.
* Finance the upstream retention through flood protection (GEMAPI, water agencies), since its kWh alone do not pay for it.
* Check the dam classification threshold and plan a spillway for the hundred-year flood before drawing a retention.
* Pump during the hours of negative market prices rather than with electricity that sells.
* Mixed pumped storage on a stream: take 20 to 30% of the mean flow, automatic shutdown below a low-water threshold, fish screen, flow measured for a year before investing.
* Structure as a public utility, local authority or cooperative to borrow at 3% over 35 years: 10 €/MWh less on the same plant.
* Distinguish the prototype version that carries everything to demonstrate from the industrial version reduced to what produces or makes safe, with a table for each module removed.
* Draw up the annual water balance of a closed circuit (evaporation, leaks, rain, drainage) before claiming that pumped storage without a river is possible.
* First filling of the reservoirs by draining the site over 3 to 4 months, without tankers or abstraction.
* Write that at 1 MW a battery stores two to three times more cheaply, and justify pumped storage by lifetime and series production.
* Size the turbine separately from storage: a bigger Pelton does not produce more, it produces faster and sells peak MW.
* In a snow-fed regime, size the abstraction on the winter flow and not on the annual mean.
* Choose first the mountain sites already served by a road (resorts, passes) for blade convoys.
* A single penstock for several turbines: the price follows the diameter, the flow grows as the diameter to the power 2.5.
* Share reservoirs, pipe, powerhouse and connection between several wind turbines on the same site: 15 to 18% savings.
* Enlarge the reservoirs when adding turbines: several machines add power, not stored energy.
* Connection clipped at 70% of installed power: when the wind exceeds it, pump instead of curtailing.
* Optimise with an explicit constraint (at least 20% dispatchable output) so that the model does not answer with a simple wind farm.
* Separate Pelton and pump rather than a reversible unit: variable-speed pumping during generation and better efficiency at part load.
* Dump load: an immersed resistor that receives the turbine's power in the event of a grid outage to prevent overspeed.
* Reuse coal plant sites (substation, connection, staff) as hubs for the new plants, and close the plant when the hub is running.
* Keep existing gas plants in reserve at 5% of the time rather than building prohibitively expensive long-duration storage.
* Set the pace of fossil closures on the sector's retirements, 3 to 4% a year.
* Solar variant of the module (8 to 12 MWp per wind turbine replaced) in hot countries where the wind industry lacks capacity.
* Serve countries in order of their carbon intensity: eight countries make 70% of the world's coal power.
* Direct-drive permanent magnet synchronous generator: no external excitation or gearbox, fewer losses and less noise.
* Calculate water hammer overpressure with the Joukowsky formula (density × wave speed × change in velocity) to set the pressure class of the parts.
* Floating V-shaped deflector upstream of a water intake: logs and floating objects are diverted towards the banks by the current itself.
* Inclined screen in front of the turbine with a periodic rake cleaner, driven if possible by the machine's shaft.
* Pay a storage plant also through primary frequency reserve, a service paid for by the grid operator, and not only through day-night arbitrage.
* Size by marginal return: stop enlarging when the next metre costs more than it brings in, and spot cost jumps such as a second turbine.
* Compare every invention with the same budget placed in standard technology (solar farm, commercial machine) before announcing profitability.
* Floating photovoltaics limited to 75% of the surface and kept 15 m from the banks: when the level drops by 5 m, the water's edge recedes by 12.5 m.
* Variable-level anchoring of floating islands with guide masts on weighted pads placed on geotextile, without piercing the geomembrane, or counterweighted bank cables.
* Every surface laid on water at a 2 to 3% slope towards channels: rain and dew return to the reservoir instead of evaporating in puddles.
* ASD extractors placed above the channels and not above the cold surfaces, so as not to suck away the moist air that is to be condensed.
* Draw up the water balance in a semi-arid climate (300 mm, 2 m of evaporation): that is where the cover decides between closed circuit and water tanker.
* Multi-blade windmill for make-up water presented as an autonomy option for V1 and V4, never as an energy source.
* Rain catchment under the tracker field on dry sites: impermeable strips and drains raise runoff from 25 to 85%, the cover removes the loss, the catchment creates the resource.
* Calculate the output of a hybrid plant with storage with an hourly model over 8,760 hours, code published and reproducible, rather than in equivalent hours: the V10 finds 200 GWh and 20% dispatchable instead of the 210 and 24% announced, and accepts the less good figure because it can be checked.
* Wind sensitivity table (5.5 / 6.5 / 7.5 m/s) showing that wind does everything and that no other parameter has this effect: the variable that makes or breaks the project, named.
* A 12-month lidar or mast campaign on the ridge before any decision, 0.15 M€, a condition of the financiers; in the mountains wind atlases do not see the speed-ups and wakes of the relief.
* Cite prior art, Gorona del Viento on El Hierro since 2014, and say what the Hydroloop does differently: closed circuit filled once, rain retention, covered reservoirs, a series of ten sites.
* Fixed photovoltaics on the southern slopes of the reservoir embankments, 1 MWp at 35 €/MWh on a slope that already exists, and which protects the slope from erosion.
* The Peltons in primary frequency reserve: the injector deflectors react in less than a second, 2 MW of reserve paid for by the grid without a battery.
* Optional local dispatchable load against curtailment, deferrable computing or agricultural cooling, cooled by the reservoir in a temperate climate but by dry coolers or a greenhouse in a dry climate, so as not to evaporate the water the V9 has saved.
* Show with the model that bigger pumps or a larger reservoir do not reduce curtailment behind a capped connection: they fill the reservoir earlier; only an on-site load answers it.
* Sheep grazing under the trackers in a temperate climate: replaces mowing, maintains the meadow, gives an agricultural use that counts in acceptance and authorisation.
* A written procedure for first impoundment: filling in 1 m steps with a 48 h stop and reading of the piezometers, pumping at 25, 50 then 100%, stop conditions set in advance.
* Also instrument geomembrane reservoirs, which the regulations do not cover: piezometers, gauges cast in the concrete, half-yearly survey, ultrasound on the pipe every five years.
* A thirty-day stock of parts, Pelton runner, injectors, MV cell, geomembrane and welder, shared across the ten plants of the series: the lead time for a Pelton runner is six to twelve months.
* Large-rotor IEC class III wind turbines (175 to 180 m for 6 MW) on a 6.5 m/s site: 3,600 hours instead of 3,160, the cheapest additional kWh of the whole plant (12 €/MWh), provided the lidar campaign confirms class III turbulence.
* Size the connection on output and not on installed power: going from 50 to 60 MW costs 1 M€ and returns 6 GWh a year by removing curtailment, the best ratio of the study.
* Power without the pipe to get it out is useless: 7 MW wind turbines behind a 50 MW connection curtail 24 GWh; the connection is sized before the machines.
* Apply the cost of the kWh per surface to the climate: the floating PV that saves the water of a dry site costs 45 €/MWh on a temperate site where water is in surplus; it leaves the base design and becomes the option that matches the climate.
* Generate on the market price within the peak window rather than by the clock: a 147 MWh stock chooses the 8 to 12 best-paid hours, 20 €/MWh more on 45 GWh.
* Portfolio maintenance: ten identical plants within 200 km share a team, workshop, stock, on-call duty and service contracts negotiated in bulk, 10% less OPEX without investment.
* Check that a modified model gives exactly the figures of the previous version when the old parameters are put back: it is the proof that nothing else has moved.
* Stop adding wind turbines when the twelfth gives the same kWh as the tenth for 16 M€ more: zero marginal return is the stop signal.
* Place the tracker field and its rain catchment upstream of the upper reservoir so that the collected water descends by gravity: 0.94 kWh of pumping avoided per m³, and one lift less.
* The site's clay, compacted over 30 cm like a dam core, replaces the catchment's geomembrane for 1 to 1.5 €/m² instead of 8 to 12; in the shade of the trackers and under 8 cm of gravel, it does not crack.
* The solar panels are already collecting sheets: 7.5 ha that are smooth, impermeable, cold at night; a gutter on the lower edge and two tracker positions (dew at 15° at night, rain at 20°) collect 95% of the rain and the dew for 0.2 to 0.3 M€.
* Count the collected water as energy and write it down even when it is small: 50,000 m³ at the top are worth 35 to 80 MWh, 3 to 7 k€; the money is in the tankers avoided, 0.2 to 0.4 M€ a year on a dry site.
* Cost an appealing idea before ruling it out and publish the calculation: condensation sheets give 10,000 to 13,000 m³ a year for 25 to 50 k€ a year, 2 to 25 €/m³, they beat neither the tanker nor the panels already paid for.
* Belt canal along the slope to enlarge the catchment of the rain retention: 27,000 m³ a year per kilometre of ditch, 50 to 100 k€.
* Write the options down in black and white with their LCOE, what they cost and what they lose, and give the floor (28 €/MWh) while specifying that it is not the base figure (35 / 29.5).
* A 200 m³ settling basin between a clay catchment and the upper reservoir: the fine particles of the first months do not reach the Pelton injectors.
* Size a ram's air vessel by Boyle's law: the pressure ripple equals the volume pumped per stroke divided by the vessel's air volume; twenty times the volume per stroke gives 5% ripple, fifty times 2%, and the vessel fills with water without a snifter valve.
* Multiply the plant by four with a constant dispatchable rule: the powerhouse, the retention, the substation and operation follow scaling laws of 0.7 to 0.8 and are diluted, the kWh falls by 5 €/MWh; it is the V13's only invention.
* Separate in the model the effect of size (5 €/MWh) and the effect of sacrificed dispatchability (2.5 €/MWh) before concluding: a sheet that mixes the two overestimates the merit of the sacrifice.
* Give the price of wind power in two columns, 0.91 M€/MW in series and 1.2 at market price: the gap between two versions does not depend on the column, the absolute level does.
* Above 100 MW, the connection is no longer a scaling law but another object, a 225 kV HV substation at 30 M€ and three to six years of lead time: it is the critical path, ahead of the embankments.
* A sheet coming from outside is checked in the site's model before being published, and its origin is written down.
* The big version is the plant for the best sites, at the head of the plan, not its base: ten times fewer compatible sites, it complements the standard version without replacing it.
* Anti-hammer vessel at the foot of the delivery pipe of a pumped storage plant: the simultaneous tripping of the pumps separates the column over 300 m and makes it fall back on the check valve; Joukowsky gives the overpressure, Boyle the air volume, nitrogen precharge at 80 to 90% of static pressure, then a transient calculation confirms; Peltons do not need one, their deflectors allow slow closure.
* Trip the pumps in pairs offset by a few seconds rather than all together: water hammer overpressure is halved without equipment.
* Beyond a factor of four, the size gain of a hybrid plant runs out: wind makes up 78% of the price and the floor is its own kWh; pumped storage adds a cost, it does not remove one. The next step is not a bigger plant, it is clustered plants that share the substation.
* Taller masts on a ridge: shear is low there (exponent 0.14), 30 m more give only 0.2 m/s, that is +4% energy for +5% wind price; in forest or on a plateau (exponent 0.2 to 0.25), tall masts gain twice as much. The lidar measures the profile, not only the speed.
* Wake steering: yaw the upstream machines by a few degrees to deflect their wake away from the downstream machines, standard software, 1 to 3% energy on a ridge-line farm.
* Depreciate the civil works of a pumped storage plant (reservoirs, pipes, retention, buildings) over 60 years and the wind turbines over 25, with repowering on the same structures: the two lifetimes are different, counting them together over 30 years overprices the kWh by 0.7 €/MWh.
* Variable-speed pumps to pump with the wind: fixed-speed pumps run at full power or not at all and curtail any surplus smaller than one pump; an hourly model that absorbs the surplus continuously assumes variable speed, it must be written down and paid for (10 to 15% on the item).
* Blade accessories (winglets, vortex generators, serrated trailing edges, Gurney flaps) are worth 1 to 3% and are already in the catalogue power curve: never count them a second time, nor redesign a blade yourself.
* Bifacial modules on light ground: 8 to 12% more on light limestone gravel (albedo 0.35 to 0.45), 15 to 18% on white gravel, provided the gravel is maintained; on grazed meadow, the gain falls to 5%.
* P-wave seismometer on the head valve of a pumped storage plant: P waves arrive a few seconds before S waves and close the valve before the shaking, as on Japanese pumped storage plants, for 50 k€.
* Close a series of versions when the remaining levers are no longer your own (the site's wind, the price of the commercial machine) and write it down: what is missing then is no longer a version, it is a site, a quotation and an engineering firm.
* When the positions are limited (short ridge, six positions), each position carries the best machine in the catalogue: going from 4.5 to 6 MW with a large rotor on the same six positions gives 45% more energy for the same landscape file.
* Take up the old versions with what the following ones have learned, instead of leaving them frozen: the revised V7 goes from 46 to 36 €/MWh without changing what defines it, and the original page stays online, dated.
* At small size, the fixed costs of a water loop (powerhouse, pipe, connection, controller) are not diluted: the 1 MW module remains the most expensive kWh of the family even when revised (39.5 €/MWh against 36 for six machines), and it must be written at the top of the page rather than presented as the base.
* When the stream flows at the bottom and not above the upper reservoir, a battery of hydraulic rams lifts part of its flow without electricity (300 L/s on a 16 m drop give 20 L/s at 160 m): 1% of the energy, but twenty times the evaporation, the guaranteed water of a closed circuit.
* A pico-turbine on the same drop would raise the same water through the plant's pump, with an extra alternator, converter and cable: on a site that wants autonomy, the ram wins by what it does not have.
* Size the turbine of a mixed pumped storage plant on the natural inflow plus pumping: a 1 MW Pelton turbines only 12 MWh per night, a 300 L/s stream at 160 m brings 10; going to 1.5 MW makes room for the previous day's pumping and gains a third of dispatchable output.
* The head and the torrent do not lower the kWh of a wind pumped storage plant, they guarantee it: at 600 m with 300 L/s, the kWh is that of the same plant without a torrent, but 10% of the energy is firm 365 days a year; this gain is paid for on a plan's power grid line, not on the plant.
* A dispatchable share calculated in equivalent hours is overestimated when the reservoir is not always full: run through the hourly model, the V6 falls from 47 to 38%, then to 27% with bigger wind turbines and the same turbine; announce the hourly figure, even if it is worse.
* Treated wastewater from a neighbouring city is free and constant make-up water for closed-circuit plants (V4 to V8, V12) and V14 Soleil: 150 to 250 litres per inhabitant per day, 8 million m³ a year for 100,000 inhabitants, that is the first filling in a few weeks instead of two to five years of rain, and evaporation covered with 3% of the flow; a pipe to the lower reservoir is enough; never into a reservoir or lake kept for the city's water, and a covered reservoir or tertiary treatment against algae.
* Treated wastewater does not need to reach the upper reservoir to produce: it only has to arrive above the lower reservoir with some head, through its own pipe and its own rain Pelton. At 300 m, 1 m³/s is worth 2.65 MW and 23 GWh a year, the constant flow of a city of 400,000 inhabitants; at 1,500 m, 13 MW. The cases where it works: two nearby cities at different altitudes, the upper city sends its water to the plant of the lower city; a city built on a slope whose treatment plant is not at the very bottom; a mine or quarry whose pit is lower than the local treatment plant, provided a low outlet evacuates the surplus. Never pump this water up to turbine it: 1.03 kWh spent per m³ for 0.74 recovered.
