Artesia 5 world plan, version 1, world economy: each plant chosen at the cost of the delivered kWh, line included; 95% of fossil electricity replaced in every country, and no longer on average, for 11,304 billion euros over 25 years, grid, losses and export lines included

Update of 29/10/2026: this plan has been recalculated with the prices of each country, the MAX versions, the V15 placed and evening storage, 9,919 billion euros, with the evening guaranteed. This page keeps the first version.

The Artesia 4 plan ranked its sites by the cost of the GWh produced and counted its grid as a lump sum of 1,000 billion. Recalculated plant by plant on the page Artesia 4, grids recalculated (in French), this grid costs 2,083 billion, and it only delivers 62% of the plan: South America produces for no one and China lacks 4,900 TWh. Artesia 5 starts from there. This first version looks for the cheapest plan for the whole world: each country receives 95% of its fossil electricity, and each plant is chosen at its delivered cost, connection, lines and losses included. A less good plant at the customer's location wins when the line to bring in a better one costs more than the difference. A second version, human development, will follow on another page. Update of 29/10/2026: the Pacha on the V14 of rainy substations, the floating hybrid islands on reservoirs, the O Sky and the Chinese price of lines in China (section 3).

Map of the plants and export lines of the Artesia 5 plan, version 1, and comparison of its cost with Artesia 4
Code of the plan (Python, free): calcul_plan_mondial_artesia_5_v1.py (reads plateaux_ceinture_soleil.csv, plateaux_rebord_vent.csv, cretes_vent_v14.csv, v21_retenues_1mw.csv, postes_fossiles_relief_v14.csv, retenues_soleil_flottant.csv, global_power_plant_database.csv and electricite_pays_prix_part_fossile.csv; optional arguments: maximum length and submarine share of lines, maximum distance to a large city, price of hybrid panels, maximum intermittent share per country, price coefficient of lines in China); the relief scan around the substations: balayage_relief_postes_fossiles.py; the chart: schema_plan_mondial_artesia_5_v1.py; the results: the sites taken, the balance by country, the export lines, the totals

Related pages: the plants of the plan | Artesia 4 world plan | Artesia 4, grids recalculated (in French) | reusable substations | electricity country by country
------------------------------
1. THE RULE: THE CHEAPEST FOR THE WORLD, DELIVERED IN EVERY COUNTRY
------------------------------

* The objective does not drop: 17,360 TWh a year, 95% of the world's fossil electricity, but this time in every country: each receives 95.4% of its fossil electricity, through its own plants or through lines. Artesia 4 met the 95% only as a world average.
* What is paid for: the plant, its connection, the long internal line if it is far from cities, the reinforcement at arrival, the export lines between countries and the losses on the way, which require extra plants. The prices are those of the pages on grids (in French) and substations.
* The calculation: a single optimisation (linear programming, HiGHS solver) chooses the plants and the lines at the same time so that the total is as low as possible.
* The sites: only measured sites. The plateaus of the sun belt and the windy ridges of the scans, this time up to 400 km from a large city since the line is paid for; the sunny peaking dams as V21; and 3,365 V14 Soleil sites near freed fossil substations, found by the new scan in section 2. The assumed Artesia 4 line, "1,500 V14 on fossil substations", is replaced by this scan.
* The lines kept: the 1,000 V15 Canyon, the 1,500 Titan Claudia towers, the Pacha and Gold already counted, and the O Sky (section 3), distributed in proportion to the countries' fossil electricity.
* The Pacha and the Gold: every V14 placed where 1,500 mm of rain or more falls receives its Pacha lake, and nearly one in two its Gold, as in Artesia 4; it is the cheapest GWh of the plan, 0.20 M€.
* The floating hybrid islands of the floating hybrid panel on existing dam reservoirs: 100 ha, 1,144 modules and 58.5 MWp per island, 73.1 M€, 107 GWh at 5.5 m/s, the solar adjusted to the sun of each reservoir; one island per 200 MW of substation, five at most. They do not count in the 20% intermittent limit: the dam's turbines compensate for their variations.
* Hybrid solar panels: at the price of the page on the world plan for hybrid panels (in French), 0.81 M€ per annual GWh, and no more than 20% of the plan's electricity in a country, because they do not store and beyond 15 to 20% intermittent a grid needs storage.
* Export lines: 5,000 km at most, of which 1,500 under the sea, as on the grids page.
* The price of lines in China: 0.6 times the cautious European price for Chinese connections and for lines arriving in or leaving China. The Changji-Guquan line, 12 GW over 3,293 km, cost about 5 billion euros, 0.36 times what the European formula gives: 0.6 remains cautious.
* The scenario: B, without the reversible Francis, which is not confirmed by a manufacturer.

------------------------------
2. THE NEW SCAN: THE RELIEF AROUND THE 5,410 FOSSIL SUBSTATIONS
------------------------------

* The question: the substations of closing fossil plants are in China, India, Japan, the United States, where the plan lacks plants. Can a V14 Soleil be placed near them? It needs a 300 m slope for its head, and sun.
* The method: the GMTED2010 relief at 1 km read within a radius of 50 km around each fossil substation of 50 MW or more (WRI database). A cell counts when it stands 300 m above the lowest point within 3 km. One site per 25 km² of slope, halved for caution (cities, forests, protected areas), and no more than the power the substation frees, at 0.25 GW per V14. The sun comes from the Global Solar Atlas; tracker hours are 1.25 times the fixed-panel yield, as on the plateaus. The route between the panel field, on the plain, and the slope adds 10 M€ per plant.
* The result: 1,967 substations out of 5,410 have a 300 m slope within 50 km, for 3,365 V14 Soleil sites: 1,428 in China, 287 in the United States, 252 in Japan, 116 in Iran, 96 in South Korea. WorldClim rainfall was read there too: 609 sites have 1,500 mm or more and receive a Pacha (199 in China, 172 in Japan, 55 in Indonesia, 42 in Taiwan). 230 substations were not read, for lack of a relief tile (Hawaii, western Alaska, the Arctic, and a damaged tile from Ukraine to the Urals).
* The limit: these V14 are V14 Soleil without wind turbines; the wind was not read around the substations. Below 1,800 tracker hours, their output is extended in a straight line below the V14 Soleil table (733 GWh at 1,500 hours). Many Chinese substations are under an average sky, and their V14 cost 0.52 to 0.65 M€ per GWh.

------------------------------
3. THE PLAN IN FIGURES
------------------------------

SolutionPlantsTWh per yearBillion euros
Ridge V145,2055,1311,916
Plateau V14 Soleil and mixed plants6,5526,8973,092
V14 Soleil near freed fossil substations (new), Pacha included2,9572,6381,425
Existing dams as V211,663 dams21587
Floating hybrid islands on reservoirs2,079 islands on 1,361 dams258152
New Sky on the Gold22720
V15 Canyon, Titan Claudia towers, existing Pacha and Gold, O Sky1,000 V15, 1,500 towers, 583 O Sky987962
Hybrid solar panels (20% at most per country)1,6501,337
Connection, internal lines, reinforcement at arrival1,491
Export lines119 lines, 1,122 GW4,914 transported824
Line losses, produced in addition418included
Total14,714 new plants, 1,663 dams, 2,079 islands17,358 delivered, 95%11,304

* The update of 29/10/2026 saves 552 billion (11,856 before): 250 with the Pacha of the rainy substation V14 (2,421 Pacha and 1,138 Gold in all, 572 more), the floating islands and the O Sky (56 TWh for 29 billion), and 302 with the Chinese price of lines. Hybrid panels on land fall from 1,842 to 1,650 TWh, export lines from 5,413 to 4,914 TWh, and Russia now sends only 1,192 TWh to China instead of 1,439.
* Delivered in every country, to within 2 TWh: the island of Guam, which nothing reaches, lacks 2 TWh.
* Dispatchable power in the evening: about 948 GW, counted as in Artesia 4 in proportion to the TWh of the Hydroloop plants, without the dams, the floating islands or the O Sky (Artesia 4: 1,042 GW).
* Comparison with the world military budget: 18% over 25 years.
* Comparison with the fossil fuel burned today for electricity (€917bn a year at world prices): 12.3 years of fuel.

------------------------------
4. THE COUNTRIES
------------------------------

The first fifteen countries by electricity to replace; the file by country gives the others. TWh per year.
CountryTo replacePlants of the planOutput of the sitesV15, towers, Pacha, GoldHybrid panelsExportsImports
China5,8933,2732,2413351,17902,138
United States2,4582,6472,10714000212
India1,4571,2471,0328301342
Russia7322,0031,8624201,21240
Japan6616234913813200
Saudi Arabia42436340024000
South Korea35818713220720134
Iran3565255482002120
Indonesia2902262041658012
Mexico2524554681402300
Taiwan238675014480127
Egypt20417019212000
Germany19547141100170
Turkey19220418111000
South Africa19016817911000

* The large consumers produce at home: the United States makes 86% of its share with 2,647 plants and dams of its own, India 71%, Japan 74%. Mexico now sends only 230 TWh to the United States instead of 1,230.
* China remains the difficult case: 3,273 plants, dams and islands at home (of which 1,428 V14 near its coal substations), 1,179 TWh of hybrid panels, and 2,138 TWh imported, mostly from Russia.
* South America and Africa now produce only for themselves: Chile, Peru, Bolivia and Ethiopia receive only the plants they need.

------------------------------
5. THE EXPORT LINES
------------------------------

The fifteen largest of the 119 lines; the file of lines gives the others.
FromToTWh per yearGWkm on landkm under the sea€bn
RussiaChina1,1922723,1930189.1
MyanmarChina435992,447055.7
PakistanIndia357821,657056.9
ThailandChina306702,553040.5
MexicoUnited States230532,201045.2
AfghanistanTajikistan20446765020.0
TajikistanChina202464,737044.9
IranKazakhstan154352,572034.1
MyanmarTaiwan141322,54825243.9
NorwayGermany129291,25115224.1
North KoreaSouth Korea120274325011.3
KazakhstanChina120273,773021.9
YemenUnited Arab Emirates102231,577015.6
NepalChina99223,380016.4
JordanKuwait86201,386012.1

* Russia becomes the leading exporter: 1,212 TWh, of which 1,192 to China over 3,193 km. These are the windy ridges of Siberia and the Russian Far East, the cheapest in the world to bring to Chinese cities.
* South-East Asia and Central Asia supply China: Myanmar, Thailand, Tajikistan (which relays Afghanistan), Kazakhstan.
* Short lines dominate: Pakistan to India, Spain and Austria to Germany, North Korea to South Korea, Yemen and Jordan to the Gulf.

------------------------------
6. ARTESIA 5 VERSION 1 AND ARTESIA 4
------------------------------

Artesia 4 (page)Artesia 4, grid recalculatedArtesia 5 version 1
Total cost, scenario B€8,685bn€9,992bn€11,304bn
Electricity delivered17,360 TWh assumed10,714 TWh, 62%17,358 TWh, 95% in every country
Grid and losseslump sum of €1,000bn€2,308bn€2,315bn and 418 TWh of losses produced
Cost per annual GWh delivered0.50 M€0.93 M€0.65 M€
V14 assumed1,500 on fossil substationsthe samenone: all V14 are on measured sites
Dispatchable in the evening1,042 GWless, the output does not get outabout 948 GW
Hybrid panelsnonenone1,650 TWh on land, 20% at most per country, and 258 TWh of floating islands on dams

* The price rises, but it becomes true: Artesia 4 cost 8,685 billion on paper, and 9,992 with its real grid while delivering only 62%. Artesia 5 version 1 delivers everything, everywhere, for 11,304. The delivered GWh costs 0.65 M€ instead of 0.93.
* The objective of less than 10,000 billion is no longer met by this version: it would need better-placed sites in East Asia (the wind around Chinese substations, the coasts for V15, hills further from the substations), or hybrid panels cheaper than on their page.

------------------------------
7. THE VARIANTS
------------------------------

VariantTotal costExport lines
The plan kept (5,000 km, 1,500 under the sea; hybrids on land at 0.81 M€ per GWh and 20% at most; Chinese lines at 0.6)€11,304bn4,914 TWh
Chinese lines at the real price of Changji-Guquan (0.36)€11,106bn5,075 TWh
Chinese lines at the European price€11,604bn4,885 TWh
Lines of the announced projects: 8,000 km, 4,000 under the sea€11,258bn4,395 TWh
Hybrid panels on land at 0.65 M€ per GWh€10,982bn4,268 TWh
Hybrid panels up to 30% per country€11,129bn3,720 TWh
Hybrid panels up to 15% per country€11,449bn5,633 TWh

Outside China, line prices remain those of a cautious European project. The page on the price of lines country by country now gives a price for each country; it will be used in the next update of the plan.

------------------------------
8. WHAT REMAINS FRAGILE
------------------------------

* China's dependence on Russia: 1,192 TWh, a fifth of its share of the plan. It is the cheapest, not the safest; version 2 and the countries' own choices may change it.
* The V14 near Chinese substations are measured for relief and sun, not for wind, cities or protected areas. Wind would often make them mixed and cheaper.
* The WRI power plant database stops in 2021: the coal substations opened since then in China and India are not counted.
* Losses: 418 TWh, 2.4% of the plan, produced in addition and paid for.
* The floating islands: one 100 ha island per 200 MW of substation is an assumption; the real surface of each reservoir has not been read, and the wind there is taken at 5.5 m/s everywhere.

------------------------------
9. CONCLUSION
------------------------------

Choosing each plant at its delivered cost changes the map: the large consumers produce at home, South America and Africa build only for their own needs, and export lines are only used where they are cheaper than a plant on site. 14,714 new plants, of which 2,957 V14 near closing fossil substations, 1,663 existing dams, 2,079 floating hybrid islands, 119 export lines and 1,650 TWh of hybrid panels deliver 95% of each country's fossil electricity for 11,304 billion euros, grid and losses included, with about 948 GW dispatchable in the evening. All the V14 of the plan are on measured sites; only the 1,000 V15 and the 1,500 towers remain counted without being placed one by one. Version 2 will look at what the world gains by having the poor countries with the best sites produce more.

------------------------------
SOURCES
------------------------------

The calculation of the plan (Python), the relief scan around the substations (Python), the 5,410 substations, their relief and their rain (CSV), the reservoirs and their sun (CSV), the sites taken (CSV), the balance by country (CSV), the export lines (CSV), the chart (Python)
USGS: GMTED2010 relief, Global Solar Atlas (World Bank), WorldClim 2.1: rainfall, WRI: Global Power Plant Database, Our World in Data and Ember: electricity by country, GeoNames, HiGHS: linear programming
The Artesia 4 world plan, Artesia 4, grids recalculated (in French), reusable substations, the world plan for hybrid panels (in French), the floating hybrid panel, the V20 O Sky
The site's good ideas

Olivier Muhleisen in collaboration with Claude (Anthropic), October 2026. Plans, diagrams, texts and figures under the CC BY 4.0 licence.



© 2009-2026 Onmyweb Production - TOS - Cookies information - Contact us - Free Copyright Open Source -