The
Artesia 5 plan, version 2, human development replaces 95% of each country's fossil electricity and places its plants first in poor countries. But it only replaces what exists: a country that burns almost nothing receives almost nothing. In Chad, Somalia or Burundi, a person consumes less than 50 kWh a year, more than three hundred times less than an American (13,000 kWh), and in Chad or Burundi, nearly nine people in ten do not have electricity at home. Artesia 6 keeps the whole Artesia 5 human development plan and adds a floor: at least 500 kWh per person per year in every country, and a connection for every person who does not have electricity.
The first aim of the plan remains the climate. These countries will equip themselves anyway; if they do it with diesel generators and coal, as others did before them, their new emissions will add to those the plan erases. Artesia 6 makes sure that their electricity is clean from the first kWh.
This plan has a sequel: the
Artesia 7 world plan takes up Artesia 6 without any plant in a protected area, with winter, a cap on dependence between countries, a guarantee for fragile countries and the population of 2038, for 10,969 billion euros.
------------------------------
TO UNDERSTAND THIS PLAN, WITHOUT KNOWING ANYTHING ABOUT THE SITE
------------------------------
The problem. Nearly six kWh in ten of the world's electricity still come from coal, gas and oil. Producing it emits about 13 to 14 billion tonnes of CO2 a year, about a third of energy-related emissions. Sun and wind now cost less than these fuels, but they do not produce when needed: the sun gives at noon, whereas consumption is highest in the evening. Replacing fossil electricity therefore means producing enough, and above all storing daytime electricity to return it in the evening.
The idea. The site mulo.world proposes plants that do both at once: produce with sun and wind, and store with water. The principle is that of pumped storage plants, which have existed for a century: two reservoirs at different heights, pumps that raise the water when electricity is plentiful, turbines that let it down again when it is needed. These plants are called Hydroloop. This plan, Artesia 6, calculates how many are needed, where to put them and how much they cost, country by country, to replace 95% of the world's fossil electricity in 25 years, evenings included, and to give a minimum of electricity to the countries that lack it.
The plants of the plan, in a few words (each name links to its page):
*
Hydroloop V14: the basic large plant. Two reservoirs about 300 m apart in height, wind turbines that pump the water up, a Pelton turbine that lets it down in the evening. It is placed on a windy ridge.
*
V14 Soleil: the same plant, but with solar panels on trackers instead of wind turbines, on a sunny plateau overlooking a valley. The mixed V14 Soleil also keeps a few wind turbines. It is the most numerous plant of the plan.
* V14 near substations: V14 placed on the relief around the substations of coal, gas or oil plants that are going to close, to reuse their lines (
reusable substations).
* The MAX versions: when a site can carry two, four or six V14, they share a single slope, a single powerhouse and a single substation, and cost up to 10% less (
V14 Soleil MAX,
V14 MAX).
*
V15 Canyon: a very high head storage plant, 1,000 to 1,500 m, on the mountain ramparts that overlook large cities; it stores a lot in little space.
*
V16 Pacha,
V17 Gold and
V18 Sky: V14 improved where the site allows. The Pacha adds a rain lake above the upper reservoir, whose water is turbined without being pumped; the Gold adds a stream or a spring; the Sky adds a lake at the bottom to raise the surplus of the other plants and keep it for days without wind.
*
V21 Barrage: a Hydroloop placed on an existing dam, with panels or wind turbines; the dam's lake serves as a reservoir.
*
Muhleisen hybrid solar panel: a solar panel that itself serves as a blade and turns in the wind; it produces by day with the sun and also when there is wind. The plan puts it where it costs less than a plant, and on lakes as
floating hybrid islands.
*
Titan Claudia towers: city and coastal towers that carry wind turbines and panels, already counted in the plan.
The Artesia plans. The site has published a series of world plans, each more precise than the last. The plant sites were first looked for one by one on maps of relief, sun and wind; then the transport of electricity between countries was counted (
Artesia 5, first version); then each plant and each line was paid at the price of its country, and the evening was guaranteed in every country (
Artesia 5, version 1 recalculated); then, at almost equal cost, the plants were placed first in poor countries (
Artesia 5, version 2, human development). Artesia 6 takes up this last plan as it is and adds the electricity that the poorest countries lack. It can be read on its own: everything you need to know is on this page.
The words of the plan.
*
TWh (terawatt-hour): one billion kWh. France consumes about 450 TWh a year, the world about 30,000.
GWh: one million kWh.
GW: a power of one million kW, that of a large nuclear reactor.
*
The evening: from 5 pm to 5 am. It is the time when the sun no longer produces; the plan must return more than half of consumption then.
*
HDI: the United Nations human development index, which combines life expectancy, schooling and income. Low below 0.55, medium up to 0.70, high up to 0.80, very high beyond.
*
Flexible demand: part of consumption shifted from the evening to noon, when solar electricity is plentiful (section 4).
*
€bn: billion euros. All costs are investments over 25 years, at 2026 prices.
