1. THE METHOD
------------------------------
*
The dams: the 3,156 peaking dams of the WRI world power plant database that are not sunny enough for a V21 Soleil, with the number of V14 their substation and lake can carry, calculated on the reservoirs page.
*
The wind: the mean speed at 150 m from the Global Wind Atlas 3, at 0.01° (one kilometre), already extracted for the
wind scan, read on every grid cell within a radius of 15 km around each dam: the wind turbines of a V14 stand on the ridges around the lake.
*
The rule: a V14 needs 6.5 m/s or more at 150 m along a dozen kilometres of ridge. We count the cells at 6.5 m/s or more around the dam; one V14 per 12 cells, without exceeding what the dam can carry. Its output is read from the V14 table at the mean wind of these cells, reduced by 10% because the atlas overestimates the wind over relief, as on the ridges page. 364 M€ per V14, the price of a complete V14, although it has no lake to dig: this is cautious.
*
The classes: A, 7 m/s or more on the windy cells; B, 6.5 to 7; C, 6 to 6.5 without enough cells at 6.5; D, under 6.
------------------------------
2. THE RESULT
------------------------------
| Dams | V14 without a new lake | TWh per year | Billion euros |
| Ceiling of the reservoirs page, wind not read | 3,156 | 1,073 | 950 | 391 |
| Class A, 7 m/s or more | 1,486 | together: 714 V14, 619 TWh, €260bn, 0.42 M€ per GWh |
| Class B, 6.5 to 7 m/s | 952 |
| Class C, 6 to 6.5 m/s | 12 | outside V14 |
| Class D, under 6 m/s | 497 | outside the plan |
| No data (Vietnam, Costa Rica, Sri Lanka, Laos: countries outside the wind scan) | 209 | to be read |
*
65% of the ceiling holds: 619 TWh out of 950. 2,099 dams have enough windy ridges around them for at least part of their V14.
*
The price is that of a good V14: 0.42 M€ per annual GWh, not counting that there is no lake, no head and no substation to build. It is a resource close to the cities and grids of the countries that lack sites.
*
The large dams of 500 MW and more: 234, for 360 TWh instead of the 587 of the ceiling.
*
The Three Gorges have no wind: 3.7 m/s at 150 m around the dam, outside the plan, like 497 other dams in sheltered valleys. On the other hand, Krasnoyarsk and Bratsk in Russia, Pubugou, Laxiwa and Xiaowan in China, Grand Coulee in the United States, Grand'Maison in France and La Grande-4 in Canada each carry five to ten V14.
------------------------------
3. THE COUNTRIES
------------------------------
| Country | Windy dams | V14 without a new lake | TWh per year | Billion euros |
| China | 392 | 143 | 119 | 51.9 |
| Japan | 51 | 80 | 68 | 29.0 |
| Russia | 83 | 73 | 61 | 26.6 |
| Canada | 231 | 43 | 40 | 15.8 |
| Norway | 129 | 36 | 36 | 13.1 |
| France | 177 | 31 | 27 | 11.2 |
| United States | 230 | 29 | 23 | 10.3 |
| Germany | 92 | 28 | 23 | 10.0 |
| Italy | 40 | 25 | 21 | 9.0 |
| Spain | 47 | 25 | 20 | 8.9 |
| Austria | 62 | 19 | 18 | 7.0 |
| United Kingdom | 55 | 14 | 15 | 4.9 |
| Switzerland | 102 | 15 | 13 | 5.3 |
| Ukraine | 10 | 15 | 13 | 5.5 |
| Sweden | 32 | 14 | 12 | 5.3 |
China, Japan, Canada, Norway and Central Europe are precisely the countries where the plan lacks sites or pays dearly for its lines: each TWh of windy dam is worth more there than the sun of a distant plateau.
