THE PRINCIPLE: RAIN FIRST, PUMPS SECOND
------------------------------
The name comes from Pachamama, the Mother Earth of the Andes, who gives water and takes it: the V16 is the Hydroloop that gives back water as much as energy. Its principle fits in one sentence: rain first, pumps second. A third basin, a rain lake five to fifteen times larger than the upper basin, set higher than it, receives the water of a whole mountain through the Pacha catchment: a belt canal of 20 to 45 km that follows the contour line and captures every ravine. The lake fills the upper basin by gravity, first; the pumps only lift what is missing for the peak, with the plant's wind and sun; all the rest of the production is sold directly. Rain water goes through the Pelton turbines, at peak first, because that is where it is worth the most, and the excess beyond the peak runs a rain Pelton day and night, small, sized to this flow. Everything comes out at the bottom into a regulated stream that flows all year round for the valley. The closed loop of the previous versions becomes a loop open at the top: it takes nothing, it receives.
What the model learned, part by part, by giving each a price and judging on the kWh of the whole plant (study of 17/10/26, table in section 2):
* The canal is the lever. It costs 0.5 M€ per kilometre and each kilometre reaches 7 km² of slopes, 5 million m³ a year under 1,500 mm: it pays back in one to two years and lasts a century. It, and it alone, lowers the kWh: 35 €/MWh for a V11, 32 with 4 km of canal, 29.7 with 10, 29.4 with 20; 28 €/MWh for a V14, 26.1 with 10 km, 24 with 30, 23.6 with 45.
* The lake is worth ten times the upper basin in a temperate climate, fifteen in monsoon, only five behind a V15 whose large Pelton does the work. Beyond that, it is the dam that grows, not the gain.
* The rain Pelton is sized on the excess water beyond what the peak consumes, not on the whole inflow: the peak is served first because its kWh is worth more. Once the excess in a temperate climate, one and a half to two times in monsoon. Two units when it exceeds 5 MW, a single one below, with the large Pelton as backup.
* Developing the slopes so that they run off more (stone-lined thalwegs, intakes at every ravine) never pays: ten points of runoff cost more than the kWh gained. The mountain is captured as it is.
* The built clay and gravel catchment never pays through the kWh: 12 €/m², and 1 km² gives only 1.3 million m³ a year. It remains, at 0.2 km², as a guarantee for dry years where the valley wants a water reserve, and that is the only reason to build it. It is almost eternal, which is its quality.
* The lake also collects the rain that falls on it and evaporates part of it: two percent of the inflow. Settling, on the other hand, is a real service: the Pelton turbines receive clear water.
* The lower basin does not grow: it empties and fills every day, and the reserve is more useful at the top, where it is already energy.
| Item | V14 | V16 Pacha 2 |
| Role | produce and smooth its own production | the same, plus the water of the mountain |
| Head | 300 m | 300 m |
| Basins | 2 × 800,000 m³, rain reservoir of 500,000 m³ | 2 × 800,000 m³, plus the 8 million m³ rain lake (10 times the upper basin, 80 ha; 12 million in monsoon) |
| Catchment | rain on the reservoir | 30 km belt canal capturing 210 km²: 212 million m³ a year under 2,000 mm; 45 km and 315 km² in the full version |
| Pelton / pumps | 8 × 6 MW / 64 MW variable speed | the same; beyond 220 km², a 2 × 4.5 MW rain Pelton running day and night (7 MW in monsoon) |
| Wind and solar | 240 MW, 150 m towers, 16 MWp | the same |
| Electricity sold | 885 GWh | 1,125 GWh (30 km), 1,180 GWh (45 km), 1,081 in monsoon |
| Investment in series | 364 M€ | 404 M€ (lake 25, canal 15); 421 M€ in the full version (canal 22.5, rain Pelton 9.6) |
| Private LCOE | 28 €/MWh | 24 €/MWh (30 km), 23.6 €/MWh (45 km), 26 in monsoon |
| Water returned to the valley | nothing | 196 to 270 million m³ a year, regulated, floods clipped |
------------------------------
1. THE RAIN LAKE, THE BELT CANAL AND THE CATCHMENT: WHAT LASTS
------------------------------
The Pacha catchment is the mountain linked to the lake. A clay belt canal of 20 to 45 km follows the contour line above the lake and cuts every thalweg with an intake and a sand trap; each kilometre reaches 7 km² of slopes. The lake is a natural depression or a small valley closed by an earth-fill dam with a compacted clay core, set 50 to 300 m above the upper basin so that the water flows down on its own. It receives the water of the canal, the water that falls on its hectares, and, as an option, that of a small built catchment of clay under light gravel, as in the V12, which guarantees a minimum in dry years. It settles, and it fills the upper basin by gravity as soon as there is room, keeping a bottom of 10% for weeks without rain. When the upper basin is full, the excess runs the rain Pelton, day and night, as long as the lake is above 30%; at half power between 10 and 30%; it stops below that so that the peak keeps its water.