------------------------------
IN SHORT
------------------------------
| Artesia 6 | Current demand | Flexible demand |
| Cost over 25 years | 10,505 billion euros | 9,966 billion euros |
| Comparison with the world military budget | 16% over 25 years | 15% over 25 years |
| Comparison with the fossil fuel burned today for electricity (€917bn a year at world prices) | 11.5 years of fuel | 10.9 years of fuel |
| Comparison with world investment in clean energy (about €1,980bn a year) | 21% for 25 years | 20% for 25 years |
| Per person on the planet | 51 euros per year | 49 euros per year |
| Fossil electricity replaced | 95% in every country, 17,360 TWh per year |
| Electricity added for the countries that lack it | 464 TWh per year in 86 countries |
| People connected | 696 million |
| Returned every evening, from 5 pm to 5 am | 18.4 TWh |
| CO2 avoided | 13.7 billion tonnes per year, plus about 350 million that the added electricity would have emitted with diesel and coal |
The comparisons: world military budget of 2,887 billion dollars in 2025 according to SIPRI, that is about 2,600 billion euros a year and 64,960 billion over 25 years; fossil fuel burned for electricity calculated on the page
electricity country by country; investment in clean energy and grids of 2,200 billion dollars in 2025 according to the International Energy Agency; 8.2 billion inhabitants. Exchange rate: 0.9 euro per dollar.
Code (Python, free):
calcul_plan_mondial_artesia_6.py (run without arguments for Artesia 6, with a number for another minimum in kWh, with "souple" for flexible demand, with "balayage" for several minimums); the diagram:
schema_plan_mondial_artesia_6.py; the results:
the sites,
the V15,
the countries,
the lines,
the totals,
those of flexible demand and
the sweep; access to electricity:
acces_electricite_banque_mondiale_2023.csv
The previous plans:
Artesia 5, version 2, human development |
Artesia 5, version 1 recalculated |
Artesia 5, first version |
Artesia 4 |
Artesia 3
------------------------------
1. THE RULE: A FLOOR FOR EVERY COUNTRY
------------------------------
*
The minimum: each country receives at least 500 kWh per person per year, on average over its population, all consumption included: homes, schools, clinics, workshops, pumps, small industries. A country that consumes 165 kWh per person, like Nigeria, receives the 335 that are missing for each of its 238 million inhabitants: 80 TWh a year.
*
The connection: every person without electricity is connected, even in a country that already exceeds 500 kWh on average, and receives 500 kWh a year. The access rates are those of the World Bank for 2023; applied to the populations of 2024 and 2025, they give 696 million people. The United Nations counts 666 million in 2023 and 655 million in 2024: the gap comes from more recent populations.
*
What 500 kWh represents: half of the "modern energy minimum" of 1,000 kWh per person per year proposed in 2021 by the Energy for Growth Hub (300 kWh at home and 700 in the economy). It is enough to light, refrigerate, pump water, recharge, ventilate, run a school, a clinic and a workshop; it is not yet the life of a rich country.
*
The evening: the added electricity serves the evening more than the electricity it replaces elsewhere, because it first lights homes. The calculation puts 60% of it between 5 pm and 5 am, instead of 52%, and guarantees it like the rest, country by country.
*
Everything else is that of Artesia 5, version 2: the same sites, the same prices by country, the same discount to choose the plants of poor countries (25% for a low human development index, 19% for a medium one, 12.5% for a high one), and still 95% of fossil electricity replaced in every country.
------------------------------
2. THE METHOD, STEP BY STEP
------------------------------
*
What must be replaced: the fossil electricity of each country and its price, on the page
electricity country by country (
CSV).
*
What must be added: the consumption and population of each country (Our World in Data,
CSV) and the World Bank rate of access to electricity (
CSV).
*
The possible sites, all measured: the
plateaus of the sun belt (
CSV, and their wind:
CSV), the
windy ridges (
CSV), the relief around the
substations of fossil plants (
CSV), the
existing dams in the sun (
CSV) and
in the wind (
CSV), the reservoirs for the floating islands (
CSV), the
V15 ramparts (
CSV) and the
large springs (
CSV), with the WRI world power plant database (
CSV).
*
The prices: the
plants at the price of each country (
CSV) and the
lines at the price of each country (
CSV); the
V14 Soleil MAX,
V14 MAX and
V15 MAX versions for the sites that carry several plants.
*
Human development: the UNDP index, 2025 report (
CSV), which gives the choice discount of
Artesia 5, version 2.
*
The optimisation: a single calculation chooses at the same time the plants, the lines between countries and the evening storage, so that each country receives, by day and in the evening, 95% of its fossil electricity plus what it lacks to reach 500 kWh per person, at the lowest cost.
Evening storage comes from the V14's own storage, their enlarged reservoirs, existing dams generating in the evening and the V15.
*
Distribution: the connection of households and the reinforcement of local grids are then added, country by country (section 7).
