Artesia 5 world plan, version 2, human development: for 60 billion more, the plan's plants go first to poor countries, which invest 56% more and export 60% more, 95% of fossil electricity replaced in every country, evenings included, for 9,979 billion euros

Version 1 recalculated looks for the cheapest plan for the world: 9,919 billion euros, with the evening guaranteed in every country. It already places many plants in countries of the South, because the sun is better there, but it does not take this into account: a euro invested in Yemen is worth a euro invested in Saudi Arabia. This version 2 does the same calculation, with the same sites, the same prices and the same obligations, and a single extra rule: at almost equal cost, the plant goes to the country that most needs it to develop.

Code (Python, free): calcul_plan_mondial_artesia_5_v2_developpement_humain.py (run without arguments for version 2, with a number between 0 and 1 for another discount, with "souple" for flexible demand, with "balayage" for all discounts); the diagram: schema_plan_mondial_artesia_5_v2_developpement_humain.py; the results: the sites, the V15, the countries, the lines, the totals, those of flexible demand and the sweep; the human development index: idh_pnud_2025.csv

Related pages: Artesia 5, version 1 recalculated | Artesia 5, first version | the Artesia 5 plants | evening storage | the price of plants

Map of the plants of the Artesia 5 plan, version 2, by the human development index of their country, investment by category and cost of the development preference

------------------------------
1. THE RULE: A DISCOUNT TO CHOOSE, NOT TO PAY
------------------------------

* How the plan chooses: the calculation compares all possible plants and keeps those that deliver 95% of each country's fossil electricity, by day and in the evening, at the lowest total cost. In version 1, two plants delivering the same electricity to the same customer are decided by their price alone.
* The discount: in version 2, at the moment of choosing, the price of a plant built in a country with a low human development index (HDI) is counted with a 25% discount, 19% in a medium-HDI country, 12.5% in a high-HDI country, and no discount in a very-high-HDI country. The discount applies to everything built in the country: the plant, its connection, the hybrid panels, the V15 and the enlarged reservoirs. Export lines, which cross borders, do not get it.
* An example, with rounded figures to illustrate it: a V14 Soleil in Yemen costs 500 million euros, its neighbour in Saudi Arabia 450, and they deliver the same electricity to Riyadh. Version 1 takes the Saudi one, 50 million cheaper. For version 2, the Yemeni one counts 375 million in the choice, and it is taken. It is still paid 500: the extra 50 million are the price of the preference, and it is their sum over the whole plan that makes the 60 billion of section 2.
* More expensive transport is accepted: the discount applies to the plant and its connection, whatever the destination of its electricity. A plant in a poor country that supplies a rich country can therefore keep its place even if its export line costs more than that of a site in a rich country: the poor country works for the rich country, and receives the investment and the revenue.
* The published cost is the real one: the discount only serves to choose. All the amounts on this page are the real prices, at each country's price, as in version 1.
* The measure of development: the UNDP HDI, which combines life expectancy, schooling and income, and not income alone, in the Human Development Report 2025 (2023 values), for 193 countries, taken from the World Book ranking. Countries without a published index (Taiwan, North Korea, Kosovo, overseas territories) get no discount. The four UNDP categories: low (below 0.55), medium (0.55 to 0.70), high (0.70 to 0.80), very high (0.80 and above).
* Why 25%: it is the largest discount that keeps the plan below 10,000 billion. At 30%, the plan goes to 10,012; at 40%, to 10,100 (section 3).

------------------------------
2. THE RESULT
------------------------------

Billion euros over 25 yearsVersion 1 recalculatedVersion 2, human developmentVersion 2, flexible demand
Hydroloop plants, dams and floating islands5,8285,7015,311
New Sky202020
Connection, internal lines, reinforcement883772722
Export lines660744542
Hybrid panels1,4081,5121,972
V15 Canyon11519929
V14 reservoirs enlarged for the evening790817631
Titan towers, existing Pacha, Gold and Sky, O Sky215215215
Total9,9199,9799,441
Invested in low-HDI countries444693646
Exported by low-HDI countries, TWh per year9241,4901,391
Russia to China, TWh per year1,339964166

* 60 billion more, 0.6%, for 9,979 billion, still below 10,000 and still with the evening guaranteed in every country: 17.7 TWh returned every evening, 7.1 by the V14's own storage, 7.5 by their enlarged reservoirs, 2.4 by existing dams and 0.8 by the V15.
* Low-HDI countries receive 693 billion instead of 444, 56% more, and produce 1,717 TWh a year instead of 1,101. They consume only 113 to replace their fossil electricity, and export the rest: 1,490 TWh a year, that is, sold at 40 €/MWh, 60 billion euros of revenue each year instead of 37.
* High-HDI countries, which include China, Mexico and Thailand, receive 425 billion more; very-high-HDI countries, 727 less, mainly Saudi Arabia, Russia and the United States.
* With flexible demand, the plan comes down to 9,441 billion, and China takes only 166 TWh from Russia.

------------------------------
3. WHERE THE MONEY GOES, AND WHAT THE DISCOUNT COSTS
------------------------------

HDI categoryFossil electricity to replace, TWh per yearInvested, version 1 (€bn)Invested, version 2 (€bn)Produced, version 1 (TWh)Produced, version 2 (TWh)Exported, version 1 (TWh)Exported, version 2 (TWh)
Low1134446931,1011,7179241,490
Medium1,8449189482,2622,3161,0001,050
High8,1513,6674,0927,3577,9401,1941,469
Very high6,9693,8633,1367,0625,8642,0301,635
No published index283110110229229161161

The discount was tried from 0 to 40% for a low-HDI country (and in the same proportion for the others):

Discount, low HDIReal cost of the plan (€bn)Invested in low-HDI countries (€bn)Invested in medium-HDI countries (€bn)Exported by low-HDI countries (TWh per year)Russia to China (TWh per year)
0 (version 1)9,9194449189241,339
10%9,9295089251,0661,186
20%9,9666599311,415997
25% (version 2)9,9796939481,490964
30%10,0127291,0511,571820
40%10,1008131,2551,750522

* The first steps cost almost nothing: up to 20%, each additional billion shifts nearly 5 billion of investment to low- and medium-HDI countries. Between 30 and 40%, only a little more than 3, and the plan exceeds 10,000: it goes looking for clearly worse sites.
* The rule does not create sites: it chooses among those that are measured. A poor country with no sunny plateau or windy ridge within reach of a line, such as Nigeria, Bangladesh or Ethiopia, gains almost nothing.

------------------------------
4. THE COUNTRIES THAT GAIN AND THOSE THAT GIVE WAY
------------------------------

In TWh per year; output of the country's plants and hybrid panels; version 2 investment in the country.

CountryHDI (2025 report)Produced, version 1Produced, version 2Exports, version 1Exports, version 2Imports, version 1Imports, version 2Invested, version 2 (€bn)
Yemen0.47032387829380500341
China0.7974,1304,458001,7951,4822,353
Mexico0.7899421,2506369411031728
Afghanistan0.49625228723226500126
Guatemala0.66214359280017
Tajikistan0.6918216200012
Ukraine0.77931422130019
Pakistan0.54442843631632300183
Niger0.4191907004
Syria0.564404615210019
Cambodia0.606525839440027
Namibia0.665869079830037
Saudi Arabia0.9004478100033834
Russia0.8322,2211,8621,5451,1773123934
United States0.9381,8341,540005848651,082
Oman0.858519000384
Israel0.9193900027650
Jordan0.754132105105800039

* Yemen becomes the great producer of the Arabian Peninsula: 784 V14 Soleil on its plateaus, 879 TWh a year instead of 323, of which 805 exported to Saudi Arabia, Iraq, the Emirates, Kuwait, Qatar, Oman and Bahrain; 341 billion euros invested in a country whose whole economy produces some twenty billion dollars a year, and 32 billion of export revenue each year. Saudi Arabia, which produced 447 TWh itself, now produces only 81 and imports the rest.
* Mexico sends 941 TWh a year to the United States instead of 636: 728 billion invested and 38 billion of revenue a year. This is what version 1 announced, and version 2 pushes it further.
* China, with a high HDI, produces 328 TWh more at home with hybrid panels, places 369 V15 instead of 188 for its evening, and imports 1,482 TWh instead of 1,795.
* Afghanistan, Guatemala, Tajikistan, Ukraine, Pakistan, Niger, Syria and Cambodia produce more, often for their neighbours.
* Russia exports 1,177 TWh instead of 1,545, the United States produces 295 TWh less at home.

------------------------------
5. THE EXPORT LINES
------------------------------

5,805 TWh a year, 744 billion euros. The first twelve:

FromToTWh per yearGWkm on landkm under the seaBillion euros
RussiaChina9642203,207095.2
MexicoUnited States9412152,2010233.5
YemenSaudi Arabia356811,206023.3
PakistanIndia323741,657021.6
MyanmarChina317722,447026.3
RussiaSouth Korea213492,644022.7
MyanmarTaiwan203462,54825230.8
ThailandChina186422,553015.9
SpainGermany162371,753046.9
AfghanistanIndia129292,191010.0
North KoreaJapan1192726077932.5
YemenIraq113262,37009.4

------------------------------
6. CHINA AND RUSSIA
------------------------------

* Version 1 let China take 1,339 TWh a year from Russia, 23% of its need, through a single border. Version 2 brings it down to 964 TWh, 16%, without any rule specific to China: Russia, with a very high HDI, gets no discount, China, with a high HDI, gets one, and Myanmar, with a medium HDI, delivers 317 TWh to China.
* A direct rule was also tried: no country receives more than 20% of its electricity from a single neighbour. It costs 56 billion, hardly moves Russia (1,326 TWh), because China is so large that 20% of its need remains more than what Russia sends it, and it cuts the exports of low-HDI countries from 924 to 742 TWh, because Yemen or Afghanistan mainly supply one large neighbour. It is not kept: it protects China less than the development discount and it penalises poor countries.
* With flexible demand, China consumes more at noon, produces more at home with hybrid panels and takes only 166 TWh from Russia.

------------------------------
7. WHAT THIS CALCULATION DOES NOT SAY
------------------------------

* Country risk: Yemen, Syria, Afghanistan and Haiti are at war or unstable. The calculation does not count the price of risk: a plant there would cost more to insure and finance, and a neighbour would hesitate to depend on its lines. Version 2 says where the plants would go if these countries were at peace; it is also what peace would bring them.
* Revenue is not development: 40 €/MWh is an assumed selling price, and this revenue only benefits the inhabitants if the State and the operators share it. The plan can ask for it, not guarantee it.
* Access to electricity is not counted: the plan replaces today's fossil electricity. Low-HDI countries burn only 113 TWh a year; the plan does not give them the electricity they do not yet have. The Artesia 6 plan adds this need: at least 500 kWh per person and the connection of the 696 million people without electricity, for 526 billion more.
* The HDI is updated by replacing the file idh_pnud_2025.csv.

------------------------------
CONCLUSION
------------------------------

For 60 billion euros more, 0.6% of the plan, version 2 sends 249 billion more to low-HDI countries, raises their exports from 924 to 1,490 TWh a year, makes Yemen and Mexico the great suppliers of their rich neighbours, and cuts China's dependence on Russia by a quarter, still below 10,000 billion and with the evening guaranteed in every country. The sun of poor countries was already the cheapest; it takes little for it to also be the first chosen.

------------------------------
SOURCES
------------------------------

The calculation (Python), the diagram (Python), the sites, the V15, the countries, the lines, the totals, the sweep
The human development index: UNDP, Human Development Report 2025, taken from the World Book ranking (idh_pnud_2025.csv)
The input data: those of version 1 recalculated
The site's good ideas

Olivier Muhleisen in collaboration with Claude (Anthropic), October 2026. Plans, diagrams, texts and figures under the CC BY 4.0 licence.