V21 Barrage page costed one dam, Hoover. This page counts all the others, quickly and from afar, to find out whether the V21 is worth a line in a future plan. The World Resources Institute world power plant database (34,936 plants, of which 7,156 hydro, with their position, their capacity and their measured or estimated output) is filtered three times:
500 MW and more (486 dams),
capacity factor of 45% at most (peaking dams, whose substation is free part of the day; run-of-river dams drop out) and
known output: 369 dams. The Global Solar Atlas sunshine is read on each one.
135 are in the sun, 1,800 tracker hours or more: a V21 Soleil sized as at Hoover, with trackers at the power of the substation and pumps at one seventh, gives
101 GWp, 189 TWh a year for 76 billion euros, 0.40 M€ per annual GWh, in Iran, Brazil, India, Argentina, the United States, Pakistan, South Africa.
234 are temperate: there the V21 is worth, as the V21 page showed, a wind V14 at the same price but without a new lake,
663 V14 and 587 TWh possible in China, Japan, Russia, Canada, Norway, France, Italy, Germany, provided the wind is there, which this page does not check. The 2,380 dams of 20 to 500 MW, treated by the same rule, add 138 TWh in the sun and 345 in the wind:
2,749 peaking dams in all, 327 TWh in the sun for 132 billion, 932 TWh in the wind for 1,053 V14 without a new lake. In a cautious count, two dams out of three having a downstream reservoir to pump from:
218 TWh in the sun and 622 TWh in the wind.
Code (Python, free):
calcul_v21_retenues.py (arguments: the WRI database, the Global Solar Atlas PVOUT, the capacity threshold); the files:
v21_retenues_500mw.csv (the 369 peaking dams of 500 MW and more, one per line),
v21_retenues_100mw.csv (the 1,355 of 100 MW and more) and
v21_retenues_20mw.csv (the 2,749 of 20 MW and more)
Related pages:
V21 Barrage, the example of Hoover |
Artesia 3 world plan |
the plateaus crossed with people and rain (in French)
------------------------------
1. THE METHOD, IN FOUR RULES
------------------------------
*
The free substation: capacity factor (annual output divided by capacity times 8,760 hours) of 45% at most. Below 30%, the V21 takes the full power of the substation; from 30 to 45%, half. Above, nothing: the substation is full.
*
The sun: fixed-panel yield from the Global Solar Atlas at the dam, times 1.25 for trackers. At 1,800 hours and more, a V21 Soleil: trackers at the power of the substation (Hoover: 2,080 MWp for 2,080 MW, the "larger" variant of the V21 page, 0.351 M€ per GWh), pumps at one fifth, 0.75 M€ per MWp all included, and an output of 2.13 GWh per MWp at 2,375 hours, corrected by the table of the V14 Soleil hourly model for the other hours. Below 1,800 hours, a wind V21: the equivalent of one V14 without a new lake per 300 MW of free substation (a fraction of a V14 for small substations, the domain of the V11), at the price and output of the V14 (364 M€, 885 GWh), the wind not being read.
*
Output: measured (2017 to 2019) for 38 of the 135 dams in the sun, estimated by the WRI for the others; the capacity factor depends on it, and therefore the free substation.
*
The cautious count: the database does not say whether there is a downstream reservoir to pump from; two dams out of three have one (a reach, a counter-dam, the lake of the next dam), and the cautious count takes two thirds.