------------------------------
3. THE RESULT
------------------------------
| Billion euros over 25 years | Artesia 5, version 2 | Artesia 6 | Artesia 6, flexible demand |
| Hydroloop plants, dams and floating islands | 5,701 | 5,871 | 5,479 |
| New Sky | 20 | 21 | 21 |
| Plant connection, internal lines, reinforcement | 772 | 786 | 736 |
| Export lines | 744 | 743 | 541 |
| Hybrid panels | 1,512 | 1,519 | 1,980 |
| V15 Canyon | 199 | 199 | 30 |
| V14 reservoirs enlarged for the evening | 817 | 870 | 684 |
| Titan towers, existing Pacha, Gold and Sky, O Sky | 215 | 215 | 215 |
| Distribution: connecting households and reinforcing local grids | 0 | 280 | 280 |
| Total | 9,979 | 10,505 | 9,966 |
| Comparison with the world military budget | 15% over 25 years | 16% over 25 years | 15% over 25 years |
| Comparison with the fossil fuel burned today for electricity (€917bn a year) | 10.9 years of fuel | 11.5 years of fuel | 10.9 years of fuel |
| Electricity added, TWh per year | 0 | 464 | 464 |
| People connected | 0 | 696 million | 696 million |
| Invested in low-HDI countries | 693 | 933 | 890 |
*
526 billion more, 5.3%: 246 to produce and store 464 TWh more per year, and 280 to bring it to homes.
*
The added electricity is produced locally: in the 86 countries that receive something, the plan's plants and hybrid panels produce 6,504 TWh a year instead of 6,073 (431 more), and imports only rise from 829 to 878 TWh (49 more). About nine added kWh in ten come from a plant built in the country that consumes them, with its jobs and its revenue.
*
Sub-Saharan Africa receives 391 of the 464 TWh added and 608 of the 696 million connections.
------------------------------
4. CURRENT DEMAND OR FLEXIBLE DEMAND
------------------------------
The plan is given for two ways of consuming.
*
Current demand, 10,505 billion: consumption keeps today's hours, with a peak in the evening; 52% of electricity is demanded between 5 pm and 5 am. The plan produces mostly at noon, with the sun: it must store a lot by day to return it in the evening, with enlarged reservoirs, V15 and lines that fetch the evening elsewhere.
*
Flexible demand, 9,966 billion: part of consumption moves to the middle of the day, when electricity is cheapest: water heaters, car charging, pumps, cold rooms, part of industry. The evening then weighs only 44% of demand. The plan stores less and uses more hybrid panels, which are cheap and produce at noon just when demand is there: 539 billion less, of which 392 in plants, 202 in lines, 186 in enlarged reservoirs and 169 in V15, for 461 more in hybrid panels.
*
What does not change: the electricity added for the countries that lack it keeps 60% in the evening in both cases, because a home that receives electricity for the first time lights up first in the evening. Distribution stays at 280 billion.
*
The reference figure is that of current demand: flexible demand assumes that people and businesses change their habits, with tariffs and appliances that allow it, which the plants do not decide.
------------------------------
5. THE PLANTS OF THE PLAN
------------------------------
The calculation can choose among several tens of thousands of measured sites, and it keeps those that deliver electricity at the lowest cost, transport and evening included, with the discount given to poor countries. The map shows all the sites kept: the V14 Soleil on the plateaus of the sun belt, from Mexico to India and China; the ridge V14 in the windy mountains of North America, Russia, China and Japan; the V14 near substations, mostly in China, Japan and the United States, where fossil plants are going to close; the V21 on existing dams, mostly in America, Europe and China; the V15 on the ramparts above Chinese and Indonesian cities.
The plants of Artesia 6, one dot per site; a larger dot carries several plants (MAX versions) (script:
cartes_plan_mondial_artesia_6.py)
| Plants | Artesia 5, version 2 (number) | Artesia 5, version 2 (TWh per year) | Artesia 6 (number) | Artesia 6 (TWh per year) |
| Plateau V14 Soleil | 7,187 | 7,619 | 7,597 | 8,068 |
| Mixed V14 Soleil | 176 | 179 | 193 | 196 |
| Ridge V14 | 4,236 | 4,178 | 4,269 | 4,207 |
| V14 near fossil substations | 2,931 | 2,605 | 2,937 | 2,611 |
| Sunny V21 Barrage | 1,013 | 181 | 1,012 | 181 |
| Windy V21 Barrage | 1,135 | 341 | 1,136 | 341 |
| Floating hybrid islands | 2,096 | 257 | 2,096 | 257 |
| Hybrid solar panels | 2,706 TWh | 2,714 TWh |
| V15 Canyon (storage) | 404 V15, 876 GWh | 406 V15, 879 GWh |
| Pacha, Gold and Sky among the V14 | 2,456 Pacha, 1,155 Gold, 231 Sky | 2,607 Pacha, 1,225 Gold, 245 Sky |
*
The V14 Soleil carries almost all the addition: 410 more, 449 TWh more, almost all on plateaus in Africa, first in Nigeria (76), Guinea (33), the Democratic Republic of the Congo (32) and Tanzania (26). Ridges, substations and dams hardly move.