The lifetime of the lake and the catchment is the argument that other forms of storage do not have. A plastic liner lasts 30 to 50 years and gets replaced; compacted clay under gravel lasts as long as it does not dry out and crack, and the gravel is there precisely for that: it keeps it moist and protects it from sun, frost and roots. The Nabataean cisterns and catchments of the Negev and the tanks of southern India are two thousand years old; the clay embankments of European canals are two centuries old. Maintenance comes down to removing sediment and vegetation every few years and topping up the gravel where it goes. Over the 60 years of depreciation of the civil works, the lake is the element of the plant that costs the least after its construction, and it will still be there when the wind turbines have been replaced three times. One single condition, which is already the site exclusion rule: ground that holds, no karst, no gypsum, no fault under the dam.
------------------------------
2. THE HOURLY MODEL: WHAT THE RAIN CHANGES
------------------------------
The V14 model is taken up hour by hour over 8,760 hours, with rain added: three regimes (temperate, monsoon, winter), rain spread over a third of the days of each month in storms of random size, 50% runoff on the slopes, lake evaporation of 4 mm a day in summer. The operating rule is that of the page: the lake fills the upper basin first, the pumps make up the rest with own production, the rain Pelton runs on the excess. Each part has its price (canal 0.5 M€ per km, lake 3 €/m³ plus 1 M€, rain Pelton 900 to 1,200 €/kW, 20% more for two units), depreciated over 60 years for the civil works and 30 for the machines, at 4%, plus 1% maintenance. Each row compares the plant with and without its lake.
| Configuration | Inflow (million m³) | Spilled (without lake) | Pumped (without lake), GWh | Large Pelton at peak, GWh | Rain Pelton, GWh | Sold directly (without lake), GWh | Total sold, GWh | Added cost, M€; kWh of the plant |
| 10 km of canal, 70 km², 2,000 mm, temperate | 71 | 0 (30) | 128 (157) | 155 | none | 857 (828) | 1,012 | 30; 26.1 €/MWh |
| 30 km of canal, 210 km², 2,000 mm, temperate (reference) | 212 | 15 (142) | 18 (132) | 157 | none (excess of 2 million m³) | 968 (853) | 1,125 | 40; 24.0 €/MWh |
| 45 km of canal, 315 km², 2,000 mm, temperate (full) | 317 | 46 (239) | 18 (125) | 157 | 56 (2 × 4.5 MW) | 967 (860) | 1,180 | 57; 23.6 €/MWh |
| 30 km of canal, 210 km², 2,000 mm, monsoon, lake 15 times | 212 | 84 (158) | 82 (146) | 156 | 22 (7 MW) | 903 (839) | 1,081 | 59; 26.0 €/MWh |
------------------------------
3. THE FIGURES IN SERIES
------------------------------
| Item added to the V14 (364 M€) | Reference, 30 km (M€) | Full, 45 km (M€) | Remark |
| Belt canal, intakes on the thalwegs, sand traps | 15 | 22.5 | 0.5 M€ per km, 7 km² captured per km |
| 8 million m³ rain lake, compacted clay core dam, settling tank, outlet, flood spillway | 25 | 25 | class A or B depending on what lies below |
| Rain Pelton, 2 × 4.5 MW | 0 | 9.6 | 900 €/kW, two units |
| Option: built catchment of 0.2 km² | 2.4 | 2.4 | water guarantee, no kWh: excluded from the total |
| Total added | 40 | 57 | 404 and 421 M€ |
| Annuity and maintenance per year | 2.2 | 3.2 | |
| Result | 30 km, 210 km² (reference) | 45 km, 315 km² (full) | 30 km, monsoon |
| Electricity sold | 1,125 GWh (+240) | 1,180 GWh (+295) | 1,081 GWh (+196) |
| Extra revenue (90 €/MWh direct, 115 at peak) | 10.8 M€ a year | 15.6 M€ a year | 8.3 M€ a year |
| Net after annuity and maintenance | 8.6 M€ | 12.3 M€ | 5 M€ |
| Private LCOE of the whole plant | 24 €/MWh (28 for the V14) | 23.6 €/MWh | 26 €/MWh |
| Pumps | 18 GWh instead of 132 | 18 instead of 125 | 82 instead of 146 |
| Regulated water returned to the valley, flood spill | 196 million m³, 15 instead of 142 | 270 million, 46 instead of 239 | 128 million, 84 instead of 158 |
| Option: a third of this water sold in the dry season at 0.15 €/m³ | +10 M€ a year | +13.5 M€ a year | +6 M€ a year |
Reading: the Pacha 2 is the cheapest plant on the site from 20 km of canal, and each kilometre up to 45 lowers the kWh further. In the reference, the rain Pelton does not exist: 210 km² give just the water that the peak consumes, and the peak is served first; it appears at 45 km, when the excess reaches 107 million m³. In monsoon, the lake goes to 15 times and the rain Pelton to 7 MW, and it still spills 84 million m³: the water arrives in four months, and a larger lake would cost more than it would return.