* Passing a treatment plant's water through the upper reservoir does not give one more kWh (the energy of a m³ is fixed by the head between the treatment plant and the lower reservoir, whatever the route), but it waits and is sold at the evening peak through the large Pelton, without a turbine to buy; and turbining the same descent twice, or pumping back to turbine again, never pays.
* A treatment plant's water is worth more than its kWh: 0.74 kWh per m³ at 300 m, 7 cents, against 0.30 to 1 € per m³ reused for irrigation or industry in a dry country; Hydroloop lakes and reservoirs are the seasonal reservoirs that reuse lacks, filled at surplus hours and emptied in summer.
* Where a city has no treatment plant, the Hydroloop brings one, extensive and frugal (lagooning, planted filters), preferably connected to the upper lake: water that would not have been cleaned is cleaned and then turbined; conditions: a city nearby and above the plant, domestic and not industrial water, a dry climate where water sells.
* Hydroloop lakes as gravity irrigation reservoirs: fields 30 to 50 m below the outlet receive pressurised water (1 bar per 10 m) without a pump, the metres above are turbined before the sale, and each m³ delivered by gravity instead of a m³ pumped from 50 to 100 m deep saves 0.3 to 0.5 kWh: a tenth of the plan's 410 km³ of regulated water is worth 12 to 20 TWh a year of savings, to be counted separately.
* The treatment plant as a customer of the power plant, behind the same substation: 0.3 to 0.6 kWh per m³ treated, dispatchable aeration like the V10's 3 MW load, a continuous customer day and night next to each urban plant, and when the head exists its water goes back down through the Pelton and pays its bill.
* A treatment plant's effluent is at 12 to 20 °C all year round: a heat source in winter and a heat sink in summer for the heat pumps of the district cooling of the V15 and the Titan.
* The city's water tower on the Hydroloop's slope, on two levels: raw water at the top in the lake, raised at surplus hours and sent back down to the drinking water plant while being turbined over the whole head; drinking water in a covered reservoir at 40 to 80 m, the height of the network, sized for two or three days and filled by the utility's pumps behind our substation when the kWh is worth nothing: 10 to 15 MW of dispatchable load per million inhabitants, 5 to 15 GW across the plan's cities.
* Never pump drinking water higher than the network needs (3 to 6 bar, 30 to 60 m): raising it to 300 m to turbine it on the way down loses 29%; the only legitimate turbine on drinking water replaces a pressure-reducing valve.
* A valley's power plant is also its water service (V19 Station Castle): drinking water by gravity from the lake, treated wastewater to the lake, a single operator, the city as partner rather than neighbour.
* The city's water drawn from the lake is turbined on its way down to the drinking water plant placed 50 m above the city: 250 m of head recovered out of 300, and no more pumps on the city side.
* Three days of covered drinking water reserve at the height of the network, where cities only have twelve hours: the security that the lake makes possible.
* A water service at cost price is worth more than a profit: it is what gets the plant accepted, and what gives it the land and the lower lake.
* A world plan has three payers, not one: public budgets and energy companies for the plants, private bills and rents for the panels and towers, water bills for water services; what is paid for by water does not weigh on the energy budget and is shown separately.
* Avoided energy (pumping of drinking and irrigation water replaced by gravity, 27 TWh a year in the plan) is counted in a separate column, never added to production, like the energy shifted by the Sky.
* A water surface already built and already connected to the plant's substation is free solar land: it is covered, but after the plant, never before (V20 O Sky).
* A storage plant whose pumps are already full during surpluses does not store the solar added to it: a Sky's floating PV is sold directly, its value is that of floating PV, not that of storage, and adding pumps to store it does not pay (V20 O Sky).
* A Sky and its floating PV hedge each other: the prices that narrow the gap between surplus and high demand make the Sky lose and the floating PV gain (V20 O Sky).
* On a windy lake, the hybrid island beats conventional floating PV because it sells a quarter of its energy at night and in winter; without wind, conventional floating PV (V20 O Sky).
* Covering the freshwater lake of a coastal Sky saves 0.5 million m³ a year for the city: water revenue that is not in the kWh (V20 O Sky 3).
* When a lake is level with the lower reservoir, the lower reservoir is no more than a lock in front of the pumps: 200,000 m³ instead of 800,000, 9 M€ less, not a GWh lost (V20 O Sky 2).
* A bigger turbine is worth nothing when high-demand days number 18 a year: what limits a storage plant is the number of hours when the MWh is expensive, not the water or the pipe (V20 O Sky).
* The cheapest kWh is not the plant that earns the most: the Gold 2 has the cheapest MWh, the Sky 2 the best margin per MWh, the O Sky 2 the most money per year on the same site (V20 O Sky).
* Apply the ranking by cost per GWh inside an old plan, not only to its additions: the plan A of 7 October carried 1,360 billion of V7 and V4 modules at 0.52 and 0.55 M€ per GWh that V14 Soleil at 0.47 replace for 190 billion less (Artesia 2 plan).
* The feasibility of a plan is also counted in the number of doors to open: 52,500 small plants replaced by 3,120 large ones is the same electricity with half as many sites, public inquiries and connections (Artesia 2 plan).
* Keep what the large plant does not guarantee, even if it is more expensive per GWh: the V5 and V6 on torrents (50 TWh guaranteed 365 days) and the V3 on streams stay in the plan, the V7 and V4 without guaranteed water leave it (Artesia 2 plan).
* Monsoon plateaus are sunny and rainy: a V14 Soleil there receives a Pacha lake, and the cheapest TWh of the plan (0.18 M€ per GWh) is found where sun and rain meet (Artesia 2 plan).
* Count the sites by machine before promising them: a free 1 km relief and solar atlas are enough to scan the whole sun belt in an hour and say how many 7 km² plateaus overlook a 300 m slope (21,986), instead of an order of magnitude to within plus or minus 50% (sun belt scan).
* Count only the edge band of a large plateau: a plant needs the slope as much as the plateau, and a 1,000 km² plateau is worth its edge divided by 3 km, not its area divided by 7 (sun belt scan).
* A caution coefficient of three on sites counted without land use: what a scan does not see (fields, protected areas, nomads, water) is paid for before quoting the figure (sun belt scan).
* The large V14 Soleil resources are not where they were expected: Ethiopia, Mexico, Peru, Tanzania and Madagascar come ahead of Arabia and Rajasthan when plateau edges are counted rather than deserts (sun belt scan).
* Cross people before fields: what blocks 7 km² of trackers are the villages and families to be moved, not a field that can be negotiated; the degree of urbanisation at 1 km, free and global, is enough to classify each plateau as free, shared or occupied, and a shared plateau counts for half (crossing of the plateaus with people and rain).
* The sunniest plateaus are those without rain: 3,223 class A sites below 75 mm, the Atacama, the Sahara, Arabia; a V14 Soleil lives there with a pipe or a borehole powered by its own electricity, and it is a variant to be costed separately, not a reason to rule them out (crossing of the plateaus with people and rain).
* When the sites are counted, the plan is calculated on the list and not on averages: ranking 20,298 sites by M€ per GWh of a plant placed on them, sun, rain and make-up water included, and taking them in order, gives 7 to 17% more output per plant for the same price, and the plan stops on its own where the last site taken costs more than an existing plant (Artesia 3 plan).
* A plan that counts only large plants on stone plateaus has fewer doors to open, but they are all in the same hands: when private bills fall to zero, the plan depends only on States and lines between countries, and what it gains in sites it loses in payers (Artesia 3 plan).
* Count what exists before digging: a peaking dam already has its lake, its head, its turbines idle 19 hours a day, its free substation and its water permit; the Hydroloop placed on it only has to pay for its trackers and pumps, 0.357 M€ per GWh at Hoover instead of 0.409 for a V14 Soleil in the same sun, and no new lake (V21 Barrage).
* Water lent, not taken: on a river where every cubic metre is allocated, a plant that raises by day what it lets down in the evening touches no water right, and it is the first line of the file (V21 Barrage).
* Reopen a line closed by what exists: the V3 and V11 left the plan because their reservoirs and water inquiry cost too much; on the 3,764 small peaking dams that already have a lake and a permit, they come back at the price of a V14 and give the decision back to municipalities and public utilities (V11 Barrage).
* Measure the edge wind before marrying wind and sun on a plateau: the sunniest plateaus are under the tropical high pressures, where the wind is weakest, and their edge band is short; of 4,880 planned mixed plants, 290 have 12 km of edge at 6 m/s, and beyond 2,100 tracker hours the V14 Soleil alone sells more than the mixed plant (wind scan).
* Count the ridges near grids, not only the windy ridges: the ridges that overlook a 300 m slope are almost all windy, but three quarters are in Kamchatka, Alaska, the Yukon, eastern Siberia and Patagonia, more than 150 km from a city of 100,000 inhabitants; a ridge line is counted with its city (wind scan).
* Put all kinds of sites into a single list before ranking them: a plateau, a ridge and an existing dam are compared by M€ per GWh like three plants, and the single list places by itself the windy ridges first (0.36), the dams next (0.40), the plateaus after (0.43), with no quota by type or by country (Artesia 4 plan).
* Remove a mixing rule when measurement contradicts it: "one plant in two is a mixed plant" assumed wind on sunny plateaus; measured, it is hardly there, and the list keeps only 69 mixed plants where the edge really has it (Artesia 4 plan).
* Bring together on a single site the plants that a large plateau can carry: a V14 Soleil MAX 3 keeps one slope, one powerhouse and one substation for six, and 9,480 V14 Soleil of Artesia 5 become 5,520 plants; the gain per kWh stays at 10% because the panels do not get cheaper with size, but the number of construction sites falls by 42%.
* On a long ridge, keep all the wind turbines and a single hydraulic site in the middle, connected by an electrical backbone: the V14 MAX 2 over 60 km is the right size, beyond that the backbone eats the gain; and wind counts more than size, a single V14 on a ridge at 7.7 m/s beats a MAX 3 at 6.7.
* Size pays all the more when a plant has few things that multiply: a V15 Canyon, almost all shaft, cavern and reservoirs, gains 19% as a MAX 3, a V14 whose wind turbines or panels make 60% of the price gains only 7 to 10.
* Place storage on the map before counting it: real 1,000 m ramparts are lower and less steep than the reference V15, 1,275 of them are needed instead of 1,000 for the same storage, and they are missing where the largest surpluses are (Western Europe, northern India, the eastern United States, eastern China).
* Take measured costs rather than the price level to cost a plant in a country: China and Spain build their solar farms at the same price, South Africa is the most expensive despite its low wages; it is the size of the market that makes the price, and the same plan costs about 1,150 billion less at the price of each country.
* Count the hour and not only the year: a plan that produces mostly at noon must return more than half of demand in the evening; shifting one fifth of consumption to the middle of the day (vehicle charging, electrolysis, stored cold, water heaters) halves the missing storage.
* For evening storage, enlarging the reservoirs of an already built V14 (135 million euros per GWh, 107 on a MAX 3) costs less than a V15 on a real rampart (240 to 290): the plan's battery is on the plateaus and ridges, the V15 keep the cities where their services count.
* Give a floor of electricity to the countries that have almost none rather than only replacing their fossil power: a country that burns nothing receives nothing from a replacement plan; 500 kWh per person and the connection of 696 million people cost 5% of the plan.
* Produce the added electricity in the country that consumes it: the best sites of poor countries cover their own inhabitants, nine added kWh in ten are produced locally, with the jobs and the revenue.
* Make growth clean before it arrives: the electricity that poor countries will consume anyway would emit about 350 million tonnes of CO2 a year with diesel and coal.
* On a less sunny plateau, enlarge the solar field of a V14 Soleil without touching the reservoirs or the machines: at 1,600 hours of sun, 700 MWp instead of 500 lower the cost of the kWh by 6%, and at 1,200 hours, 900 MWp lower it by 15%; to be reserved for countries that have room, because each plant then occupies more plateau, and a country that lacks sites loses more than it gains.
* Keep summer for winter in a lake that exists: holding back part of the river's water from May to August and turbining it from November to February requires no structure and loses nothing, since the water is not pumped, it waits; on the Hoover dam, 412 GWh shifted and a winter that goes from 27 to 33% of the year.
* The lower lake lends the water that the upper lake holds back: the valley receives the same water on the same dates, and it is the volume of the lower lake that sets the size of the seasonal reserve.
* A storage plant pays for itself by the number of times it is used: an every-evening reservoir is worth building, a reserve used only once a year is only worth it in a lake already paid for.
* Each lake has its role: a Hydroloop's reservoir for the evening, a Sky's lake for the bad week, a large dam's lake for the season.
* Cross all sites with protected areas before calculating, and search further rather than ask for exceptions: 14,184 sites ruled out of 53,741 cost 1,245 billion, and three site searches (up to 600 km from cities, plateaus from 1,400 hours of sun, plateaus from 35° to 50° latitude) give back 1,295 (Artesia 7 plan).
* Do not spread over the year the 5% of fossil power a plan keeps: placed in the season where they serve best, 700 TWh out of 914 go to winter, and the remaining gas plants become a winter reserve (Artesia 7 plan).
* Ask existing dams to keep part of their water from one season to the next, without exceeding a tenth of their output: the calculation thus shifts 317 TWh a year to the weak season, without any structure, and the plan saves 208 billion (Artesia 7 plan).
* Cap each supplier rather than total imports: no more than half of a country's need from the same neighbour costs only 23 billion, with 317 smaller lines instead of 135; a country that wants more independence remains free to pay more (Artesia 7 plan).
* Pay for risk in advance instead of leaving it unknown: a guarantee against political risk on everything built in fragile countries costs 70 billion and makes the plan's costs more certain (Artesia 7 plan).
* An exit rule rather than an exclusion: in a country in conflict, build only what serves its inhabitants, and keep its export plants for the day it leaves the list; peace opens up an income that the plan reserves for it (Artesia 7 plan).
* Size a 25-year plan on the population of the middle of the plan, not on that of the start: 1,182 million people to connect in 2038 instead of 696 (Artesia 7 plan).
* Cost connection where people live: a 1 km population grid classifies settlement into seven types, from densification in the city to an autonomous system in scattered settlement, and the bill goes from 332 to 187 billion (Artesia 7 plan).
* Count half of flexible demand, not all or nothing: the first figure ignores what is already being done, the second assumes that everyone plays along; half saves 336 billion (Artesia 7 plan).
* A plan gives a base, not a ceiling: once fossil electricity is replaced and the minimum ensured, everyone can add panels on their roof, a small wind turbine or a water turbine in their stream (Artesia 7 plan).
* Uncertain idea, to be checked before using it: a Pacha's rain lake as a polishing stage for treated wastewater (a stay of several weeks, nitrogen, phosphorus and pathogens falling), never in the closed versions nor in lakes that serve a city.