*
The MAX versions: the 14,996 V14 of Artesia 6 form 7,835 plants, of which 3,147 MAX sites that carry two, four or six V14.
*
The complete list of plants, site by site with their country and nearest city, is in
the sites file; the
list of the Artesia 5 plants explains each type.
------------------------------
6. THE EVENING
------------------------------
Producing enough over the year is not enough: the electricity must also be there when it is consumed. The plan is calculated so that each country receives, every day, its daytime share and its evening share. Evening electricity comes from four sources: the water that each V14 raises into its reservoirs during the day, the same on a larger scale when a V14's reservoirs are enlarged, existing dams that keep their water to turbine it in the evening, and the V15 near cities.
The evening country by country: enlarged V14 reservoirs and existing dams (circles) and V15 Canyon (triangles) (script:
cartes_plan_mondial_artesia_6.py)
| Returned every evening, from 5 pm to 5 am (GWh per day) | Artesia 5, version 2 | Artesia 6 |
| Own V14 storage | 7,092 | 7,327 |
| Enlarged V14 reservoirs | 7,484 | 7,917 |
| Existing dams generating in the evening | 2,362 | 2,367 |
| V15 Canyon | 803 | 806 |
| Total | 17,741 | 18,418 |
The added evening, 676 GWh more each day, comes mainly from the own storage of the new V14 Soleil (235 GWh more) and their enlarged reservoirs (433 GWh more); existing dams return 5 more and the V15 3 more. The page
evening storage country by country details the method.
------------------------------
7. DISTRIBUTION: FROM THE SUBSTATION TO THE HOME
------------------------------
*
Connecting households: 195.7 billion euros. A mini-grid connection costs today from 1,000 to 2,100 dollars, and extending the national grid in rural Africa about 2,000 dollars, according to the World Bank ESMAP programme. The calculation counts 1,500 dollars per household of 4.8 people, that is 281 euros per person, for 696 million people. Individual solar kits, which are cheaper, are not counted: they do not give 500 kWh a year.
*
Reinforcing local grids: 84.7 billion euros. The 464 TWh added require about 106 GW of peak (load factor of 0.5), counted at 800 euros per kW of transformers and low-voltage lines. This is a cautious assumption, not a measured price.
*
For comparison: the United Nations estimates at 45 billion dollars a year, about 40 billion euros, the investment needed for access to electricity by 2030. The 280 billion of Artesia 6 represent about seven years of it, and the plan also pays for the plants that produce this electricity.
------------------------------
8. BY REGION
------------------------------
| Region | Countries receiving | Electricity added (TWh per year) | People connected (millions) | Distribution (€bn) |
| Sub-Saharan Africa | 47 | 391.4 | 608 | 242.6 |
| South Asia | 5 | 28.0 | 28 | 12.8 |
| Others (Yemen, Myanmar, North Korea, Haiti, Papua New Guinea, Syria, Philippines...) | 34 | 44.3 | 60 | 25.0 |
| Total | 86 | 463.7 | 696 | 280.4 |
------------------------------
9. COUNTRY BY COUNTRY
------------------------------
