Existing reservoirs for the Hydroloop V21 Barrage: 369 large peaking dams of 500 MW and more screened, 135 in the sun for 189 TWh and 76 billion euros, 234 temperate for 587 TWh of V14 without a new lake; then the 2,380 dams of 20 to 500 MW by the same rule, 2,749 peaking dams in all, 327 TWh in the sun and 932 in the wind. 26/10/26

The V21 Barrage page costed one dam, Hoover. This page counts all the others, quickly and from afar, to find out whether the V21 is worth a line in a future plan. The World Resources Institute world power plant database (34,936 plants, of which 7,156 hydro, with their position, their capacity and their measured or estimated output) is filtered three times: 500 MW and more (486 dams), capacity factor of 45% at most (peaking dams, whose substation is free part of the day; run-of-river dams drop out) and known output: 369 dams. The Global Solar Atlas sunshine is read on each one. 135 are in the sun, 1,800 tracker hours or more: a V21 Soleil sized as at Hoover, with trackers at the power of the substation and pumps at one seventh, gives 101 GWp, 189 TWh a year for 76 billion euros, 0.40 M€ per annual GWh, in Iran, Brazil, India, Argentina, the United States, Pakistan, South Africa. 234 are temperate: there the V21 is worth, as the V21 page showed, a wind V14 at the same price but without a new lake, 663 V14 and 587 TWh possible in China, Japan, Russia, Canada, Norway, France, Italy, Germany, provided the wind is there, which this page does not check. The 2,380 dams of 20 to 500 MW, treated by the same rule, add 138 TWh in the sun and 345 in the wind: 2,749 peaking dams in all, 327 TWh in the sun for 132 billion, 932 TWh in the wind for 1,053 V14 without a new lake. In a cautious count, two dams out of three having a downstream reservoir to pump from: 218 TWh in the sun and 622 TWh in the wind.

Code (Python, free): calcul_v21_retenues.py (arguments: the WRI database, the Global Solar Atlas PVOUT, the capacity threshold); the files: v21_retenues_500mw.csv (the 369 peaking dams of 500 MW and more, one per line), v21_retenues_100mw.csv (the 1,355 of 100 MW and more) and v21_retenues_20mw.csv (the 2,749 of 20 MW and more)

Related pages: V21 Barrage, the example of Hoover | Artesia 3 world plan | the plateaus crossed with people and rain (in French)
------------------------------
1. THE METHOD, IN FOUR RULES
------------------------------

* The free substation: capacity factor (annual output divided by capacity times 8,760 hours) of 45% at most. Below 30%, the V21 takes the full power of the substation; from 30 to 45%, half. Above, nothing: the substation is full.
* The sun: fixed-panel yield from the Global Solar Atlas at the dam, times 1.25 for trackers. At 1,800 hours and more, a V21 Soleil: trackers at the power of the substation (Hoover: 2,080 MWp for 2,080 MW, the "larger" variant of the V21 page, 0.351 M€ per GWh), pumps at one fifth, 0.75 M€ per MWp all included, and an output of 2.13 GWh per MWp at 2,375 hours, corrected by the table of the V14 Soleil hourly model for the other hours. Below 1,800 hours, a wind V21: the equivalent of one V14 without a new lake per 300 MW of free substation (a fraction of a V14 for small substations, the domain of the V11), at the price and output of the V14 (364 M€, 885 GWh), the wind not being read.
* Output: measured (2017 to 2019) for 38 of the 135 dams in the sun, estimated by the WRI for the others; the capacity factor depends on it, and therefore the free substation.
* The cautious count: the database does not say whether there is a downstream reservoir to pump from; two dams out of three have one (a reach, a counter-dam, the lake of the next dam), and the cautious count takes two thirds.

------------------------------
2. THE RESULT IN FIGURES
------------------------------

Peaking damsNumberIn the sunTrackersTWh per year, V21 Soleil€bnM€ per GWhArtesia 3 plateaus avoidedTemperateV14 without a new lakeTWh per year, wind V21€bn
500 MW and more369135101 GWp189760.40172234663587242
Of which at 2,100 hours and more, the real Hoovers262638140.3635
100 to 500 MW98636957 GWp106430.4196617311275113
20 to 100 MW1,39452917 GWp32130.4127865797028
All peaking dams of 20 MW and more2,7491,033176 GWp3271320.402951,7161,053932383
Cautious count, two dams out of three21888197702622255

Three readings:
* The dams are in rainy countries, not in deserts. Of 369 peaking dams of 500 MW and more, only 135 are in the sun, and 26 at 2,100 hours; the 2,380 small and medium ones add only 138 TWh in the sun, their substations are small: Hoover is the exception, not the rule. The V21 Soleil is a plant for Iran (the three dams on the Karun), north-eastern Brazil (Xingó, Paulo Afonso, Sobradinho), India (Koyna, Sardar Sarovar, Indira Sagar), Argentina (Piedra del Águila, Salto Grande), Pakistan (Tarbela), South Africa (Drakensberg) and the American South-West.
* The money gain is small, the gain in sites is real. At 0.40 M€ per GWh on average, the 135 V21 Soleil cost barely less than the Artesia 3 V14 Soleil (0.43): 5 billion saved out of 76. What they bring is 172 fewer plateaus to find, 101 GWp placed next to a substation that exists, and 135 operators who already have a water permit.
* In the wind, the V21 is a door, not a price. 587 TWh possible on the 234 large temperate dams, 932 on the 1,716 of 20 MW and more, 1,053 V14 without a new lake: that is a fifth of the plan's 5,000 ridge V14, placed where the lake, the head, the substation and the operator exist. The wind of these dams is not read here; the Three Gorges (33 possible V14 at the substation) or Krasnoyarsk are only worth it if their ridges are windy, and the wind scan will tell.

------------------------------
3. THE FIRST 25 V21 SOLEIL, NAMED
------------------------------

Ranked by TWh of V21. Castaic and Koyna are already pumping stations, Hoover is on two lines in the database (Arizona and Nevada), Tucuruí and Macagua are monsoon dams with a giant substation, Tarbela and Nurek are mountain dams.
RankCountryDamSubstation, MWRiver output, GWhCapacity factorOutputTracker hoursTrackers, MWpV21 TWh (GWh)M€M€ per GWhPlateaus avoided
1BrazilTucuruí8,53524,00132%estimated1,9244,2687,7703,2010.4127
2VenezuelaAntonio Jose de Sucre (Macagua)2,9307,63530%estimated1,9552,9305,4102,1980.4065
3IranShahid Abbaspuor2,0004,61126%estimated2,1442,0003,9801,5000.3774
4IranMasjed Soleyman2,0004,58326%estimated2,0962,0003,9131,5000.3834
5IranKaroune 32,0004,67027%estimated2,0432,0003,8311,5000.3924
6United StatesCastaic1,682640%measured2,2981,6823,5151,2620.3593
7BrazilIlha Solteira3,44410,42835%estimated2,0981,7223,3711,2920.3833
8BrazilJirau3,75013,86542%estimated1,8951,8753,3671,4060.4183
9IndiaKOYNA COMPLEX1,9562,68616%measured1,8011,9563,3461,4670.4383
10PakistanTarbela3,47812,79542%estimated1,9311,7393,1761,3040.4113
11BrazilSanto Antônio3,56813,19242%estimated1,8611,7843,1491,3380.4253
12BrazilXingó3,16210,35037%estimated1,9851,5812,9571,1860.4013
13ArgentinaYACYRETA1,5503,60527%estimated1,9711,5502,8821,1620.4033
14ArgentinaPIEDRA DEL AGUILA (CPSA)1,4002,93224%estimated2,0971,4002,7401,0500.3832
15TajikistanNurek3,01511,09642%estimated1,9061,5082,7221,1310.4162
16ChinaGuanyinyan3,0009,86938%estimated1,8251,5002,5981,1250.4332
17BrazilPaulo Afonso IV2,4628,06037%estimated2,0431,2312,3599230.3912
18IndiaS,SAROVAR RBPH1,2001872%measured1,9701,2002,2309000.4042
19United StatesHoover Dam (AZ)1,0391,51217%measured2,2281,0392,1267790.3662
20United StatesHoover Dam (NV)1,0391,91021%measured2,2281,0392,1267790.3662
21BrazilItumbiara2,0808,10144%estimated2,1371,0402,0647800.3782
22IraqMosul Dam1,0522,40926%estimated2,0501,0522,0227890.3902
23ArgentinaSALTO GRANDE (MITAD ARGENTINA)9451,47818%estimated2,3629452,0107090.3532
24South AfricaDrakensberg1,0001,62719%estimated2,1221,0001,9747500.3802
25IndiaINDIRA SAGAR1,0001,09012%measured1,9951,0001,8797500.3992

The first twelve temperate dams, where the V21 would be a V14 without a new lake, wind not checked:
CountryDamSubstation, MWRiver output, GWhCapacity factorTracker hoursPossible V14 at the substationGWhM€
ChinaThree Gorges Dam22,50082,81142%1,2323833,63013,832
United StatesGrand Coulee6,80919,55533%1,768119,7354,004
ChinaLongtan6,30018,60834%1,207108,8503,640
ChinaNuozhadu5,85017,53734%1,659108,8503,640
RussiaKrasnoyarsk6,00023,00944%1,311108,8503,640
ChinaAhai4,75015,62638%1,68887,0802,912
RussiaBratsk HPP4,50014,98338%1,46987,0802,912
RussiaZhigulevskaya HPP2,4675,42225%1,44087,0802,912
VietnamSon La2,4005,53726%1,55287,0802,912
ChinaJinping II4,40016,54343%1,42976,1952,548
ChinaLaxiwa4,20012,86235%1,70476,1952,548
ChinaPu Bu Gou4,26016,01743%1,09676,1952,548

------------------------------
4. COUNTRY BY COUNTRY
------------------------------

CountryPeaking dams of 500 MW and moreIn the sunTWh V21 Soleil€bnPlateaus avoidedV14 without a new lakeTWh wind V21
China941012511263233
Japan2200007163
Russia1511016860
Brazil353351204776
United States2014187161715
India211823102154
Vietnam511012018
Iran771771600
Canada1100001816
Italy723121412
Germany400001412
Spain63313109
Argentina65104922
France500001312
South Korea611111110
Ukraine500001110
Norway70000109
Mexico7652522
Colombia5221254
Taiwan3000076
Venezuela2262500
Pakistan3362500
Austria3000065
Sweden2000065
United Kingdom2000065

What the table says to the original question, Europe, Canada, Russia, Japan: they are in the wind column. China (233 TWh), Japan (63), Russia (60), Canada (16), France, Italy and Germany (12 each), Norway (9) have their peaking dams with a free substation, and there the V21 is the Hydroloop without a new lake; but there it is worth the price of a V14, and it waits for the wind. India (23 TWh in the sun), Brazil (51) and Iran (17) are the countries where the V21 Soleil is the cheapest plant on the site.

------------------------------
5. WHAT THE ARTESIA 3 PLAN WOULD GAIN
------------------------------

This page does not modify the Artesia 3 plan. When all the water reservoirs have been checked one by one, calculated with their downstream reservoir, their sun and their wind measured, and modernised into V21, it can be estimated that the Artesia 3 plan will fall by about 6 billion euros and 200 plateau plants (the cautious 218 TWh of the V21 Soleil replace 200 V14 Soleil at 0.43 M€ per GWh with V21 at 0.40), and that 700 of the 5,000 ridge V14 will be able to stand on existing dams without a new lake, at the same price but with a permit, a substation and an operator already there. The plan's gain is not in its billions, it is in its doors: 2,749 peaking dams are 2,749 decisions already half made.

------------------------------
6. THE FIVE CAVEATS OF THIS ESTIMATE
------------------------------

* Output is estimated for three quarters of the dams (WRI model), measured for 38 out of 135 in the sun; a capacity factor wrong by ten points moves a dam from one class to another. Dams with a zero or almost zero capacity factor (Castaic, Sardar Sarovar, Koyna) are pumping stations or irrigation dams, the best V21 sites but not the same operators.
* The downstream reservoir is not known: the database does not say whether there is a lake below. The cautious count takes two thirds; the truth lies between half and three quarters, and can be read on a map, dam by dam.
* The wind of temperate dams is not read: 932 TWh possible "if the wind is there". The planned wind scan will tell; without it, the wind column is a ceiling.
* The sizing is that of Hoover: trackers at the power of the substation. A dam whose substation is free 19 hours a day accepts it; a dam at a 40% capacity factor, taken at half here, clips more, and its V21 is worth a little more than 0.40.
* The land next to the dam: 2,080 MWp require 29 km² of desert next to Hoover; next to Tucuruí it is forest, and next to Koyna cultivated Ghats. Land use around the dams is not crossed; it is the same work as for the plateaus, to be done on the 135.

------------------------------
7. NEXT STEPS
------------------------------

In order: the downstream reservoir and the free land of the 135 large dams in the sun, on a map; the wind of the 234 large temperate dams with the wind scan; then the 2,380 of 20 to 500 MW one by one. The 3,500 dams of less than 20 MW in the database are not looked at: their substations are too small for a V21, it is the domain of the V3 and V11.

------------------------------
SOURCES
------------------------------

The calculation (Python, rasterio), the 369 dams of 500 MW and more (CSV), the 1,355 of 100 MW and more, the 2,749 of 20 MW and more
World Resources Institute: Global Power Plant Database, version 1.3.0, CC BY 4.0 (34,936 plants, output measured 2013-2019 and estimated 2017)
World Bank and Solargis: Global Solar Atlas, PVOUT, CC BY 4.0
Hydroloop V21 Barrage and the calculated example of Hoover, V14 Soleil, V14
Artesia 3 world plan