------------------------------
4. WHERE IT GOES
------------------------------
* The V14 ridges that have a whole mountain behind them and a contour line for the canal: the Scottish Highlands and the fjords of Norway (Coire Glas, Sima), the Western Ghats above the Konkan (Koyna), the Central Range of Taiwan, the Southern Alps of New Zealand, the Serra do Mar, the Andes of Colombia and Ecuador, the Drakensberg, the Ethiopian Highlands, Honshu and Kyushu, Yunnan, Sumatra and Java, southern Chile, the Cantabrian Mountains, the Atlantic Pyrenees, the Tatras and the Carpathians. Many are already on the
best locations page (in French), and the
Pacha locations page (in French) names 114 of them, with their rain and their priority.
* What it needs more than a V14: a small valley that can be closed, of 8 million m³, 50 to 300 m above the upper basin, 1,500 to 2,500 mm of rain, 30 km of contour line for the canal, with no village below the lake that is not protected by the relief.
* What it leaves alone: dry plateaus and ridges without a mountain behind, which remain V14; catchments that already supply a city without a reserve; small valleys whose dam would flood a village or a protected site.
------------------------------
5. SAFETY: ONE HAZARD, ONE BARRIER
------------------------------
* The 8 million m³ lake is a class A dam as soon as there is a village downstream: hazard study, warning plan, and the V15 rule applies, relief or a buffer basin between the lake and the dwellings.
* The lake dam: class B or A depending on the volume and what lies below, compacted clay core and drains, piezometers, bottom outlet, spillway sized for the hundred-year flood of the captured slope and not for the rain on the lake alone, hazard study.
* The flood: a 300 km² slope under a 100 mm storm in one day sends 15 million m³; the lake absorbs part of it, the spillway returns the rest to the stream through a masonry channel, never through the penstock or the upper basin. The Pacha clips the floods of its valley, it does not create them.
* The ration valve: it closes in case of fault and on the P waves of the seismometer, like the head valve; the upper basin never receives more than its free space.
* The sand trap and the settling tank at the lake entrance: emptied by a pneumatic diaphragm pump, without electricity, as on the basins; the sediment goes onto the slopes, not into the penstock.
* The regulated stream: reserved flow guaranteed all year round, a fish ladder if the old watercourse had one, and the peak flow of the Pelton turbines smoothed by the lower basin before being returned.
------------------------------
6. POINTS TO WATCH
------------------------------
* A canal of 30 to 45 km crosses gorges and properties: siphons, aqueducts, easements; it is the item whose price can double, and the one that takes the most time.
* The kWh of 23.6 to 24 €/MWh assumes the sale prices of the V14 (90 €/MWh direct, 115 at peak); at 70 €/MWh, the Pacha 2 stays below the V14 but the canal pays back in three years instead of two.
* Pelton or Francis: the base V14 switches in series to variable-speed reversible Francis units on clean water (28 → 27.6 €/MWh, a draw); on a Pacha 2, the mountain water brings sediment despite the settling tank, and the Pelton remains recommended for the eight peak machines as for the two rain Pelton turbines.
* Runoff is taken at 50% on natural slopes and 85% on the built catchment; dense forest gives 30%, bare rock 80%. The lidar measures the wind; it is a hydrometric station on the torrent that measures the water, and it costs 50,000 €.
* The model spreads rain over a third of the days of each month, in storms of random size, with three regimes (temperate, monsoon, winter); a real thirty-year rain series will do better, and the first Pacha will publish it.
* A lake above a plant is a hydraulic structure in its own right: permit, hazard study, dam class. The Pacha must never be presented as "a Hydroloop with one more basin".
* The belt canal crosses land that does not belong to the plant: easements, paths, owners. It is the longest part of the procedure, not the most expensive.
* The water returned to the valley has a value, but only if someone buys it: the page counts it as an option, never in the price of the kWh.