The 60 countries that receive at least 0.3 TWh a year, ranked by electricity added. The 86 countries are in
the countries file; for a few micro-states (Guyana, Fiji, Cape Verde, Grenada...), the addition is below 0.05 TWh and shows there as 0.0.
| Country | HDI (2025 report) | Inhabitants (millions) | Access to electricity (%) | kWh per person today | kWh per person with Artesia 6 | Added (TWh per year) | Connected (millions) | Distribution (€bn) | Produced, Artesia 5 v2 (TWh) | Produced, Artesia 6 (TWh) | Imports, Artesia 6 (TWh) | Invested in the country (€bn) |
| Nigeria | 0.560 | 237.5 | 61.2 | 165 | 500 | 79.5 | 92.2 | 40.5 | 27.1 | 114.5 | 0.0 | 92.6 |
| Congo, The Democratic Republic of the | 0.522 | 109.3 | 22.1 | 159 | 548 | 42.6 | 85.1 | 31.7 | 13.7 | 46.1 | 0.0 | 52.6 |
| Ethiopia | 0.497 | 135.5 | 55.4 | 229 | 500 | 36.7 | 60.4 | 23.7 | 35.5 | 41.0 | 0.0 | 38.6 |
| Tanzania | 0.555 | 68.6 | 48.3 | 132 | 500 | 25.2 | 35.5 | 14.6 | 5.7 | 33.8 | 0.0 | 29.4 |
| Uganda | 0.582 | 50.0 | 51.5 | 107 | 500 | 19.6 | 24.3 | 10.4 | 0.8 | 21.5 | 0.0 | 20.6 |
| Yemen | 0.470 | 40.6 | 83.6 | 129 | 500 | 15.0 | 6.7 | 4.6 | 878.5 | 901.6 | 0.0 | 355.5 |
| Afghanistan | 0.496 | 42.6 | 85.3 | 160 | 500 | 14.5 | 6.3 | 4.4 | 287.3 | 287.3 | 0.0 | 130.5 |
| Madagascar | 0.487 | 32.0 | 39.4 | 76 | 500 | 13.6 | 19.4 | 7.9 | 3.3 | 18.2 | 0.0 | 15.5 |
| Kenya | 0.628 | 57.5 | 76.2 | 271 | 500 | 13.2 | 13.7 | 6.3 | 2.7 | 15.0 | 0.0 | 12.9 |
| Niger | 0.419 | 27.0 | 20.1 | 80 | 500 | 11.4 | 21.6 | 8.2 | 8.9 | 21.6 | 0.0 | 18.2 |
| Mozambique | 0.493 | 34.6 | 36.0 | 476 | 796 | 11.1 | 22.2 | 8.3 | 15.2 | 14.2 | 0.0 | 14.2 |
| Chad | 0.416 | 20.3 | 12.0 | 18 | 500 | 9.8 | 17.9 | 6.8 | 0.1 | 4.3 | 7.4 | 9.2 |
| Sudan | 0.511 | 50.4 | 66.0 | 309 | 500 | 9.7 | 17.1 | 6.6 | 10.6 | 12.8 | 0.0 | 11.8 |
| Angola | 0.616 | 37.9 | 51.1 | 411 | 656 | 9.3 | 18.5 | 6.9 | 10.1 | 13.5 | 0.0 | 12.3 |
| Burkina Faso | 0.459 | 23.5 | 21.7 | 135 | 527 | 9.2 | 18.4 | 6.9 | 0.0 | 0.0 | 12.3 | 6.9 |
| Malawi | 0.517 | 21.7 | 15.6 | 84 | 506 | 9.1 | 18.3 | 6.8 | 1.6 | 10.1 | 0.0 | 11.6 |
| Somalia | 0.404 | 19.0 | 50.3 | 23 | 500 | 9.1 | 9.4 | 4.3 | 0.1 | 10.4 | 0.0 | 9.4 |
| Cameroon | 0.588 | 29.1 | 72.0 | 251 | 500 | 7.2 | 8.2 | 3.6 | 5.7 | 20.5 | 0.0 | 12.0 |
| Mali | 0.419 | 24.5 | 54.5 | 223 | 500 | 6.8 | 11.1 | 4.4 | 4.8 | 12.3 | 0.0 | 10.3 |
| Burundi | 0.439 | 14.0 | 11.6 | 41 | 500 | 6.5 | 12.4 | 4.7 | 0.4 | 7.2 | 0.0 | 8.3 |
| Myanmar | 0.609 | 54.5 | 76.8 | 402 | 518 | 6.3 | 12.6 | 4.7 | 612.4 | 612.4 | 0.0 | 278.6 |
| Côte d'Ivoire | 0.582 | 31.9 | 72.4 | 315 | 500 | 5.9 | 8.8 | 3.6 | 2.8 | 0.7 | 12.3 | 3.8 |
| Rwanda | 0.578 | 14.3 | 63.9 | 86 | 500 | 5.9 | 5.2 | 2.5 | 0.5 | 4.6 | 2.3 | 5.1 |
| South Sudan | 0.388 | 11.9 | 5.4 | 47 | 520 | 5.7 | 11.3 | 4.2 | 0.0 | 6.3 | 0.5 | 7.9 |
| North Korea | | 26.5 | 57.5 | 1,023 | 1,235 | 5.6 | 11.3 | 4.2 | 157.7 | 156.3 | 0.0 | 80.0 |
| Pakistan | 0.544 | 255.2 | 95.6 | 766 | 788 | 5.6 | 11.2 | 4.2 | 436.5 | 436.5 | 0.0 | 187.0 |
| Zambia | 0.595 | 21.3 | 51.1 | 779 | 1,023 | 5.2 | 10.4 | 3.9 | 15.8 | 35.6 | 0.0 | 18.0 |
| Haiti | 0.554 | 11.8 | 51.3 | 73 | 500 | 5.0 | 5.7 | 2.5 | 9.4 | 12.6 | 0.0 | 9.6 |