------------------------------
WHAT THE TITAN TOWERS TAUGHT US
------------------------------
Titan review (in French)

* Publish your own mistakes with the corrected calculation, without deleting the old pages.
* List the ideas to keep separately from the figures to forget.
* Put a dated archive banner rather than rewrite the site's history.
* Name each mistake precisely (Betz limit, Venturi in an open mesh, steam cycle at 100 °C, flywheel at 1,250 m/s) so that the reader learns something.
* Bicycle-wheel structure (a rigid ring carried by tensioned spokes) to hold a large horizontal bearing with little material.
* Prefer a tapered roller bearing to magnetic levitation: the friction removed costs 1 to 2%, levitation consumes permanently.
* Check every announced output with an hourly model over a year, assumptions visible, before publishing it.

------------------------------
TITAN TOWERS (APRIL AND MAY 2026, ARCHIVED)
------------------------------
Titan Simple Hydro (in French) | Titan MagLev (in French)

* Open honeycomb exoskeleton: the air passes through, the skin produces, the floors breathe.
* A water pool at the base of a tower as thermal mass and rain reserve.
* Empty or lower the pool by emergency procedure before a storm.
* The interior volume of a power tower must serve a purpose: rents, servers, parking.
* Vertical-axis rotor for urban wind, which is shifting and turbulent.
* Blade tip speed limited to 30 m/s: silence, birds, acceptance.
* Generator at the bottom of the rotor, reachable by lift, not in a nacelle.
* Multi-effect vacuum distillation powered by waste heat at 65 °C to desalinate without dedicated electricity.
* Nothing load-bearing rests on water or on glass: the tower brings its loads down to the ground through pillars.
* Any structure above a pool keeps 20 to 30 cm of air above the maximum level: no drag, no corrosion, no deposits.
* A water enclosure at 100 °C, even under slight overpressure, falls under pressure equipment rules: high-flow relief valves to a safety condenser.
* Closed hot water loop treated like central heating: deoxygenated and inhibited water, never air injected.
* No hydraulic turbine in water close to boiling: cavitation eats the blades in a few weeks.
* Generator and mechanical parts in a dry pit above the maximum water level, without an immersed rotary joint.
* Foundation piles fitted with heat exchangers (energy piles): the foundation needed anyway serves as a source for a heat pump.
* Hydraulic rotary joint on the axis of a moving solar collector: the fluid passes through the pivoting structure without twisting the pipes.
* Heliostats controlled by astronomical calculation rather than light sensors: the sun's position is known, insensitive to clouds and reflections.
* Safe position with the mirrors turned face down in the event of hail or a sandstorm.
* For base heat outside volcanic zones, the real geothermal option is deep drilling at 3,000 to 5,000 m with monitoring of microseismicity.
* Use the oxygen from electrolysis on site, in the aeration of a wastewater treatment plant or a fish farm (trials at Landau in Germany and by ARENA in Australia), rather than compressing it to sell: the market is local and compression costs more than the selling price.
* Waste heat at 60 to 65 °C is enough to regenerate an amine sorbent for direct air capture of CO2 with an air sweep and a slight vacuum (more than 85% regeneration measured at 60 °C by VTT and LUT), but the CO2 comes out diluted: good for enriching a greenhouse, not for geological storage which requires pure CO2 and 100 °C.
* A tuned mass damper, solid or liquid, is placed at the top of the tower where the amplitude is greatest, weighs 0.5 to 2% of the modal mass and is tuned to the natural frequency; a free mass of water at the foot damps nothing.
* Photovoltaics go on the fixed parts (mast, nacelle, buildings, skirt), never on parts under cyclic bending nor behind a rotating collector: flexible cells on blade arms undergo 20,000 cycles a day.
* Cyclic pitch on a vertical-axis rotor has only been demonstrated below a few tens of kW; jumping straight to an 80 m rotor is a factor of a hundred in size and ten thousand in mass: a mechanism is only extrapolated by a factor of three to ten per step, prototype after prototype.
* Before announcing a resource in a discharge, calculate the concentration: lithium from seawater at 0.17 mg/L requires 6 million m³ of water per tonne; desalination brine is only worth its salt, and its discharge diluted by diffusers.

