The plants of the Artesia 5 plan: twelve solutions, three V14 that make 85% of the electricity, and 2,662 sites that already carry two or more, the basis of the future MAX versions

The Artesia 5 plan, version 1 chooses each plant at its delivered cost, line included. This page takes the inventory: which solutions it uses, how many of each, how many TWh they deliver, what they cost, in which countries, and on how many sites. It prepares the MAX versions, plants with capacity multiplied by 2 (MAX), by 4 (MAX 2) or by 6 (MAX 3) on the sites that can carry them, to lower the price of the kWh and the number of connections.

Chart: TWh and cost of each plant of the Artesia 5 plan, version 1
The table (CSV): centrales_artesia_5.csv; the chart (Python, free): schema_centrales_artesia_5.py; each site of the plan: plan_mondial_artesia_5_v1_sites.csv

Related pages: Artesia 5 world plan, version 1 | the inventory of inventions | the price of lines country by country
------------------------------
1. THE LIST
------------------------------

PlantNumberSitesTWh per yearBillion eurosM€ per annual GWhLeading countriesMAX version
Plateau V14 Soleil6,4603,610 plateaus6,8013,0480.45India 841, China 749, Myanmar 601, United States 559, Thailand 430yes
Ridge V145,2052,615 ridges5,1311,9160.37Russia 1,884, United States 1,123, Japan 246, China 216, Turkey 149yes
V14 Soleil near fossil substations (section 2)2,9571,138 substations2,6381,4250.54China 1,428, United States 287, Japan 252, Iran 116, South Korea 96yes
Industrial hybrid solar panels (in French)about 20 million modulesfarms, factories, wasteland1,6501,3370.81China, Russia, Japan, South Korea, Indonesiano
Pacha and Gold already counted2,700 and 1,126483910.19rainy countriesfollows its V14
V15 Canyon1,000coasts with 1,500 m of relief4057471.84not placed one by one; 2,447 sites foundyes
Floating hybrid islands2,079 islands1,361 reservoirs2581520.59China 784, United States 337, India 197, Japan 125, Vietnam 105no
V21 Barrage1,663 dams, counted at two thirds1,663 dams215870.40United States 335, Brazil 166, India 85, China 73, Spain 51no
Mixed V14 Soleil9271 plateaus96440.45India 42, China 23, Australia 10yes, with the V14 Soleil
O Sky583on the Sky56290.52rainy countriesfollows its Sky
Coastal Titan Claudia 5 and 4 Paris Style1,500large cities43491.14not placed one by oneno
Sky583 (356 and 227 new)on the Gold0, they shift energy to the evening65rainy countriesfollows its Gold

* Three V14 do the bulk: the plateau V14 Soleil, the ridge V14 and the V14 Soleil near fossil substations deliver 14,570 TWh out of 17,360, 84% of the plan, for 6,389 billion. They are the first target of the MAX versions.
* The plan's Pacha and Gold are also in the V14: 2,421 new Pacha and 1,138 new Gold are added to the V14 placed under 1,500 mm of rain or more, and their cost is included in that of the V14.
* Hybrid panels are only taken where they cost less, line included, than a well-placed plant, that is in the countries that lack good sites (China, Japan, Korea, South-East Asia). The plan still limited them to 20% per country; this limit will be removed in the next calculation.
* Plant prices: the plan still counts all its plants at the French series price; the page on the price of plants country by country brings them to the measured price of each country for the next calculation, about 1,150 billion less with the plan unchanged.
* Evening storage: the plan only counted the energy of the year; the page on the need for evening storage country by country shows that 6.8 TWh a day must be added, two and a half times the plan's V15, and the recalculation will take it into account.
* Update of 29/10: the recalculated plan takes all this into account, 9,919 billion euros, with the evening guaranteed; its 14,822 V14 form 7,841 plants, of which 3,137 MAX, and only 232 V15 remain.

------------------------------
2. THE V14 SOLEIL NEAR FOSSIL SUBSTATIONS
------------------------------

The only plant of the plan that does not yet have its own page: a V14 Soleil (500 MWp of trackers, two reservoirs of 800,000 m³, 48 MW of turbines and 64 MW of pumps) placed on a 300 m slope 50 km or less from a closing coal, gas or oil plant, its panel field on the plain and its head on the neighbouring hill, connected to the freed substation. 475 M€, 10 more than a plateau V14 Soleil to link the field to the head; 733 GWh at 1,500 tracker hours, 998 at 2,100. The 3,365 sites come from the scan of relief and rain around the 5,410 fossil substations described on the Artesia 5 page; 609 have enough rain for a Pacha.