| Benin | 0.515 | 14.5 | 57.0 | 160 | 500 | 4.9 | 6.2 | 2.6 | 0.2 | 1.0 | 5.8 | 3.2 |
| Papua New Guinea | 0.576 | 10.6 | 20.5 | 447 | 844 | 4.2 | 8.4 | 3.1 | 3.6 | 6.0 | 2.5 | 6.8 |
| Sierra Leone | 0.467 | 8.6 | 35.5 | 24 | 500 | 4.1 | 5.6 | 2.3 | 0.2 | 4.7 | 0.0 | 4.6 |
| South Africa | 0.741 | 64.7 | 87.7 | 3,658 | 3,719 | 4.0 | 8.0 | 3.0 | 19.7 | 21.6 | 167.7 | 15.2 |
| Nepal | 0.622 | 29.7 | 94.0 | 372 | 500 | 3.8 | 1.8 | 1.2 | 98.7 | 98.7 | 0.0 | 42.7 |
| India | 0.685 | 1,463.9 | 99.5 | 1,423 | 1,425 | 3.7 | 7.3 | 2.7 | 1,034.3 | 1,034.3 | 445.3 | 388.6 |
| Guinea | 0.500 | 14.8 | 51.1 | 273 | 518 | 3.6 | 7.2 | 2.7 | 18.8 | 57.0 | 0.0 | 26.2 |
| Zimbabwe | 0.598 | 16.6 | 62.0 | 727 | 917 | 3.2 | 6.3 | 2.4 | 18.6 | 25.5 | 0.0 | 13.2 |
| Central African Republic | 0.414 | 5.2 | 17.6 | 27 | 501 | 2.4 | 4.2 | 1.6 | 0.1 | 2.7 | 0.0 | 3.1 |
| Senegal | 0.530 | 18.5 | 74.2 | 439 | 569 | 2.4 | 4.8 | 1.8 | 0.1 | 2.7 | 5.6 | 3.3 |
| Liberia | 0.510 | 5.6 | 32.5 | 102 | 501 | 2.2 | 3.8 | 1.5 | 0.3 | 1.1 | 1.6 | 2.0 |
| Togo | 0.571 | 8.4 | 59.2 | 263 | 500 | 2.0 | 3.4 | 1.3 | 0.5 | 4.4 | 0.0 | 3.3 |
| Ghana | 0.628 | 34.4 | 89.5 | 634 | 687 | 1.8 | 3.6 | 1.4 | 10.8 | 10.8 | 5.5 | 5.5 |
| Congo | 0.649 | 6.3 | 51.3 | 850 | 1,093 | 1.5 | 3.1 | 1.1 | 4.2 | 6.0 | 0.0 | 3.9 |
| Syria | 0.564 | 24.7 | 88.4 | 984 | 1,042 | 1.4 | 2.9 | 1.1 | 46.5 | 48.4 | 0.0 | 20.5 |
| Eritrea | 0.503 | 3.5 | 54.4 | 127 | 501 | 1.3 | 1.6 | 0.7 | 0.4 | 1.9 | 0.0 | 1.6 |
| Mauritania | 0.563 | 5.2 | 50.3 | 458 | 706 | 1.3 | 2.6 | 1.0 | 0.1 | 1.0 | 1.9 | 1.5 |
| Philippines | 0.720 | 116.8 | 98.0 | 1,054 | 1,064 | 1.2 | 2.3 | 0.9 | 92.7 | 93.9 | 0.0 | 51.6 |
| Guinea-Bissau | 0.514 | 2.2 | 40.5 | 36 | 500 | 1.0 | 1.3 | 0.6 | 0.0 | 0.0 | 1.3 | 0.6 |
| Libya | 0.721 | 7.4 | 73.2 | 4,686 | 4,820 | 1.0 | 2.0 | 0.7 | 34.8 | 35.9 | 0.0 | 17.6 |
| Gambia | 0.524 | 2.8 | 66.9 | 185 | 500 | 0.9 | 0.9 | 0.4 | 0.0 | 0.0 | 1.5 | 0.4 |
| Indonesia | 0.728 | 283.5 | 99.4 | 1,314 | 1,317 | 0.8 | 1.7 | 0.6 | 300.5 | 301.4 | 0.0 | 168.3 |
| Peru | 0.794 | 34.6 | 96.2 | 1,749 | 1,768 | 0.7 | 1.3 | 0.5 | 20.3 | 20.9 | 0.0 | 7.7 |
| Namibia | 0.665 | 3.0 | 56.7 | 1,333 | 1,551 | 0.7 | 1.3 | 0.5 | 90.2 | 106.7 | 0.0 | 45.3 |
| Lesotho | 0.550 | 2.3 | 57.3 | 248 | 501 | 0.6 | 1.0 | 0.4 | 32.7 | 32.7 | 0.0 | 15.9 |
| Cambodia | 0.606 | 17.8 | 95.0 | 1,254 | 1,280 | 0.5 | 0.9 | 0.3 | 58.2 | 58.9 | 0.0 | 28.3 |
| Bangladesh | 0.685 | 175.7 | 99.5 | 672 | 674 | 0.4 | 0.9 | 0.3 | 2.2 | 2.2 | 94.4 | 1.3 |
| Nicaragua | 0.706 | 6.9 | 88.3 | 784 | 842 | 0.4 | 0.8 | 0.3 | 0.9 | 1.3 | 0.7 | 0.9 |
| Colombia | 0.788 | 53.4 | 98.7 | 1,715 | 1,721 | 0.3 | 0.7 | 0.3 | 21.4 | 21.9 | 0.0 | 8.1 |
| Equatorial Guinea | 0.674 | 1.9 | 66.9 | 787 | 951 | 0.3 | 0.6 | 0.2 | 0.1 | 0.1 | 1.2 | 0.3 |
| Botswana | 0.731 | 2.5 | 76.0 | 1,852 | 1,971 | 0.3 | 0.6 | 0.2 | 3.4 | 3.8 | 0.0 | 2.0 |
| Solomon Islands | 0.584 | 0.8 | 81.3 | 134 | 500 | 0.3 | 0.1 | 0.1 | 0.0 | 0.0 | 0.5 | 0.1 |
*
Nigeria goes from 27 to 114.5 TWh produced at home, without importing anything: 93 billion euros invested, 92 million people connected.