------------------------------
7. THE GOOD IDEAS OF THE PACHA 2: INHERITED AND NEW
------------------------------
| Idea | Where it comes from | What it does in the Pacha 2 |
| Third basin: the rain lake | Idea of Olivier Muhleisen, 17/10/26 | Ten times the upper basin, set higher than it, fed by the slopes; as long as it has water, the pumps sleep |
| The Pacha catchment: the belt canal | V15, snow as catchment, and Olivier Muhleisen's idea of linking the mountain to the lake | Captures 7 km² per kilometre, 0.5 M€ per kilometre, paid back in one to two years: the only lever that lowers the kWh |
| Built clay and gravel catchment | V12, catchment upstream of the upper basin | Guarantee for dry years, almost eternal; 0.2 km² as an option and no more, because the canal makes the volume |
| Rain Pelton sized on the excess | Olivier Muhleisen's vision: a Pelton that runs almost all the time | The peak is served first with the lake's water; the excess runs a small Pelton day and night, two units above 5 MW |
| Do not develop the slopes | Optimisation study of 17/10/26 | Ten points of runoff cost more than the kWh gained: the mountain is captured as it is |
| Rain first, pumps second | Olivier Muhleisen's principle: there are no more small savings | Each cubic metre that falls upstream of the upper basin is a cubic metre that is not pumped up: 22% of loop losses avoided |
| Lake bottom reserved for the peak | Operation of storage dams | The last 10% of the lake only go to the upper basin: the peak keeps its water even in the dry season |
| The monsoon is turbined, not stored | V5 and V6 revised on torrents | In monsoon, the rain Pelton goes to one and a half or two times the excess and the lake to fifteen times the upper basin; a larger lake costs more than it returns |
| Regulated stream to the valley | Pachamama | The turbined rain water comes out at the bottom all year round: villages, fields, and a guaranteed reserved flow |
| Settling in the lake | Classic reservoirs | Clear water for the Pelton turbines, buckets that last, sand trap at the entrance |
| Floods clipped | Flood-control dams | A captured slope is a regulated slope: the Pacha protects its valley from storms |
| Lower basin unchanged | Hourly model | The drought reserve is at the top, where it is already energy; at the bottom, the flood is a matter of spillway |
| Lake in clay and gravel rather than a liner | Nabataean Negev, tanks of southern India, European canals | Two thousand years of precedents; almost nothing to pay after construction |
| What the built plants teach | Pinnapuram, Siah Bisheh, Bieudron, Sima | Bieudron and Sima are already high heads with a natural catchment and pumping; Pinnapuram sells guaranteed power: the Pacha only combines what exists |
| Two rain Pelton units | Availability of the plants | 2 × 4.5 MW instead of one of 9: one runs while the other is serviced, for 20% more on 8 M€ |
------------------------------
CONCLUSION
------------------------------
The Pacha 2 is the V14 with a whole mountain added: a belt canal of 30 to 45 km, an 8 million m³ rain lake, the upper basin filled by rain all year round, the pumps almost stopped, and beyond 220 km² a two-unit rain Pelton running day and night. 1,125 GWh at 24 €/MWh, 1,180 at 23.6 instead of 885 at 28, 40 to 57 M€ more paid back in four years, 196 to 270 million m³ of regulated water returned to the valley and its floods clipped. The optimisation study says where the money goes: into the canal, the lake at ten times, two small Pelton turbines; not into the slopes, not into the built catchment. It needs a large slope and a contour line, and that is what reserves it for a few hundred sites: the rainiest of the 5,000 best ridges in the world. Plans, diagrams, texts and code under the CC BY 4.0 licence.
------------------------------
SOURCES
------------------------------
The hourly model of the three Pacha (Python, no library)
The best locations in the world for large Hydroloops (in French)
The best locations in the world for Hydroloop V16 Pacha, 114 named sites (in French)
5-in-1 world plan: 2,550 Pacha in the plan, 92% of fossil fuels (in French)
4-in-1 world plan (in French)
Power Technology: Pinnapuram, pumped storage, solar and wind on one site, guaranteed power sold to a steelmaker
Wikipedia: Nabataean agriculture in the Negev, two-thousand-year-old catchments and cisterns (in French)
Wikipedia: embankment dams with a clay core
Wikipedia: Pachamama
Hydroloop Muhleisen 2026 V14, the base
V12, the clay catchment upstream of the upper basin (in French)
Wikipedia: Koyna, 1,960 MW on the monsoon of the Ghats
The site's good ideas (in French)
Olivier Muhleisen in collaboration with Claude (Anthropic), October 2026. Plans, diagrams, texts and code under the CC BY 4.0 licence: free to use, copy and modify, provided the author is credited.