------------------------------
2. THE RESULT IN FIGURES
------------------------------
| Peaking dams | Number | In the sun | Trackers | TWh per year, V21 Soleil | €bn | M€ per GWh | Artesia 3 plateaus avoided | Temperate | V14 without a new lake | TWh per year, wind V21 | €bn |
| 500 MW and more | 369 | 135 | 101 GWp | 189 | 76 | 0.40 | 172 | 234 | 663 | 587 | 242 |
| Of which at 2,100 hours and more, the real Hoovers | 26 | 26 | | 38 | 14 | 0.36 | 35 | | | | |
| 100 to 500 MW | 986 | 369 | 57 GWp | 106 | 43 | 0.41 | 96 | 617 | 311 | 275 | 113 |
| 20 to 100 MW | 1,394 | 529 | 17 GWp | 32 | 13 | 0.41 | 27 | 865 | 79 | 70 | 28 |
| All peaking dams of 20 MW and more | 2,749 | 1,033 | 176 GWp | 327 | 132 | 0.40 | 295 | 1,716 | 1,053 | 932 | 383 |
| Cautious count, two dams out of three | | | | 218 | 88 | | 197 | | 702 | 622 | 255 |
Three readings:
*
The dams are in rainy countries, not in deserts. Of 369 peaking dams of 500 MW and more, only 135 are in the sun, and 26 at 2,100 hours; the 2,380 small and medium ones add only 138 TWh in the sun, their substations are small: Hoover is the exception, not the rule. The V21 Soleil is a plant for Iran (the three dams on the Karun), north-eastern Brazil (Xingó, Paulo Afonso, Sobradinho), India (Koyna, Sardar Sarovar, Indira Sagar), Argentina (Piedra del Águila, Salto Grande), Pakistan (Tarbela), South Africa (Drakensberg) and the American South-West.
*
The money gain is small, the gain in sites is real. At 0.40 M€ per GWh on average, the 135 V21 Soleil cost barely less than the Artesia 3 V14 Soleil (0.43): 5 billion saved out of 76. What they bring is 172 fewer plateaus to find, 101 GWp placed next to a substation that exists, and 135 operators who already have a water permit.
*
In the wind, the V21 is a door, not a price. 587 TWh possible on the 234 large temperate dams, 932 on the 1,716 of 20 MW and more, 1,053 V14 without a new lake: that is a fifth of the plan's 5,000 ridge V14, placed where the lake, the head, the substation and the operator exist. The wind of these dams is not read here; the Three Gorges (33 possible V14 at the substation) or Krasnoyarsk are only worth it if their ridges are windy, and the wind scan will tell.
------------------------------
3. THE FIRST 25 V21 SOLEIL, NAMED
------------------------------
Ranked by TWh of V21. Castaic and Koyna are already pumping stations, Hoover is on two lines in the database (Arizona and Nevada), Tucuruí and Macagua are monsoon dams with a giant substation, Tarbela and Nurek are mountain dams.
| Rank | Country | Dam | Substation, MW | River output, GWh | Capacity factor | Output | Tracker hours | Trackers, MWp | V21 TWh (GWh) | M€ | M€ per GWh | Plateaus avoided |
| 1 | Brazil | Tucuruí | 8,535 | 24,001 | 32% | estimated | 1,924 | 4,268 | 7,770 | 3,201 | 0.412 | 7 |
| 2 | Venezuela | Antonio Jose de Sucre (Macagua) | 2,930 | 7,635 | 30% | estimated | 1,955 | 2,930 | 5,410 | 2,198 | 0.406 | 5 |
| 3 | Iran | Shahid Abbaspuor | 2,000 | 4,611 | 26% | estimated | 2,144 | 2,000 | 3,980 | 1,500 | 0.377 | 4 |
| 4 | Iran | Masjed Soleyman | 2,000 | 4,583 | 26% | estimated | 2,096 | 2,000 | 3,913 | 1,500 | 0.383 | 4 |
| 5 | Iran | Karoune 3 | 2,000 | 4,670 | 27% | estimated | 2,043 | 2,000 | 3,831 | 1,500 | 0.392 | 4 |
| 6 | United States | Castaic | 1,682 | 64 | 0% | measured | 2,298 | 1,682 | 3,515 | 1,262 | 0.359 | 3 |
| 7 | Brazil | Ilha Solteira | 3,444 | 10,428 | 35% | estimated | 2,098 | 1,722 | 3,371 | 1,292 | 0.383 | 3 |
| 8 | Brazil | Jirau | 3,750 | 13,865 | 42% | estimated | 1,895 | 1,875 | 3,367 | 1,406 | 0.418 | 3 |
| 9 | India | KOYNA COMPLEX | 1,956 | 2,686 | 16% | measured | 1,801 | 1,956 | 3,346 | 1,467 | 0.438 | 3 |
| 10 | Pakistan | Tarbela | 3,478 | 12,795 | 42% | estimated | 1,931 | 1,739 | 3,176 | 1,304 | 0.411 | 3 |
| 11 | Brazil | Santo Antônio | 3,568 | 13,192 | 42% | estimated | 1,861 | 1,784 | 3,149 | 1,338 | 0.425 | 3 |
| 12 | Brazil | Xingó | 3,162 | 10,350 | 37% | estimated | 1,985 | 1,581 | 2,957 | 1,186 | 0.401 | 3 |
| 13 | Argentina | YACYRETA | 1,550 | 3,605 | 27% | estimated | 1,971 | 1,550 | 2,882 | 1,162 | 0.403 | 3 |
| 14 | Argentina | PIEDRA DEL AGUILA (CPSA) | 1,400 | 2,932 | 24% | estimated | 2,097 | 1,400 | 2,740 | 1,050 | 0.383 | 2 |
| 15 | Tajikistan | Nurek | 3,015 | 11,096 | 42% | estimated | 1,906 | 1,508 | 2,722 | 1,131 | 0.416 | 2 |
| 16 | China | Guanyinyan | 3,000 | 9,869 | 38% | estimated | 1,825 | 1,500 | 2,598 | 1,125 | 0.433 | 2 |
| 17 | Brazil | Paulo Afonso IV | 2,462 | 8,060 | 37% | estimated | 2,043 | 1,231 | 2,359 | 923 | 0.391 | 2 |
| 18 | India | S,SAROVAR RBPH | 1,200 | 187 | 2% | measured | 1,970 | 1,200 | 2,230 | 900 | 0.404 | 2 |
| 19 | United States | Hoover Dam (AZ) | 1,039 | 1,512 | 17% | measured | 2,228 | 1,039 | 2,126 | 779 | 0.366 | 2 |
| 20 | United States | Hoover Dam (NV) | 1,039 | 1,910 | 21% | measured | 2,228 | 1,039 | 2,126 | 779 | 0.366 | 2 |
| 21 | Brazil | Itumbiara | 2,080 | 8,101 | 44% | estimated | 2,137 | 1,040 | 2,064 | 780 | 0.378 | 2 |
| 22 | Iraq | Mosul Dam | 1,052 | 2,409 | 26% | estimated | 2,050 | 1,052 | 2,022 | 789 | 0.390 | 2 |
| 23 | Argentina | SALTO GRANDE (MITAD ARGENTINA) | 945 | 1,478 | 18% | estimated | 2,362 | 945 | 2,010 | 709 | 0.353 | 2 |
| 24 | South Africa | Drakensberg | 1,000 | 1,627 | 19% | estimated | 2,122 | 1,000 | 1,974 | 750 | 0.380 | 2 |
| 25 | India | INDIRA SAGAR | 1,000 | 1,090 | 12% | measured | 1,995 | 1,000 | 1,879 | 750 | 0.399 | 2 |
The first twelve temperate dams, where the V21 would be a V14 without a new lake, wind not checked:
| Country | Dam | Substation, MW | River output, GWh | Capacity factor | Tracker hours | Possible V14 at the substation | GWh | M€ |
| China | Three Gorges Dam | 22,500 | 82,811 | 42% | 1,232 | 38 | 33,630 | 13,832 |
| United States | Grand Coulee | 6,809 | 19,555 | 33% | 1,768 | 11 | 9,735 | 4,004 |
| China | Longtan | 6,300 | 18,608 | 34% | 1,207 | 10 | 8,850 | 3,640 |
| China | Nuozhadu | 5,850 | 17,537 | 34% | 1,659 | 10 | 8,850 | 3,640 |
| Russia | Krasnoyarsk | 6,000 | 23,009 | 44% | 1,311 | 10 | 8,850 | 3,640 |
| China | Ahai | 4,750 | 15,626 | 38% | 1,688 | 8 | 7,080 | 2,912 |
| Russia | