1. THE METHOD: FOUR FAMILIES, MEASURED COSTS
------------------------------
Each plant on the site is made of four families of spending, and each has its price in each country, France = 1:
*
Photovoltaics (trackers, floating panels, hybrid panels): the installed cost of large solar farms measured by IRENA in 2023 in 33 countries, from 659 dollars per kW in Bulgaria to 1,255 in South Africa, France at 955. For the other countries, the median of their region, or that of the 33 countries when the region has fewer than two measurements. Japan, without a measurement, is taken as South Korea.
*
Wind: the installed cost of onshore wind farms measured by IRENA in 2023, by country when it exists (China 986 dollars per kW, Brazil 1,079, Spain 1,158, India 1,208, Japan 2,384), otherwise by region, relative to Europe (1,583).
*
Hydraulics (reservoirs, pipes, powerhouse, shaft, cavern, Pacha lakes): the installed cost of large hydro plants from 2016 to 2023, by country (India 1,586 dollars per kW, Brazil 1,707, China 2,017) or by region, relative to Europe (2,318). It is bounded between 0.6 and 1.3, because the figures for North America and Oceania include a few large dams with enormous overruns, which do not resemble the site's reservoirs.
*
The grid (substations, connection, line to the grid): the price of a new substation from the page on the
price of lines, already calibrated on five large real projects.
The price of a plant in a country is the sum of its items, each multiplied by the price of its family in that country:
| Plant (French series price) | Photovoltaics | Wind | Hydraulics | Grid | Instrumentation, world price |
| Ridge V14 (364 M€) | 9 | 229 | 102 | 22 | 0.5 |
| V14 Soleil (465 M€, line included) | 303 | | 113 | 49 | 0.5 |
| Mixed V14 Soleil (461 M€) | 132 | 172 | 108 | 49 | 0.5 |
| Substation V14 Soleil (475 M€) | 303 | | 113 | 59 | 0.5 |
| V15 Canyon (650 M€) | 57 | | 564 | 25 | 0.7 |
| Pacha, Gold, Sky | | | 100% | | |
| Hybrid panels and floating islands | 80% | | | 20% | |
| Windy V21 Barrage | | 85% | | 15% | |
------------------------------
2. WHAT THE MEASURED COSTS SAY
------------------------------
*
A country's price level explains little of the price of its plants. For the lines, the World Bank price level was enough to extend five real projects to the world. For the plants, no: China and Spain build their solar farms at the same price, 671 dollars per kW, although living costs a third less in China; South Africa, a cheap country, is the most expensive of the 33, because of its local content rules; South Korea pays 1,205. What makes the price is the size and maturity of the market, not wages. That is why the page takes the measured costs, country by country when they exist, and not a formula.
*
Photovoltaics and wind vary from 0.6 to 1.5 from one country to another; hydraulics from 0.7 to 1.3; the grid from 0.3 to 2.6, because substations and lines do follow wages and local rules.
*
The two large countries of the plan go in opposite directions: China builds its V14 Soleil 30% cheaper than France, the United States 28% more expensive.
------------------------------
3. THE FIRST 30 COUNTRIES OF THE PLAN
------------------------------
Ranked by what Artesia 5 builds there. The four families and the four main plants, France = 1; on the right, the price of the plan's plants in the country, in billion euros, at the French price then at the country's price.
| Country | Photovoltaics | Wind | Hydraulics | Grid | V14 Soleil | Ridge V14 | V15 Canyon | Hybrid panels | Plants of the plan, French price (€bn) | At the country's price (€bn) |
| China | 0.70 | 0.62 | 0.87 | 0.31 | 0.70 | 0.68 | 0.83 | 0.62 | 1,186 | 820 |
| United States | 1.16 | 0.94 | 1.30 | 1.94 | 1.28 | 1.11 | 1.31 | 1.32 | 853 | 1,018 |
| Russia | 1.31 | 1.02 | 1.03 | 0.31 | 1.14 | 0.99 | 1.03 | 1.11 | 703 | 696 |
| India | 0.75 | 0.76 | 0.68 | 0.31 | 0.69 | 0.71 | 0.68 | 0.66 | 489 | 335 |
| Myanmar | 0.84 | 1.27 | 0.85 | 0.31 | 0.78 | 1.09 | 0.83 | 0.73 | 293 | 230 |
| Iran | 0.79 | 1.27 | 0.88 | 0.31 | 0.76 | 1.09 | 0.85 | 0.69 | 235 | 190 |
| Japan | 1.26 | 1.51 | 0.85 | 0.72 | 1.10 | 1.27 | 0.88 | 1.15 | 229 | 268 |
| Thailand | 0.84 | 1.27 | 0.85 | 0.31 | 0.78 | 1.09 | 0.83 | 0.73 | 215 | 169 |
| Mexico | 1.10 | 0.94 | 1.30 | 0.54 | 1.09 | 1.02 | 1.25 | 0.99 | 200 | 217 |
| Pakistan | 0.84 | 1.27 | 0.85 | 0.31 | 0.78 | 1.09 | 0.83 | 0.73 | 187 | 147 |
| Saudi Arabia | 0.83 | 1.27 | 0.88 | 0.45 | 0.80 | 1.10 | 0.86 | 0.76 | 170 | 136 |
| Afghanistan | 0.84 | 1.27 | 0.85 | 0.31 | 0.78 | 1.09 | 0.83 | 0.73 | 119 | 93 |
| Indonesia | 0.84 | 1.27 | 0.85 | 0.31 | 0.78 | 1.09 | 0.83 | 0.73 | 95 | 74 |
| Egypt | 0.79 | 1.02 | 1.12 | 0.31 | 0.82 | 1.00 | 1.06 | 0.69 | 82 | 67 |
| Yemen | 0.79 | 1.27 | 0.88 | 0.31 | 0.76 | 1.09 | 0.85 | 0.69 | 80 | 61 |
| Turkey | 0.75 | 1.02 | 1.03 | 0.31 | 0.77 | 0.97 | 0.98 | 0.66 | 77 | 70 |
| South Africa | 1.31 | 1.02 | 1.12 | 0.31 | 1.16 | 1.01 | 1.11 | 1.11 | 76 | 89 |
| South Korea | 1.26 | 1.27 | 0.85 | 0.65 | 1.10 | 1.12 | 0.88 | 1.14 | 68 | 74 |
| Australia | 1.04 | 1.02 | 1.30 | 1.50 | 1.15 | 1.13 | 1.28 | 1.13 | 65 | 74 |
| Italy | 0.75 | 1.00 | 1.00 | 0.78 | 0.81 | 0.98 | 0.97 | 0.76 | 58 | 52 |
| Jordan | 0.79 | 1.27 | 0.88 | 0.33 | 0.76 | 1.09 | 0.85 | 0.70 | 57 | 43 |
| North Korea | 0.84 | 1.27 | 0.85 | 0.31 | 0.78 | 1.09 | 0.83 | 0.73 | 56 | 58 |
| Laos | 0.84 | 1.27 | 0.85 | 0.31 | 0.78 | 1.09 | 0.83 | 0.73 | 55 | 43 |
| Norway | 0.75 | 1.00 | 1.00 | 1.33 | 0.87 | 1.01 | 0.99 | 0.87 | 52 | 53 |
| Vietnam | 0.84 | 1.27 | 0.85 | 0.31 | 0.78 | 1.09 | 0.83 | 0.73 | 50 | 39 |
| Spain | 0.70 | 0.73 | 1.00 | 0.68 | 0.77 | 0.80 | 0.96 | 0.70 | 44 | 35 |
| Canada | 1.13 | 0.94 | 1.30 | 1.30 | 1.19 | 1.07 | 1.28 | 1.16 | 44 | 47 |
| Nepal | 0.84 | 1.27 | 0.85 | 0.31 | 0.78 | 1.09 | 0.83 | 0.73 | 41 | 32 |
| Algeria | 0.79 | 1.02 | 1.12 | 0.31 | 0.82 | 1.00 | 1.06 | 0.69 | 39 | 34 |
| Austria | 0.72 | 1.00 | 1.00 | 1.09 | 0.82 | 1.00 | 0.98 | 0.79 | 38 | 38 |
------------------------------
4. WHAT IT CHANGES FOR ARTESIA 5, WITH THE PLAN UNCHANGED
------------------------------
Without moving a single plant, the same plants at the price of their country:
| Plants of the plan | At the French series price (€bn) | At the price of each country (€bn) |
| Plateau V14 Soleil | 3,048 | 2,548 |
| Ridge V14 | 1,916 | 1,960 |
| V14 Soleil near fossil substations | 1,425 | 1,190 |
| Floating hybrid islands | 152 | 127 |
| V21 Barrage | 87 | 76 |
| Mixed V14 Soleil | 44 | 35 |
| Hybrid panels | 1,337 | 946 |
| V15 Canyon, placed on their ramparts | 747 | 723 |
| Total | 8,756 | 7,605 |
*
About 1,150 billion less, on a plan of 11,304 billion: the plan would fall to about 10,150 billion without changing anything else. The Pacha, Gold, Sky and O Sky already counted, the Titan towers and the lines remain at the same price.
*
China accounts for nearly two thirds of the reduction: 367 billion less on its plants, and 359 of the 391 billion less on hybrid panels, because its 1,179 TWh of hybrid panels cost 38% less there. India follows, 154 billion less.
*
The United States goes up: 165 billion more, and Japan 39. The ridge V14 go up a little overall, because the wind power of Russia and the United States, the two large ridge countries, is not cheaper than in Europe.
*
The recalculation will do more: with these prices, a V14 Soleil in India or China becomes much cheaper than a plant in the United States or Japan, and the Artesia 5 calculation will move plants, lines and hybrid panels. The figure of 10,150 billion is only a starting point.
------------------------------
5. THE LIMITS
------------------------------
*
The measured costs are averages of real 2023 projects, built with commercial panels, wind turbines and turbines, not with the site's plants. We assume that the gap between two countries stays the same for a V14 or a V15.
*
Hydraulics is the least certain family: IRENA does not measure pumped storage reservoirs like those of the site, but dams, which are more expensive and more variable. Hence the bounds of 0.6 to 1.3.
*
Many countries have no measurement of their own and take the median of their region: Africa, the Middle East and South-East Asia above all.
*
The 2023 solar prices are read from an IRENA chart; for a dozen European countries between 731 and 671 dollars per kW, the order may be shifted by one rank, that is 2% at most.
*
Exchange rates: the ratios between countries are taken in 2023 dollars and applied to the site's prices in euros; they are ratios, not prices.
------------------------------
6. CONCLUSION
------------------------------
Plants do not cost the same everywhere, but not for the reasons people think: it is not the level of wages that sets the price of a solar or wind farm, it is the size of the market. Calibrated on the costs actually measured by IRENA, a V14 Soleil costs 326 million euros in China, 319 in India, 465 in France and 594 in the United States. With the plan unchanged, Artesia 5 would cost about 1,150 billion less, mainly thanks to China and India. The next Artesia 5 calculation will take these prices, plant by plant, with the lines of each country.
------------------------------
SOURCES
------------------------------
The calculation (Python),
the 214 countries (CSV),
the chart (Python)
IRENA: Renewable Power Generation Costs in 2023 (installed costs of solar by country, figure 3.6; of onshore wind by country and region, table 2.1; of hydropower by country and region, figure 7.5)
The price of power lines country by country and
its table,
the Artesia 5 plants,
the Artesia 5 plan
The site's good ideas
Olivier Muhleisen in collaboration with Claude (Anthropic), October 2026. Plans, diagrams, texts and figures under the CC BY 4.0 licence.