------------------------------
4. THE FIRST TWENTY DAMS
------------------------------
| Dam | Country | Substation (MW) | Wind at 150 m, 90% of cells below | km² at 6.5 m/s or more | V14 | GWh per year | M€ |
| Krasnoyarsk | Russia | 6,000 | 6.9 | 222 | 10.0 | 7,890 | 3,640 |
| Zhigulevskaya HPP | Russia | 2,467 | 7.8 | 940 | 8.2 | 7,084 | 2,993 |
| Pu Bu Gou | China | 4,260 | 8.1 | 161 | 7.1 | 7,004 | 2,585 |
| Dagestan Branch | Russia | 1,786 | 8.5 | 827 | 6.0 | 6,120 | 2,167 |
| Laxiwa | China | 4,200 | 7.9 | 469 | 7.0 | 6,004 | 2,548 |
| Xiaowan | China | 4,200 | 6.8 | 104 | 7.0 | 5,726 | 2,548 |
| Bratsk HPP | Russia | 4,500 | 6.6 | 208 | 7.5 | 5,648 | 2,730 |
| Grand Coulee | United States | 6,809 | 6.5 | 89 | 7.4 | 5,498 | 2,700 |
| Okutataragi | Japan | 1,932 | 6.7 | 104 | 6.4 | 5,161 | 2,344 |
| Byreyskaya HPP | Russia | 2,010 | 6.7 | 312 | 6.7 | 5,042 | 2,439 |
| GRAND MAISON | France | 1,690 | 7.2 | 169 | 5.6 | 4,812 | 2,051 |
| Shin Takasegawa | Japan | 1,280 | 10.3 | 364 | 4.3 | 4,610 | 1,553 |
| La Grande-4 | Canada | 2,779 | 8.3 | 958 | 4.6 | 4,546 | 1,686 |
| Jinanqiao | China | 2,800 | 7.4 | 143 | 4.7 | 4,151 | 1,699 |
| Okumino | Japan | 1,500 | 6.6 | 103 | 5.0 | 3,989 | 1,820 |
| Volzhskaya HPP | Russia | 2,671 | 7.9 | 863 | 4.5 | 3,879 | 1,621 |
| Longtan | China | 6,300 | 6.4 | 55 | 4.6 | 3,618 | 1,668 |
| Okuyoshino | Japan | 1,206 | 8.0 | 275 | 4.0 | 3,614 | 1,463 |
| Vianden Pumped Storage Power Plant Luxembourg | Luxembourg | 1,296 | 7.6 | 748 | 4.3 | 3,611 | 1,572 |
| Dinorwig | United Kingdom | 1,800 | 11.9 | 944 | 3.0 | 3,545 | 1,092 |
------------------------------
5. THE LIMITS
------------------------------
*
The wind is that of the atlas, a one-kilometre model, reduced by 10%: a measuring mast will be needed on each site.
*
The ridges are not drawn: we count windy cells within a radius of 15 km, not a continuous 12 km ridge. Some cells are plateaus, passes or lakes.
*
People and protected areas around the dams are not read: many mountain dams are in parks.
*
The 209 dams without data are in countries the wind scan had not read.
------------------------------
6. CONCLUSION
------------------------------
Two thirds of the wind of temperate dams holds: 2,099 dams, 714 V14 without a new lake, 619 TWh a year for 260 billion euros, at the price of a good V14, on lakes, heads and substations that already exist, and above all in China, Japan, Russia, Canada and Europe. These dams enter the next Artesia 5 calculation.
------------------------------
SOURCES
------------------------------
The calculation (Python),
the 3,156 dams and their wind (CSV),
the map (Python),
the reservoirs of the WRI database (CSV)
Global Wind Atlas 3 (DTU and World Bank, CC BY 4.0),
WRI: Global Power Plant Database (CC BY 4.0)
Existing reservoirs,
the wind scan,
the Artesia 5 plan
The site's good ideas
Olivier Muhleisen in collaboration with Claude (Anthropic), October 2026. Plans, diagrams, texts and figures under the CC BY 4.0 licence.