*
The Democratic Republic of the Congo, Ethiopia, Tanzania and Uganda follow: together 124 TWh added and 205 million people connected.
*
Yemen and Afghanistan, already large exporters in Artesia 5 human development, also cover their own inhabitants: Yemen by producing a little more (902 TWh instead of 879) without exporting less, Afghanistan by exporting 15 TWh less (250 instead of 265).
*
Burkina Faso and Chad import most of their added electricity from their neighbours: the calculation keeps few or no plants there.
------------------------------
10. WHERE THE MONEY GOES
------------------------------
A plan of this size is also an investment plan: each plant built in a country brings construction sites, jobs, then revenue for decades. Since Artesia 5, version 2, the calculation gives poor countries a discount when choosing the plants (not when paying for them): at almost equal cost, the plant goes to the country that most needs it to develop.
The money invested in each country over 25 years, in billion euros, according to its human development index (script:
cartes_plan_mondial_artesia_6.py)
| HDI category | Need, Artesia 5 v2 (TWh) | Need, Artesia 6 (TWh) | Invested, Artesia 5 v2 (€bn) | Invested, Artesia 6 (€bn) | Produced, Artesia 6 (TWh) | Exported, Artesia 6 (TWh) |
| Low | 113 | 352 | 693 | 933 | 1,901 | 1,439 |
| Medium | 1,844 | 2,053 | 948 | 1,178 | 2,554 | 1,078 |
| High | 8,151 | 8,160 | 4,092 | 4,119 | 7,983 | 1,491 |
| Very high | 6,969 | 6,969 | 3,136 | 3,161 | 5,909 | 1,652 |
| No published index | 283 | 289 | 110 | 113 | 228 | 154 |
Low-HDI countries receive 240 billion more, medium-HDI countries 230 more. The need of low-HDI countries triples, from 113 to 352 TWh a year, and they remain exporters: their best sites serve their inhabitants first, then their neighbours.
------------------------------
11. WHAT IF THE MINIMUM WERE RAISED?
------------------------------
| Minimum per person per year | Electricity added (TWh per year) | Distribution (€bn) | Cost of the plan (€bn) | World military budget | Additional CO2 avoided (million tonnes per year) |
| 0 (Artesia 5, version 2) | 0 | 0 | 9,979 | 15% | 0 |
| 250 kWh | 186 | 230 | 10,304 | 16% | 140 |
| 500 kWh (Artesia 6) | 464 | 280 | 10,505 | 16% | 348 |
| 750 kWh | 814 | 344 | 10,767 | 17% | 611 |
| 1,000 kWh | 1,272 | 428 | 11,132 | 17% | 954 |
* The first step is the most expensive per kWh, because everyone must first be connected: 196 billion from 250 kWh. Then each 250 kWh step adds 200 to 365 billion. The modern energy minimum of 1,000 kWh would cost 1,153 billion more than Artesia 5, version 2.
------------------------------
12. THE EXPORT LINES
------------------------------
The best sites are not always where electricity is consumed. The plan builds direct current lines between countries when producing far away and transporting costs less than producing on site: Mexico sells its sun to the United States, Yemen to the Arabian Peninsula, Russia its wind to China. Each line is paid at the price of the countries it connects and loses 1.5% in its converter stations, plus 3% per 1,000 km.
Who exports and who imports: in green the countries that sell more than they buy, in red the opposite, in purple the export lines (script:
cartes_plan_mondial_artesia_6.py)
Artesia 6 hardly changes the electricity trade: 5,813 TWh a year on the export lines, as in Artesia 5 human development, with 459 TWh of losses. The first ten:
| From | To | TWh per year | GW | km on land | km under the sea | Billion euros |
| Russia | China | 993 | 227 | 3,207 | 0 | 98.0 |
| Mexico | United States | 941 | 215 | 2,201 | 0 | 233.5 |
| Yemen | Saudi Arabia | 356 | 81 | 1,206 | 0 | 23.3 |
| Pakistan | India | 318 | 72 | 1,657 | 0 | 21.3 |
| Myanmar | China | 310 | 71 | 2,447 | 0 | 25.8 |
| Russia | South Korea | 219 | 50 | 2,644 | 0 | 23.4 |
| Myanmar | Taiwan | 203 | 46 | 2,548 | 252 | 30.8 |
| Thailand | China | 186 | 42 | 2,553 | 0 | 15.9 |
| Spain | Germany | 162 | 37 | 1,753 | 0 | 46.9 |
| Yemen | Iraq | 119 | 27 | 2,370 | 0 | 9.8 |
All the lines are in
the lines file.
------------------------------
13. CLIMATE FIRST
------------------------------
*
What the plan erases: 95% of each country's fossil electricity, 17,360 TWh a year, about 13.7 billion tonnes of CO2 a year, a third of the planet's energy emissions.
*
What the plan avoids: the 464 TWh added, if they were produced with diesel and coal (0.75 tonne of CO2 per MWh), would emit about 350 million tonnes a year. With Artesia 6, this growth is clean from the start.
*
What the plan does not do: it does not push consumption beyond this minimum. The aim remains to slow warming, and the added electricity only serves to prevent the poorest countries from producing it with fossil fuels.
------------------------------
14. WHAT THIS CALCULATION DOES NOT SAY
------------------------------
*
The population is growing: the calculation gives 500 kWh to today's inhabitants. Sub-Saharan Africa gains about 2.5% inhabitants a year; in 25 years, keeping the same minimum will require nearly 85% more in these countries.
*
Distribution is the least certain part: the price of connection is measured, that of reinforcing local grids is an assumption, and the real cost depends on the density of villages and the distance to the grid.
*
Cooking is not counted: about two billion people still cook with wood, charcoal or kerosene. Giving them electric cooking would require much more than 500 kWh per person.
*
Country risk remains that of Artesia 5, version 2: Somalia, Sudan, South Sudan or Chad are at war or unstable, and a plant there would cost more to insure and finance.
*
The minimum is a national average: it does not guarantee that each household receives 500 kWh, only that the country has enough to do so.
*
The comparisons use a rate of 0.9 euro per dollar and the figures for 2025; the world military budget and investment in clean energy increase every year.
------------------------------
15. THE RISK OF UNSTABLE COUNTRIES, AND HOW TO COVER IT
------------------------------
*
Why the chance that costs hold falls by one point: on the
home page, the estimate goes from 76 to 75% with Artesia 6, for two reasons. The 85 billion for reinforcing local grids are an assumption and not a measured price, and a larger share of the plan is built in countries at war or unstable, where a plant costs more to insure and finance.
*
UN support is not enough to raise this figure: an estimate is based on what the plan contains, not on what might happen, and UN support is neither decided nor costed. Peacekeepers are few, their mandates are limited and they do not guard installations for 25 years. In these countries, the extra cost comes first from insurance and the cost of money, more than from the attacks themselves.
*
What would raise it: guarantees against political risk, which already exist. MIGA, a World Bank subsidiary, insures investments against war, civil disturbance, expropriation and breach of contract; the African Development Bank grants its own guarantees, and ATIDI (African Trade & Investment Development Insurance) insures investments in Africa. Included in the plan as a costed item, an annual premium on the plants in the countries on the World Bank list of fragile and conflict-affected situations, they would make the plan a little more expensive but its costs more certain, because the risk would be paid in advance instead of remaining unknown.
*
What remains to be done: choose the list of countries covered and a verified premium rate, then add this item to the calculation. Until that is done, the estimate stays at 75%.
------------------------------
CONCLUSION
------------------------------
For 526 billion euros more, 5.3% of the plan, Artesia 6 connects the 696 million people who do not have electricity and gives each country at least 500 kWh per person, producing almost everything locally, above all in sub-Saharan Africa. The plan rises to 10,505 billion, 16% of the world military budget over 25 years and 11.5 years of the fuel the world burns today for its electricity, 9,966 with flexible demand. It remains first of all a plan for the climate: it still replaces 95% of fossil electricity, and the electricity it adds is clean from the first kWh.
------------------------------
THE PAGES OF THE PLAN'S INVENTIONS
------------------------------
Hydroloop V14 |
V14 Soleil |
V14 Soleil MAX |
V14 MAX |
V15 Canyon |
V15 MAX |
V16 Pacha |
V17 Gold |
V18 Sky |
V21 Barrage |
hybrid solar panel |
floating hybrid panel |
best locations |
inventory of inventions |
good ideas
------------------------------
SOURCES
------------------------------
The calculation (Python),
the diagram (Python),
the sites,
the V15,
the countries,
the lines,
the totals,
flexible demand,
the sweep
The rate of access to electricity by country:
World Bank, indicator EG.ELC.ACCS.ZS, 2023 (
CSV)
Consumption and population by country:
Our World in Data, energy data (
CSV)
People without electricity, cooking and investment needs:
United Nations, Goal 7 and
Tracking SDG 7 2025
The price of connections:
ESMAP, World Bank, "Mini Grids for Half a Billion People", 2019
The modern energy minimum:
Energy for Growth Hub and its
January 2021 report
The world military budget:
SIPRI, world military spending 2025, April 2026
World investment in clean energy: International Energy Agency,
World Energy Investment 2025
The human development index: UNDP, Human Development Report 2025 (
CSV)
The plan's input data: those of
Artesia 5, version 2 and of section 2