------------------------------
3. WHAT THE SITES CAN CARRY: THE BASIS OF THE MAX VERSIONS
------------------------------

A plateau, a ridge or a substation of the plan often carries several plants. A MAX plant brings them together on the same site, with a single connection and enlarged structures instead of repeated ones.
PlantSites of the planSites with 2 plants or more (MAX)Sites with 4 or more (MAX 2)Sites with 6 or more (MAX 3)
Plateau V14 Soleil3,610, 6,460 plants847 sites, 3,710 plants320 sites, 2,497 plants168 sites, 1,825 plants
Ridge V142,615, 5,205 plants1,081 sites, 3,672 plants270 sites, 1,852 plants126 sites, 1,220 plants
V14 Soleil near fossil substations1,138, 2,957 plants734 sites, 2,553 plants271 sites, 1,497 plants87 sites, 701 plants

* More than half of the V14 are already on sites that carry two or more: 9,935 out of 14,622. They are the ones that will become MAX without changing site.
* The sites with six or more (381 sites, 3,746 plants) are the large plateaus, the long ridges and the big coal substations: the place for the MAX 3.
* The names: MAX, capacity multiplied by 2; MAX 2, by 4; MAX 3, by 6, and so on if a site allows it. Each type of plant will have its MAX page with its diagram, and its three sizes costed item by item: what is multiplied (panels, wind turbines), what is enlarged for less (reservoirs, pipe, machines), what is paid only once (connection, road, studies). Update of 29/10: the V14 Soleil MAX page is online, for the V14 Soleil, the mixed plant and the substation V14 Soleil. The V14 MAX page does the same for the ridge V14.

------------------------------
4. THE PLANTS WITHOUT A MAX VERSION
------------------------------

* V21 Barrage: its size is that of the dam that already exists.
* Floating hybrid islands: their number is what the reservoir can carry.
* Titan Claudia towers: a building is not doubled, another is built next to it.
* Pacha, Gold, Sky and O Sky: they are added to their V14 and will grow with it.
* V15 Canyon: already the largest plant on the site (2,940 MWh of storage), it costs 1.84 M€ per GWh because it mainly serves to store; update of 29/10: its MAX version is done, the V15 Canyon MAX, 19% less per MWh stored as a MAX 3.
* Hybrid panels: a module is a module, their economy of scale is already in their series price.

------------------------------
5. THE INVENTORY COMPARED WITH THE PLAN: WHAT IS NOT YET IN IT
------------------------------

All the plants of the inventory of inventions have been compared with the plan. The V1 to V13 are replaced by the V14 and its derivatives, the April Titan towers are archives, and the other inventions (Shore Power, Off Shore, Fresnel, Mcold) are not yet costed for a plan. Six leads remain that could enter Artesia 5:
* Temperate dams as wind V21: 3,156 dams, including the Three Gorges, where a wind V14 could be placed without a new lake, for 950 TWh possible. They are outside the plan because their wind has not been measured. It is the largest reserve of the inventory, and many are in China, the United States and Europe, where the plan lacks sites. Update of 29/10: the wind of these dams has been read, 2,099 windy dams, 714 V14, 619 TWh for 260 billion.
* The Gold 4 of karst, volcanic and artesian springs: 21.5 €/MWh on a Pacha 2, the cheapest kWh on the site. The plan counts it as an average, with the other Gold, on 47% of the Pacha; it does not yet know which sites have a large spring. A scan of the known springs would place it where it is. Update of 29/10: the large known springs have been scanned, 16 are useful to the plan for 446 GWh; open data are too scarce to go further.
* The Sky Artesia (in French): an artesian spring that rises on its own to the lake at 1,500 m of a Sky 3, 1,721 GWh instead of 1,429 and the winter reserve almost free. It requires a coastal V15 and a rare spring; the plan counts none.
* The Pacha 3 (in French) and Gold 3 (in French) on the V15: the plan's 1,000 V15 are counted bare, at 1.84 M€ per GWh. On rainy coasts, their rain lake and their torrent would add almost free energy.
* The Pacha 1 (in French) and Gold 1 (in French), on the 160 m V11: 28 to 29 €/MWh, on hills lower than those of the V14, often near cities. Their sites have never been scanned.
* The V19 Station Castle (in French): it is in the water section, paid for by water bills and outside the electricity total, as the rule of the plans requires.

------------------------------
SOURCES
------------------------------

The table of plants (CSV), the sites of the plan (CSV), the calculation of the plan (Python), the chart (Python)
The Artesia 5 world plan, version 1, the inventory of inventions
The site's good ideas

Olivier Muhleisen in collaboration with Claude (Anthropic), October 2026. Plans, diagrams, texts and figures under the CC BY 4.0 licence.