------------------------------
TITAN CLAUDIA 1, 2, 3, 3 PARIS, 4, 4 PARIS, 4 PARIS STYLE, 5, 5 PARIS AND 5 PARIS 80
------------------------------
V1 (in French) | V2 (in French) | V3 (in French) | V3 Paris (in French) | V4 (in French) | V4 Paris (in French) | V4 Paris Style | V5 | V5 Paris Cône (in French) | V5 Paris 80 (in French)

* Data centre as a dispatchable load: consume when the wind blows, reduce when it drops.
* Waste heat from the servers stored in the pool at 35 to 45 °C and sold to a low-temperature heating network.
* Cool the servers with a seawater or river water exchanger, without a chiller.
* Sodium-ion battery rather than lithium in urban areas: no cobalt, no thermal runaway.
* Tripod with a top bearing to hold a vertical rotor mast at both ends, a direct answer to the stopping of the Éole wind turbine.
* Two half-power generators: better efficiency in light wind, redundancy in case of failure.
* Cost each photovoltaic surface with its own cost per kWh and rule out those above 200 €/MWh.
* Photovoltaic carports over the car park: the cheapest solar of the tower, and compulsory in France (APER law).
* Rent the top to telecom operators.
* A section "leads studied and ruled out" with the figures that caused them to be ruled out.
* Compare the same tower on two sites (coast, Paris) to show what makes the result.
* Give both cases, land provided free and land bought, instead of just one.
* Write that the first tower will cost 30 M€ and produce what it produces.
* Heat pump to raise waste heat from 35 to 45 °C to 65 to 70 °C and sell it to conventional heating networks.
* Cooling and heating network using sea or river water (Thassalia in Marseille, Fraîcheur de Paris): the chiller rejects into the water, not into the air.
* Sell electricity as vehicle charging under the carports at 0.29 to 0.42 €/kWh rather than to the grid at 0.09.
* A 10 m clearance between the blade tips and the tripod legs to avoid a pressure shock at each pass.
* Sloping skirt around the base: panels laid on a frame that exists anyway, the cheapest kWh of the tower.
* House the data centre in the windowless volumes and the offices on the floors lit by the façade.
* Protect a quayside data centre against flooding: raised floors, tanking, access above water.
* Provide cleaning access and snow guards on a large sloping solar roof.
* Measure the wind on site for a year, by mast or lidar, before any decision in an urban setting.
* Say which assumption makes or breaks the project (the land) and which weighs little (the wind, less than 20% of revenue).
* Count interior fitting-out (400 to 600 €/m²) separately from the bare structure when announcing a rent per m².
* Decide height in 16 m slices, one rotor stage against four office levels: on a coast both pay back in 6 years, in Paris the office level wins by a factor of ten; hence two opposite towers for two sites.
* Grow the rotor by diameter before height: 80 to 100 m means 25% more swept area without one more metre, at constant tip speed.
* Widen the skirt rather than the carports: 30 m high up to 75 m from the axis, the cheapest kWh of the tower on top and five levels of data centre below, the tripod legs passing through it.
* Place an urban rotor at the very top, above the offices: four stages at 164 to 228 m produce more than half of eight stages at 70 to 198 m.
* Cost the variant without a rotor and write it down: it costs 15% of the tower for 3% of revenue, and it is what justifies the land provided free.
* An on-site data centre of 25 to 40 MW replaces half of the battery by modulating its load by a few percent.
* Industrial hybrid panels on the quay, upwind of the tower: 0.65 M€ per annual GWh against 2.1 for the tower, they pull the average kWh down.
* A rotor on a roof is placed above the recirculation bubble, which rises to about 30% of the building's height: hub at least 30 to 40% of that height above the roof (studies by TU Delft and the University of Malta), otherwise it turns in turbulence and can even work as a propeller.
* On a coast, fill the rotor mast from bottom to top: the lowest stage still receives 85% of the energy at the top and its marginal kWh (73 to 80 €/MWh) is cheaper than the tower's average, because the tripod, mast, trunk and connection are paid for anyway; removing lower stages raises the kWh.
* Remove the offices from a coastal tower when their letting is not certain: a rotor stage instead, no more vacancy risk, no more high-rise building, a single tenant who is also the customer for the power.
* Cost in a series of 10 and in a large series (that of the world plan) in two columns, and write that the reduction comes from the size of the series, not from the machine.
* An all-wind tower without a base is not worth a conventional wind turbine: the cyclic-pitch rotor on a mast held at both ends costs 2.35 M€/MW and what carries it 1 M€/MW more; the Titan Claudia only makes sense because its structure is occupied and its customer is on site.
* When the rotor mast is short (64 m for 3.2 MW in Paris), hold it from below only with a 6 to 8 m shaft and a reinforced bearing, like the Éole wind turbine, and remove the tripod: 4.5 M€ less and a silhouette without legs; on the coast, with a 176 m mast, the tripod stays.
* The tripod, when kept, with straight legs: simpler to calculate, identical sections, the skirt passes between them without cutting.
* The window versus panel rule in Paris: one m² of office façade lights 57 m² rented at 450 €/m², about 1,500 € a year; the same m² in panels makes 90 €. Ratio 17 to 80: solar goes on what does not need windows (podium, skirt, roof, cap), never in place of a window.
* Widen an office trunk around a column atrium rather than around a solid core: a 15 m ring of offices between the façade and the service ring, the atrium up to the glass roof, the lifts in the service ring; everything that remains is less than 15 m from a window or the sky.
* A light atrium must be at least a third of the height remaining above the level it lights; as a column, not a cone, so as not to empty m² where they are most numerous.
* In a wide cone, house the services (toilets, archives, meeting rooms, projection) in the windowless core between the office rings and the atrium: the normal 15 to 25% of windowless rooms in a building, grouped in the centre.
* The data centre in a windowless podium, never around a light well.
* Free the carport land when the parking fits in the podium or under the skirt: 1.8 ha less to request or buy is worth more than 1 GWh at 122 €/MWh.
* Cost an elevated solar canopy with its frame: braces at 45° rather than cantilever, posts or cables (which do not resist uplift), open decking; at 150 €/MWh it is only worth it as a canopy.
* A tower three times bigger at the same yield is not a more profitable tower: it requires three times more land provided free and a capital-city market; keep a series version and a capital-city version.

------------------------------
REVERSIBLE PASSIVE AIR CONDITIONER ASD (LOW-TECH KIT AND VERNET VERSION)
------------------------------
Reversible passive air conditioner ASD (in French)

* White dome, static extractor and bed of wet stones: evaporative cooling without electricity.
* Kit version at 220 €, assembled in 1 h 30, for dry climates.
* Vernet wax thermal actuator to switch between summer and winter without electronics.
* White mould in summer, black cap in winter: the same roof heats or cools depending on the season.
* Limit to be written on the page: evaporative cooling does not work in a humid climate.
* Fresh air intake on the north side in the shade and extraction head in full sun: separate the source of coolness from the draught engine.
* Louvres closed by a return spring as soon as the wax contracts: closed safe position without any energy.
* Louvres closed at night: the dome becomes a dead air layer that limits heat losses.
* A watertight upstand between dome and roof so that the extractor draws indoor air and not roof air.
* Assembly manual as a wordless comic strip for assembly in the field without a language barrier.
* Local structure of bamboo arches and lime-washed canvas, only the extraction module being imported.
* Size the watering of a stone bed on latent heat: one litre evaporated gives 0.68 kWh of cooling, so ten litres a week make only 40 W on average; watering must be continuous or daily, and the air must be dry.
* Using the ground as a cold source requires probes or piles of 10 to 30 m with a circulating fluid, at 20 to 70 W per metre depending on the soil (VDI 4640): four 3 m piles give a few hundred watts with a fluid, a few tens with air brushing past them.
* The extractor at the top of the stairwell only works in a detached house: in an apartment building, the stairwell is a volume protected by fire compartmentation and must never be used as a ventilation chimney.
* A wax actuator gives 8 to 10 mm of stroke and a few hundred newtons, that is 2 to 4 J per stroke, one stroke per thermal cycle: enough to open a shutter or a valve, never enough to pump or drive an airlift.

------------------------------
DOMESTIC SOLAR VENTILATOR ASD-500
------------------------------
Domestic solar ventilator (in French)

* Solar chimney as a motorless air extractor, which draws most when it is hot.
* A complement to existing ventilation rather than a replacement.
* Sliding ceiling hatch operated from the floor by a rod with a ring, without a ladder.
* Wide indoor inlet and narrow outlet neck: the neck sets the flow, the wide inlet avoids whistling.
* A single extractor at the highest point, stairwell or central landing, to drain the whole house.
* EPDM washers and lock nuts not fully tightened to fix a plastic part onto metal that expands differently.
* Measure the real flow on the installed prototype before announcing an air change figure.

------------------------------
CHAPIPET AND CHAPIGAZ
------------------------------
Chapipet (in French) | Chapigaz (in French)

* Agricultural and landfill methane is a real lever, faster than CO₂ on a ten-year scale.
* Flexible cover for a slurry pit with biogas collection, provided it is drawn under negative pressure.
* Burn the methane on site for the farm's heat rather than storing it.
* Biogas treatment chain in order: condensate trap, iron oxide for H2S, activated carbon for siloxanes, particle filter.
* A cogeneration engine accepts biogas at 50% methane; bottling would require 95% and 200 bar.
* Capture the gas as soon as the waste is deposited in the active cell, by organising the landfill in successive sectors.
* ATEX components, earthing tested before each move, half-yearly calibration of the sensors with a calibration gas.
* Flame arrester and check valve between a gas collector and the building; diaphragm pump whose motor never touches the gas.
* One-tenth scale model with an incense stick to visualise the flow before any prototype.
* A flexible balloon that inflates and a camping gas detector as a collection test at almost zero cost.
* Methane sensors at several heights to measure whether stratification really exists before building on it.
* Consumables (carbon filter) on the ground and not up high; hysteresis and minimum run time so that a pump does not cycle.
* Reduce enteric methane with a feed additive (3-NOP, red algae) rather than trying to capture burps in the building's air.
* For methane diluted below 0.1%, catalytic oxidation at the ventilation outlet rather than capture: it does not burn below 4%.
* Never design a circuit where methane can pass through the explosive range of 5 to 15% in air: either very dilute (barn ventilation), or rich (digester, covered pit under negative pressure), never in between.
* The heat from the cogeneration engine (jacket water and exhaust, about 1 thermal kWh per electric kWh) keeps the closed digester at 35 to 38 °C: it is the biogas standard, and it only applies to a closed digester, not to a mass under an open skirt.
* Under-slat extraction (pit ventilation) is good practice for the barn's air, it removes ammonia and hydrogen sulphide at the source, but it is not a source of methane: the gas there stays at a few hundred ppm, ten times too dilute to be captured.

------------------------------
MUHLEISEN MILL AND MUHLEISEN HEART (MSMM)
------------------------------
Muhleisen mill (in French) | Muhleisen heart (in French)

* Archimedes screw on a diversion canal: simple pico-hydro, fish-friendly.
* Recover raw mechanical power for crafts without going through electricity.
* Fixed and floating bearings, with increased clearance, to absorb the expansion of a long shaft that heats up.
* Expansion vessel at the high point sized at ten percent of the oil volume.
* Simple magnetic coupling as a torque limiter: it slips if the screw jams, restarts without breaking anything.
* Temperature probes in screwed thermowells so they can be replaced without draining; one probe per bearing for wear alerts.
* Batteries at the bottom of the cabinet, away from heat sources: their lifetime halves every ten degrees.
* Biodegradable ester oil for any oil-filled machine installed beside a river.
* 24 V backed-up supply that keeps the probes and circulation pump running after a power cut to remove thermal inertia.
* Rotor magnets housed in dovetails with 0.1 mm clearance filled with epoxy, then a carbon sleeve wound under tension: mechanical centrifugal retention, the glue is only a backup.
* Offset each magnetic disc angularly by a few degrees on the shaft to smooth the torque and remove cogging jerks.
* Hybrid ceramic ball bearings in a magnet machine or under a variable drive: they insulate and prevent pitting of the raceways by stray currents.
* Mount the parts deliberately offset when cold, by the value of the calculated expansion, so that they are centred at operating temperature.
* FKM lip seals with stainless springs for any oil above 120 °C, mounted on a ground surface longer than the expansion travel.
* Inject the coldest return oil first onto the bearings, then towards the hot zone, so that the bearing stays the coolest point.
* The Archimedes screw keeps an almost flat efficiency when the flow varies, a decisive advantage on small, irregular watercourses.
* A magnetic gear transmits power without contact or lubrication, with a practical ratio of 5 to 10 per stage and a safety slip under overload; it never multiplies energy, and the slip heat is a loss to be removed, not a resource.

Uncertain ideas, to be checked before using them:
* Shaft expansion increasing the air gap as a passive overheating safeguard: the effect exists, but a few tenths of a millimetre per ten degrees change the torque too little to regulate anything.
* Buoyancy of the oil relieving the bearings of aluminium rotors: real, about a third of the weight, but the dominant loads are torque and magnetic forces, not weight.

------------------------------
SHORE POWER AND OFF SHORE WAVE POWER PLANTS
------------------------------
Shore Power (in French) | Off Shore (in French)

* Anchored pillar and ring float: the moving part at sea is reduced to a minimum.
* All the machinery on land in an accessible building: maintenance without a boat.
* Linear generator rather than a hydraulic chain.
* Mechanical rectifier with two sprag freewheels: the float's back-and-forth becomes a one-way rotation, without shock.
* Small conventional steel flywheel on the rectified shaft to cover the seconds between two waves, peripheral speed limited according to the steel.
* Hollow rather than solid shaft: stiffer for the same mass, critical speed pushed back.
* Lattice walkway above the breaking zone carrying the shaft, its bearings, the pipe and foot access.
* Universal joint on the pillar side and flexible coupling on the building side to absorb differential settlement.
* Desiccant breather and magnetic drain plug on every mechanical housing in salt air.
* Winch to take the float out of the water before a storm and clean off biofouling without a diver.
* C5-M epoxy paint plus sacrificial anodes: the paint protects, the anodes only cover its defects.
* Electrically insulate aluminium from a stainless shaft (PEEK bushings, epoxy primer) to avoid galvanic corrosion.
* Submarine cable in two sections: dynamic in an S shape with floats, static armoured and weighted on the bottom, with a pulling sock on the mooring block.
* Elastic mooring calculated so that the buoy dives under an extreme wave rather than breaking.
* Launch subject to sea conditions written in advance, with a step-by-step procedure for divers and crane operators.
* The whole thermal loop on land, cooled by a simple seawater pump with a strainer always submerged, without an underwater heat exchanger.
* Building above the highest storm seas, blind walls on the sea side; dry chamber and right-angle gearbox 1.5 m above the highest astronomical tides.
* Aluminium-zinc-indium anodes rather than zinc in open sea: capacity per kilo doubled, lighter, without cadmium.
* Marine shaft in super duplex stainless steel: three times the yield strength of 316L and resistance to chloride pitting.
* A pair of optical fibres integrated into the submarine power cable to bring the controller's measurements back to land.
* Flywheel on the high-speed side of the alternator and downstream of the torque limiter: reduced mass, an upstream blockage remains harmless.
* Balance any flywheel statically then dynamically to grade G2.5 (ISO 1940), correction by drilling blind holes.
* Harden the seal surfaces of a duplex stainless shaft by low-temperature plasma nitriding only (300 to 400 °C, expanded austenite without chromium nitrides, corrosion resistance kept or improved); conventional nitriding above 450 °C precipitates chromium nitrides and ruins corrosion resistance.
* Provide an explicit survival mode for the wave energy converter, locking the float in the high position or detuning the control, chosen by simulating the mooring loads in the design sea, rather than a simple declutching that lets the float hammer against its stops.

------------------------------
FRESNEL DOME, FRESNEL TURBINES, OWATER SPHERE, MCOLD PANELS
------------------------------
Fresnel dome (in French) | Fresnel turbine (in French) | Fresnel turbine Max (in French) | Owater sphere (in French) | Mcold (in French) | Mcold Piston (in French) | Mcold Max (in French)

* Concentrate the sun on a sphere of water as daytime thermal storage, thermally, not electrically.
* Garden concentrated solar water heater coupled with photovoltaic wings.
* Water-cooled photovoltaic-thermal: a few percent more efficiency and lukewarm water.
* East-west profile to match the self-consumption curve rather than due south.
* Floating panels on a pool: cells at 25 °C instead of 60 °C, provided they see the sky.
* Combine a small vertical wind turbine and collectors on an existing roof: the integration idea, not the figures.
* Solar cooling with a water and lithium bromide absorption machine: summer heat makes the air conditioning, COP 0.7, without a compressor, provided 80 to 95 °C is reached.
* The harder the sun beats down, the greater the need for cooling and the greater the thermal power available: demand and resource are in phase.
* Buried and insulated pool as low-temperature inter-day heat storage.
* Selective coating (TiNOX type) on the absorber: it absorbs sunlight and radiates little infrared.
* Store cold in a tank of water or ice in the afternoon to cool in the evening.
* Fixed, low structure, resistant to the mistral, but then without lenses: a fixed concentrator does not concentrate, a greenhouse over a black pool does the same job.
* Say on the page that it is a demonstration for the general public, not an extraordinary invention.
* Collective self-consumption in an apartment building: a kWh avoided is worth 0.22 € instead of 0.06 € sold back, it is the real lever of urban solar.
* PV-T façade on the top south floors: the building's cold water rises, cools the cells and preheats the domestic hot water.
* Reject a condenser's heat into the domestic hot water circuit rather than into the air.
* Start from a fixed budget (100,000 €) and size each item within it, even if the items are then underestimated.
* The true sentence of the page: a small 15 kW wind turbine pays back in 10 to 12 years, and the three sources do not add up on the generator's power.
* Rotating machines on a roof: sub-frame on elastomer pads and floating slab so that nothing is transmitted to the concrete.
* A windless summer is the low season of a small wind turbine: pair it with a solar source that produces precisely then.
* Polycarbonate (withstands 120 °C) rather than PMMA (softens around 80 °C) for any transparent wall over water heated by the sun.
* A vent is compulsory on a closed transparent enclosure containing heated water, plus a safety valve at the low point.
* Interlock: a concentrating lens never stays exposed when the water target is emptied.
* Solar distillation: it is the gap between hot water and cold wall that produces; keep the condenser in the wind, never under a greenhouse.
* Plate heat exchanger between process water and domestic water, with an anti-scald thermostatic mixer at the outlet of the solar circuit.
* Coded hierarchy of safety functions: hail closes the shutters, strong wind lays everything flat, overheating covers; the pump keeps running to dissipate.
* In a hybrid circuit, the coldest water first passes behind the cells, then, warmed, through the thermal collector.
* Settling pot at the low point emptied for a few seconds a day: sediments leave without draining.
* One MPPT or micro-inverter per orientation: east and west panels in series throttle each other.
* Slopes of an east-west profile limited to 15 to 20° on a roof: beyond that, a ridge shades the opposite slope as soon as the sun is low.
* Plate-and-tube absorber pressed against the back of the panel with thermal paste and 2 cm of insulation behind.
* Closed circuit with propylene glycol, expansion vessel, flexible fittings and thermal relief valve at around 80 °C.
* Measure before asserting: flow × temperature difference × 4,180 gives the thermal power; test a single panel first.
* Look for prior art (DualSun, studies on the M layout) before announcing an invention.
* Hysteresis on actuator control and checks spaced several minutes apart: no micro-movements that cause wear.
* Actuator base offset from the vertical of the hinge to avoid the dead point when the panel is flat.
* A single camshaft along the whole length with a single geared motor: synchronised panels, self-locking mechanism, can be enclosed.
* Separate control and power: optocoupled relays, fuse, limit switches, IP66 enclosure in the shade.
* Two photoresistors on opposite faces: the difference indicates the sun's side, weak everywhere under an overcast sky where flat captures better.
* Fold-down flap against hail, made of a replaceable flexible sheet, which also serves as a cover in case of overheating.
* Flowmeter at the end of the circuit: zero flow while the pump is commanded signals a failure or leak and triggers the fallback.
* Control the pump on an inlet-outlet difference of about 10 °C by PWM rather than a fixed flow.
* Self-lubricating polymer bushings for outdoor joints rather than steel bearings that seize.
* Watchdog: periodic signal from the controller lost or an aberrant sensor, the system puts itself in a safe state.
* Counterweight or return spring on the axis so that the motor does not carry the full weight of the panels.
* For the same surface, mirrors in glass or polished aluminium cost four to five times less than Fresnel lenses.
* Include in the 25-year balance the replacement of the plastic optics at mid-life, polycarbonate losing about 1% of transmission per year.
* Size the absorber to the real focal spot plus a margin: too small it misses rays, too large it loses through its surface.
* Write that electricity represents only 10 to 15% of the energy captured by a low-temperature concentrator: without an outlet for the heat, no project.
* Enclose the focus of a concentrator in an insulated metal chamber: no canvas or tarpaulin in the path of the concentrated beam.
* Count the homes served on real consumption: about 2,500 kWh of specific electricity and 1,600 kWh of hot water per year and per home.
* Measure the fouling of the optics with a soiling station: two reference cells side by side, one cleaned regularly, the other left to get dirty, and their ratio drives cleaning; a single cell confuses clouds and dust.
* A fixed tilt of 15° costs only 3.4% at the zenith (cosine of 15°): a mechanism that corrects a small angle, cams, shaft, motor, maintenance, never pays; only what gains tens of percent is motorised.
* At 2026 panel prices, a flat mirror of the same surface adds 10 to 20% to the panel's output under a clear sky but costs, installed, at least half a panel: add panels, not mirrors.
* Without sun tracking, a concentrator only reaches 1.5 to 2 (fixed CPC), 2 to 3 with seasonal adjustment: the limit is 1 over the sine of the half acceptance angle; a ball lens does not get around this limit, its focus moves and it is the receiver that has to follow.
* Store heat at 150 to 300 °C in a bed of pebbles and sand through which the oil flows (Solar One thermocline, California, 1982, 182 MWh) rather than in oil alone or in PCM capsules: the pebble stores as much per m³ and per degree for a price per kilo a hundred times lower, the oil only serves to transport.

Uncertain ideas, to be checked before using them:
* Photovoltaic panel under a sphere of water topped with a Fresnel lens: the full sphere is itself a lens, very inhomogeneous flux on the cells and two loss interfaces; unlikely to beat a bare panel of the same surface.
* Close the shutters at night to keep the water circuit hot: a marginal effect compared with the insulation of a tank, and a mechanism that moves every night wears out for nothing.
* Aluminium pins through the spheres to heat the air with the pool's water: the air under a glass dome is hotter than the water, the flow would go the other way.

------------------------------
CAR SOLARWIND, SOLARWIND BIKE, WHEEL 2.0
------------------------------
Car SolarWind (in French) | Smart Car SolarWind (in French) | SolarWind Bike (in French) | Wheel 2.0 (in French)

* Foldable photovoltaic canopy on the roof of a parked vehicle: 1.5 kWp, free charging in summer.
* Photovoltaic surface on the fixed parts of a parked cargo bike.
* Photovoltaic glazing of a vehicle: only the rear side windows and the rear window are free, the front must keep 70% transmission.
* A canopy deployed from a car roof rests on two telescopic masts on the ground so as not to twist the roof.
* Black panels over the whole bodywork heat the cabin and make the air conditioning consume what the sun produces.
* Predictive regeneration using a 3D map and GPS: lift off before the crest, maximum regeneration from the start of the descent, without any added part.
* Any mechanical part added to recover energy does less well than the traction motor used as a generator.
* Modulate the regeneration torque on a long descent to hold the speed and limit the battery's charging current.
* Generator hub open-circuit on the flat and closed downhill: the resistance almost disappears when no current flows.
* Panels folded along the frame while riding: total thickness limited to 3 or 4 cm so as not to hinder the knees.
* A double centre stand is compulsory as soon as a surface deploys on a parked bike, otherwise a gust knocks it over.
* Boost MPPT regulator between 18 to 24 V panels and a 36 V battery.
* Stator on the fixed part (fork) and magnets on the rotating part: no wire passes through a rotating part.
* Keep the original friction brakes: regeneration does not hold the vehicle at a standstill and does not work in an emergency.
* Bidirectional charger (V2H): the parked car's battery serves as home storage and backup in a power cut.
* First version with manual rather than motorised deployment: fewer failures, less weight, simpler to validate.
* Check the gross vehicle weight, the height below 1.90 m of underground car parks and roll before adding a hundred kilos to a roof.
* Rigid monocrystalline panels rather than flexible films that age quickly under UV, as soon as the surface allows.
* Say for which city a solar gain is calculated: between Lille and Nice, the same installation produces 60% more.
* Single-wheel solar trailer behind the bike rather than wings on the frame, as the Sun Trip crews already ride.
* Cost the electricity really saved by an electric bike, about 40 € a year: no charging kit pays back through the electricity it produces.
* Solid disc wheel at the rear only: at the front, crosswind exposure makes the bike dangerous outside a covered track, and the weight added to the rim is felt at each acceleration.
* For photovoltaics, only the surface projected towards the sun counts: corrugating or curving a roof increases the developed surface and the number of cells, not the energy received.

Uncertain ideas, to be checked before using them:
* Grille shutters closed when accelerating and opened when lifting off as an aerodynamic brake: active shutters exist in series production for drag, but the traction motor as a generator already recovers better, and on-board turbines have a zero or negative balance.
* Regenerative braking at the rim rather than at the hub: the same energy recovered, only the linear speed changes; the benefit is limited to fixed wiring, not a power gain.
* Air from the turbines directed into the wheel arches to cool the tyres: thermal gain not costed, added drag probably greater.

------------------------------
ELEPHANT TAP
------------------------------
Elephant tap (in French)

* Domestic filtration with activated carbon cloth and electropositive media, without pressure or electricity.
* Replace plastic bottles with a filter on the tap.
* The whole swan neck as a filter cartridge with a quick connector, changed from above without going under the sink.
* Coaxial circuit: water in the centre, radial flow through the pleated media, return at the periphery, a large surface and therefore low pressure loss.
* In a flexible filter, activated carbon cloth rather than granules: no preferential path when it bends.
* Replacement at a fixed date of twelve months whatever the remaining capacity, because of bacterial stagnation.
* Only cold water through the activated carbon: hot water releases the captured pollutants.
* Unfiltered full-flow bypass via a selector to fill buckets and pots.
* Same base, cartridge adapted to the local health risk: microfiltration on chlorinated networks, viral barrier elsewhere.
* Reusable casing with a disposable inner cartridge, or a deposit scheme to recondition the casing at the factory.

Uncertain ideas, to be checked before using them:
* Domestic filter that would lighten the load on treatment plants: a real but negligible effect, mains water is already drinkable.

------------------------------
SAFEAIR CELL (SAC)
------------------------------
SAC (in French)

* Decentralised oxygen reserve per room, at the pressure of use, without a regulator.
* Automatic purge to the outside in the event of fire when no patient is connected.
* Emergency push button on the corridor side for firefighters.
* Display of the remaining autonomy connected to the building management system.
* Check valve upstream of the reserve so that it does not empty into a leak in the general network.
* Tank suspended from the concrete slab on rails, never from the false ceiling, with an inspection hatch for the annual check.
* Reserve placed just above the wall outlet to reduce the length of hose after the valve.
* Bursting disc and dedicated vent duct to the façade, also serving as a pressure relief valve.
* Fire-resistant shell of rock wool or intumescent material around the tank to hold one to two hours of fire.
* Step-by-step validation: test bench with artificial lungs, unoccupied control room, then a volunteer care unit.

------------------------------
GOUTTIÈRE MULO (MULO GUTTER) AND WASTEWATER
------------------------------
Mulo Gutter

* Recover the heat of grey water by pipe contact before the water heater: 30 to 50% of the recoverable heat, the only idea on the page that carries weight.
* A small downpipe turbine to power a sensor or an LED, not a building.
* Keep a micro-generator on a separate circuit (stairwell lighting, small fan) rather than connecting it to the main installation: no inverter and no grid compliance.

Uncertain ideas, to be checked before using them:
* Mechanical fan driven by the gutter to dry the air: stirring rainy air does not dehumidify.

------------------------------
MULO TOWERS (VERSIONS 1 TO 7) AND MUHLEISEN TOWER
------------------------------
Mulo Tower

* Mixed village tower: silent Darrieus, miniature Thémis-type thermal collector, rain tank, UV filtration.
* Bamboo version for poor countries.
* Misting under the tower for agricultural shade and plant growth.
* Transparent UV-filtering panels above a growing area.
* Water wheel on a diversion canal with a retaining board: adaptation to variable flow.
* Triple filtration (plant tank, osmosis, UV) in the same tower.
* Starting with a small removable motor for a machine with low starting torque.
* In a lift rotor (Darrieus, H-rotor), the returning blade also produces torque; feathering it as on a drag rotor (Savonius) loses half the turn. Cyclic pitch is only worth it on drag rotors, and at small scale.
* Leading-edge tubercles help after stall and off the design point (fans, blades that often stall, vertical-axis rotors); on a pitch-regulated wind turbine blade, the benefit depends on a precise amplitude and wavelength that change with the wind, and is not demonstrated in annual energy (Georgia Tech).

------------------------------
MUHLEISEN LEAVES (ARCHIVED)
------------------------------
Muhleisen leaf (in French) | Ginkgo leaf (in French)

* Rapid feathering of a deployed surface in a storm.
* Bifacial photovoltaics set off from the façade to capture the tower's albedo.
* P-wave detection to trigger a safe shutdown before the S waves.

------------------------------
MUHLEISEN-NOLLET VORTEX AND HYBRID GRAVITATIONAL PLANT (ARCHIVED)
------------------------------
Vortex (in French) | Hybrid gravitational plant (in French) | Dual MagLev (in French) | Meca Elite (in French)

* REBCO superconducting levitation with liquid nitrogen for a storage mass: the technology, not the use.
* Eddy current braking as a passive safety without electricity.
* Sacrificial carbon-ceramic pads in case of loss of levitation.
* Sell the stored electricity at peak hours rather than as baseload.
* A 1 kg prototype for 100 € before any 200,000 € prototype.
* A risk analysis section that gives for each hazard its counter-measure: loss of vacuum, loss of superconductivity, fatigue, instability of the pool.
* Passive safety: design the machine so that it slows down and stabilises on its own in a total failure, without energy or computer.
* Pressurised maintenance airlock to intervene without breaking the vacuum or the main enclosure.
* Post-tensioned fibre-reinforced concrete for brackets working in fatigue: keep the concrete permanently in compression.
* Rectifiers distributed by section (silicon carbide diodes) to a central DC bus rather than a single converter.
* Thermal shrink-fitting of a sleeve heated then cooled to lock an inner mass without bolts.
* Electropolishing of the walls of a vacuum enclosure to limit outgassing.
* Bill of materials and manufacturing processes published with the project, item by item.
* Explicit open licence (CC BY 4.0) written in black and white on the page, with the only condition being to credit the author.
* Piezoelectric sensors for self-powering monitoring sensors, not for producing power.
* Cost the atmospheric pressure on a vacuum enclosure, 10 tonnes per square metre of wall, before drawing a vacuum building.
* Cost the superconducting tape per metre (about 100 €) before drawing rails several kilometres long.
* For an inert mass, recycled lead clad in stainless steel costs about a hundred times less than tungsten for a volume 1.7 times larger.
* Online publication destroys the novelty of a patent: choose between prior filing and an open licence, never both in the wrong order; archive each dated page to prove disclosure.
* Ferrofluid seal to pass a rotating shaft through the wall of a vacuum enclosure without air entry.
* Cast the lead into a rigid honeycomb skeleton then shrink-fit a stainless sleeve: a mass of lead alone creeps under repeated loading.
* Strain gauges welded to the reinforcement before casting to monitor the deformation of a massive part throughout its life.
* Cable jacks fixed on the structure rather than a giant crane to hoist a heavy mass sheltered from the wind.
* Transport the empty shell and cast the mass on site: an exceptional convoy rarely exceeds 100 to 120 tonnes.
* Ultrasonic scan every six months of the concrete zone most stressed by repeated load cycles.

Uncertain ideas, to be checked before using them:
* Impulse ring (rotary valve transferring water and air once per turn between fixed and rotating parts): the ring still rubs on the shaft, sealing at rest under pressure and wear are not demonstrated, and the pulsed flow causes water hammer and requires a buffer tank; the benefit compared with a conventional rotary joint remains to be proven.

------------------------------
MUHLEISEN TURBINE, HYDROGEN VERSION (ARCHIVED)
------------------------------
Muhleisen turbine

* Couple several small units to obtain a usable flow of hydrogen.
* Couple a water device with an Eliodomestico-type solar still.

------------------------------
HYDROLOOP TROMPE MUHLEISEN (MAY AND JUNE 2026, ARCHIVED)
------------------------------
Hydroloop trompe (in French) | 1 MW (in French) | 20 MW (in French)

* The hydraulic trompe as an air compressor without moving parts, to aerate the lower reservoir or power pneumatic tools, not to raise water.
* The multi-blade windmill and the hydraulic ram as ecological backup modules on a small flow.
* Positive-displacement diaphragm aerator driven by a multi-blade windmill: the only way to inject air under water in ordinary wind.
* Cost the dynamic pressure of the wind before any air device: overcoming 2 m of water would require a wind of 650 km/h.
* Count as heat revenue only what immediate neighbours really absorb; in summer, the outlet is saturated.
* Publish first the rustic version that can be built locally and keep drilling or ORC as a separate optional module.
* Opaque cover on the storage pool and no tree at the edge: neither algae nor leaves in the injectors.
* Airlift rule: the tube must be submerged over about 60% of its length.
* Drive pipe of a hydraulic ram in rigid steel, never in plastic whose elasticity absorbs the blow.
* Water-sealed siphon on the water outlet of a trompe's separator so that the compressed air stays trapped.
* Choose the turbine according to the head: Kaplan with adjustable blades for 10 to 15 m and large flow, Pelton for high heads.
* Compressed-air diaphragm pump with a mechanical bistable valve, powered by a trompe: pumping without electricity.
* Keep the demonstration that capillarity never overflows: the meniscus that makes the water rise is the one that holds it back.
* Three-valve bypass and relief valve around the heat exchanger: isolation for maintenance without cutting the circuit.
* Supply a village with a ram: continuously fill a raised tank and distribute by gravity; about 10 m of delivery head per metre of drop.
* Several diaphragm pumps phased by cams to smooth delivery instead of one large pulsed pump.
* The Archimedes screw is only suited to low heads: beyond a few metres it becomes very long and heavy.
* Choose an airlift for its reliability (no moving part in the water, tolerates sand and silt), never for its efficiency of 20 to 40%.
* The air pressure of a trompe is set by the height of the water column at the separator outlet, not by the fall velocity.
* A suction pump placed at the top never lifts water more than 7 to 8 m in practice: place the pumps at the bottom, delivering.
* An airlift has an optimal air flow: beyond it, the bubbles coalesce and the water flow drops.
* In a thermosiphon, the hot source is at the low point and the cooler at the top, otherwise circulation stops.
* Do not mount a wind turbine at the top of a solar chimney: the pressure loss of the blades kills the draught for a few watts.
* Pump diaphragm in EPDM with an internal textile weave to block permanent elongation over millions of cycles.
* Hydraulic ram bolted to a concrete block anchored in the ground: each blow transmits a recoil that a light support cannot hold.
* Precharge an anti-hammer vessel or accumulator with bottled nitrogen, at 80 to 90% of the minimum working pressure (13 to 14 bar for a 16 bar pipe), never with the air from a trompe at 1 or 2 bar.
* Cooling a water flow is costed before it is drawn: 4.2 kJ per litre and per degree, so 420 kW per degree for 100 L/s; no buried pipe or passive exchange does that, only a cooling tower or a large pool does.

Uncertain ideas, to be checked before using them:
* Hydraulic trompe on a 10 m drop giving 2 bar: the pressure depends on the depth of the separation chamber, about 1 bar gauge per 10 m.

------------------------------
ORBITS (ARCHIVED)
------------------------------
ORBITS (in French)

* Two X-mounted actuators triggered in opposition to cancel vibrations on board a satellite.
* Ceramic and ferrites to avoid eddy currents in a space magnetic actuator.
* MoS₂ or DLC dry lubrication in vacuum.
* Use the superabundant solar electricity of a station to replace propellants: the aim is right, the answer that works is the electrodynamic tether.
* Gravity-gradient stabilisation: a long vertical cable with a mass at the end maintains attitude without fuel.
* Heat in vacuum: heat pipes to a passive radiator facing deep space, no convection possible.
* EH grade NdFeB magnets and low-outgassing epoxy resin for anything that works hot and in vacuum.
* Space qualification in three tests: thermal cycling in vacuum, a shaker table with the launcher profile, fatigue over 100,000 cycles.
* Design a low-orbit satellite to fall back on its own within one or two years after any failure, without a command from the ground.
* A rotating dumbbell testing two gravities: with equal masses, both ends are at the same distance from the centre and feel the same gravity; for 1 g on one side and 0.38 g on the other, a mass 2.6 times heavier is needed on the 0.38 g side.
* A Seebeck module returns only 5 to 8% of the heat flow passing through it and is itself a thermal bridge: between a cold source that costs (cryogenics) and ambient, it costs more cold than it returns in electricity; it is only worth it on heat that is lost anyway.

Uncertain ideas, to be checked before using them:
* A bar segmented by dampers every 30 m to cut vibrations: an in-line damper under 200 kN of permanent tension remains to be designed.
* Raise water as solid ice balls rather than as a continuous column: the physics of column pressure is right, but the balloon-cable system at 50 km is unrealistic.
* Eddy current braking of a metal-cored block of ice arriving at several km/s: the energy to be dissipated would require a very long braking tunnel and enormous magnets.
* Air-breathing propulsion in very low orbit: a real concept tested by ESA, but the scoop brakes as much as it collects, a positive balance not demonstrated in flight.

------------------------------
TERRA NOVA AND SLES AQUARIUS (FICTION)
------------------------------
Terra Nova (in French) | SLES Aquarius (in French)

* 100 m radius and 3 revolutions per minute as the vestibular comfort threshold for 1 g.
* Water as shielding and as a reserve at the same time.
* Compartmentation by automatic airlocks between modules.
* Balanced dumbbell with water ballast that can be pumped from one side to the other.
* Separate the projectile capture station from the inhabited station.
* Test on rodents in a centrifuge before any human project.
* Fixed central hub to dock ships in weightlessness and point the antennas at a fixed point.
* Heavy water shielding only on the modules occupied 90% of the time, light elsewhere: a shelter rather than a fully shielded station.
* Launch the empty structure and fill the shielding with water in orbit, water making up 70% of the mass.
* Mass driver on the Moon rather than on Earth: no atmosphere, 2.4 km/s, a long rail for gentle acceleration.
* Rotation drive motor reversible as a generator: it brakes when the speed drifts and recovers the energy.
* Two air and water circuits running around the ring in opposite directions so that a punctured segment deprives no module.
* A 30-day reserve of each vital resource, sized on the real lead time of an emergency resupply.
* Capsule guided by micro-thrusters rather than a purely ballistic shot at a target moving at 7.6 km/s.
* Place any installation likely to fall back (cable, balloons) in the open sea, far from inhabited areas.
* Cost the synchronisation tolerance of a shot at an orbital target: at 7.6 km/s, a hundredth of a second shifts the target by 76 metres.
* Water delivered to orbit serves, in order, as shielding, as drink, then as propellant by electrolysis: three uses for a single launched mass.
* Rigid lattice bar rather than a cable between hub and inhabited module: fixed distance, a rail for a trolley, return to the centre in minutes.
* Interchangeable tanks brought by trolley rather than rotary joints to pass water and air between fixed and rotating parts.
* Separate the clean flow (meals, sterile equipment) from the dirty flow (waste, wastewater) in sealed containers, never in the same pipes.
* Each inhabited module keeps its own batteries, oxygen reserve and CO2 filters to hold out for several days alone.
* Build the ring in balanced stages (dumbbell, cross, closure) by rebalancing the water ballasts with each module added.

------------------------------
MUHLEISEN HYBRID SOLAR PANEL
------------------------------
Presentation | Simple (in French) | Optimised (in French) | Double (in French) | Tower (in French) | Industrial | Corridor (in French) | Floating

* Mount the solar panel on a horizontal axis: locked, it follows the sun; released by day as soon as wind earns more than the sun lost and from 3-4 m/s at night, it turns like a drag rotor and also produces wind power.
* A rotating bifacial panel presents its two faces to the sky one after the other: it keeps about two thirds of its solar output while producing from the wind.
* On a roof, compare for the same ground area, that of the platform: it is the space occupied on the ground that is scarce, not the cell area; the rotor turns above and leaves the ground free around it.
* Count the monofacial panel built into the platform under the rotor: it recovers the light that passes through.
* Hinged transparent polycarbonate flaps: open when they move with the wind, folded edgewise when they come back against the wind; small actuators (~85 €) fold them to 90° in solar mode and upwards in a storm or overheating.
* Cambered rather than flat flaps: they push better for the same weight.
* Fixed prism deflector with a rounded nose, in galvanised corrugated sheet on a frame, rear face painted white: about 150 € to mask the half of the rotor that comes back against the wind, guide the air towards the upper half of the rotor, reflect light onto the back of the panel in solar mode, and turn its back to the wind in a storm.
* Remove the tail vane: a yaw motor controlled by an electronic wind vane points the rotor into the wind and also gives 2-axis solar tracking.
* Scooter hub motors as generators, with a 1:6 toothed belt: mass-produced parts, cheap, easy to replace.
* Place motors and pulleys outside the arches, in teardrop housings with the point downwind.
* Half-shafts at both ends of the frame and crossed stainless cables at the back: no tube passes through the panel, no shadow on the cells.
* Glass-free bifacial modules (Sunman type) on the fins and edges: light, flexible, they follow the curve of the arches.
* Keep as an option a glass-free central panel: lighter, no risk of breakage in rotation, the fallback if the glass fatigues.
* Rubber mountings, damped stops, electronics kept dry and supercapacitors instead of a battery: parts that last lower the kWh.
* On a roof, stack two modules on the same platform: the second level gets stronger wind and shares the platform, orientation and controller, the kWh falls by 8 to 16%.
* On the ground, stack three modules over 10 m: 9.3 times the output of a conventional panel on the same footprint.
* For a drag rotor with solid plates, the optimum is a medium size (5 to 8 m in diameter): beyond that, material grows faster than surface.
* Raise the large rotor by about 5 m: higher up, the extra wind barely pays for the mast (at +10 m, the kWh only falls by about 2% more).
* Measure the wind for a year at axis height before placing a module on a roof.
* Prism deflector with a rounded nose rather than a curved plate: its "/" front face stops the wind in front of the blade coming back against the wind and guides it towards the upper half of the rotor instead of sending it back towards the roof; its rounded nose and its underside rising towards the front receive the air climbing up a façade; its white rear face reflects light; a 2D simulation shows a flow three to four times more regular behind it.
* In solar mode, fold the transparent flaps to 90° behind the panel: with 2-axis tracking, they are parallel to the rays and no longer cast shade, the ground panel receives ~2.8 times more light than with flat white flaps; the actuators are needed anyway for storms and overheating.
* Give the ground panel the whole usable surface of the platform, but do not widen the platform on a roof: the area taken grows faster than the output.
* Under a large orientable rotor, lay a fixed ground field over the whole circle swept by the machine: at 9 m high, the rotor only takes 7% of its light, and the field produces more than the rotor itself on the same land and the same connection.
* Transparent rather than white polycarbonate flaps: folded to 90° in solar mode, they let diffuse light through to the ground panel and hide only 7% of the light on the rear face, against 27% for folded white flaps; in rotation, they also let light through to the ground.
* The flap actuators are needed anyway for storms and overheating: folding in solar mode costs nothing more. Folding to 120° gains nothing over 90°: the ground panel gains what the rear face loses.
* On a double or a tower, the levels track the sun together and, with folded flaps, only shade each other above about 55° of sun elevation (from 20° with flat flaps): transparent flaps folded at each level give the level below 91% of the light of a single module, against 83% with flat white flaps.
* Cyclone protection option: fold the installation and lay it on the ground, strapped to sealed anchors, like the tilt-down mast wind turbines of the islands; a 250 km/h wind presses 2.8 times harder than a 150 km/h storm; lying down, it still tends to lift it, so the anchors are sized for pull-out.
* A tilting mast or tower serves twice: against cyclones and for maintenance on the ground, without an aerial platform.
* For a large horizontal rotor too heavy to tilt, lower the cradle vertically on a telescopic mast with jacks, or do not raise it at all in a cyclone zone.
* Target islands for commercial deployment: sun, regular trade winds and electricity often produced with diesel, the market where a foldable hybrid panel is worth the most.
* A vibration sensor costing a few euros on each module: remote monitoring spots an imbalance, a worn belt or a cracked panel, and allows a maintenance visit every two years instead of every year.
* On a small wind turbine mast, guy wires rather than a large concrete block: a small footing and a few anchors are enough, and the mast remains tiltable for maintenance and cyclones.
* When a machine and a ground field together exceed 36 kVA, two connection points below 36 kVA cost less than one connection above 36 kVA, for about 2% of energy curtailed.
* Show the breakdown of the series price item by item, installation included: you immediately see what weighs and where to look for savings.
* For a deflector exposed to the wind for 25 years, galvanised corrugated sheet rather than a bitumen sheet: same price, it does not tear at the fixings and does not age in the sun.
* A second level gains above all where the first is low: +19% wind power on an urban roof, +37% on a carport, but barely +3% on a 35 m coastal building, where the wind hardly strengthens over 3 m.
* Choose solar or wind mode according to the measured power rather than a fixed wind threshold: turning as soon as wind power exceeds about 40% of the tracking solar power gives 1 to 2% more for an anemometer and some software.
* A fail-safe overspeed brake (short-circuiting the motors and a brake that clamps without power): for ~50 €, the rotor cannot run away towards 180 rpm if the lock or the electronics fail in a storm.
* Test fatigue in rotation on an accelerated bench before series production: a module turns hundreds of millions of revolutions in 25 years, a thousand times more than the usual load tests of panels.

Uncertain ideas, to be checked before using them:
* Useful wind on urban roofs: the Warwick trials showed outputs well below forecasts, figures to be confirmed by prototype.
* The fatigue resistance of a glass-glass panel turning thousands of hours a year is not demonstrated.
* A UV protection spray for polycarbonate (like for car headlights), reapplied every year at the maintenance visit, to delay yellowing and embrittlement of the transparent flaps: protection of about one year announced by the manufacturers, real gain in lifetime to be measured on the prototype.
* Count the replacement of the polycarbonate flaps around year 15 (~170 € per module): sun, salt and hundreds of millions of impacts on the stops; an ETFE film would last 25 years but comes to the same price over the lifetime.

------------------------------
DEPLOYMENT STRATEGIES
------------------------------
World plan 10,000 billion objective (in French) | 5-in-1 world plan (in French) | 4-in-1 world plan (in French) | 3-in-1 world plan (in French) | Hydroloop world plan (in French) | World plan for the hybrid solar panel (in French) | 9-year strategy (archived) (in French)

* Cost a deployment in number of units per year and per company.
* Count avoided emissions per GW of coal replaced (about 4 Mt of CO₂ per year and per GW).
* Put the simulation code online so that it can be checked.
* Measure a plan on the fossil electricity to be replaced (18,240 TWh) and not on total electricity: hydro, nuclear and renewables already installed have nothing to be replaced.
* For a decentralised deployment, count land already occupied, cleared and connected (farms, pylons, wasteland, embankments, wind farms) rather than buildings: the largest resources are not roofs.
* Place the industrial version on a 20 m free-standing mast next to the building rather than on the roof: no structural study, 9 m above obstacles, 12 to 13% more output for a 7,300 € mast; four masts around a large surface, ground field as a car park canopy.
* Between the large wind turbines of the 87,000 Hydroloop plants, once built, the land is windy, connected and maintained: room for 10 to 20 industrial modules per machine, 25 to 50 million more modules that the hybrid panel plan does not yet count.
* Assign each solution to the site where it is cheapest rather than pushing a single solution onto mediocre sites: the Hydroloop stops at the 87,000 good reliefs, the second half comes from panels on flat land already occupied.
* The reservoirs of the Hydroloop plants also pump the surplus of decentralised panels at low-price hours: cycled every day, 5.4 TWh of storage smooth up to 1,600 TWh a year that do not come from them.
* Three decision-makers instead of one: the State for the plants, the owner for the panels, the municipality for the towers; a plan that depends only on States waits for States.
* A panel never leaves the sun for the wind: any manoeuvre of panels in the service of the rotor is done at night and under overcast skies, where it costs no solar kWh.
* Terracing a dense field in height, each row one metre higher than the one in front of it on the sun side, removes the shade between rows (14.8% to 3.4%); it only pays if the slope of the land gives it for free.
* The free corridor is the site: the machine at the top of a slope facing the prevailing wind receives 10 to 30% more wind over the whole height of the rotor, where a 5 m ramp of panels only gave it over its first metre.
* Have the access track run around the field, in white gravel, and line it with a crown of bifacial panels at 30°, rear face over the gravel: northern arc facing south (+33% per m²), eastern and western arcs facing east and west (+18%, morning and evening); the cheapest kWh of the installation, on the same inverter, with no vegetation to cast shade.
* Bifacial only makes sense with the rear face clear (edge row, light ground behind, raised tables): tightly packed and flat, it brings nothing, and the crown is bifacial or nothing (facing east, monofacial loses 11%).
* Close the ends of the rotor with end discs (fixed end discs, transparent on small modules, sheet metal on the industrial one, a disc at each intermediate arm): air no longer escapes through the ends when the flap pushes, +12% wind power for a few hundred euros, kWh unchanged, more output on the same footprint.
* A drag rotor has its maximum torque at standstill and starts on its own; start-up assistance by the generator as a motor, which Darrieus rotors require, does not lower the production wind (3 to 2.5 m/s is worth 0.2 to 1%, and wind between 3 and 4 m/s carries 1 to 4% of the energy, 0.6 to 0.8% for a large wind turbine); it only helps with short gusts, the dead point and freeing a stuck rotor, for free since hub motors are motors.
* Rank all the solutions of a plan by cost per annual GWh, on the same pricing rule, and give each TWh to the cheapest: the world plan keeps its 17,360 TWh and goes from 11,230 to less than 10,000 billion.
* A large Hydroloop V14 plant remains cheaper than a hybrid panel even on a ridge at 6 m/s with 20 M€ of extra line (0.49 M€ per annual GWh against 0.60 to 0.81): enlarge the big plant on less good sites before adding panels.
* On water, roughness replaces the mast: 3.5 m above a body of water, a rotor receives 90% of the wind at 10 m, against 72% at 4 m above a meadow; the hybrid rotor placed on floats loses 4% of wind and saves the mast, the base and the yaw ring, 4.3 c€/kWh instead of 7.3.
* An island of rotors held by its centre turns across the wind on its own, like a boat at anchor, provided the pile is a little ahead of the centre of drag; the winch only serves to turn it towards the sun when the wind is lacking.
* On floats, one rotor per rigid float and articulated flat iron X braces between floats, never a common shaft: the floats each move in their own way and synchronisation is done by the inverter.
* On a counted reservoir (the 16 ha of a Hydroloop), the hybrid island is the only way to draw more energy from the same surface: 24 to 33% more than the floating cover, a quarter of which is sold at night and in winter.
* The small hybrid rotor on a farm pond is not worth it: 1.5 m above the water the wind is worth nothing, 10.6 c€/kWh, conventional floating PV wins.

------------------------------
THE SITE'S METHOD
------------------------------

* Everything royalty-free, open source plans.
* Date each page and each correction.
* Explicitly ask specialists to make corrections.
* Publish the reasoning with the AI, keeping only the correct conclusion.

------------------------------
IN SUMMARY
------------------------------

656 ideas, gathered by reading each page in full, including the long conversations published with the AI. Many are design details (safety, materials, procedures, calculation method) that are valid for any project. The archived pages contribute a large share, and that is why they remain online with their banner. The plans are royalty-free.

Olivier Muhleisen in collaboration with Claude (Anthropic), October 2026. Royalty-free plans, open source.



© 2009-2026 Onmyweb Production - TOS - Cookies information - Contact us - Free Copyright Open Source -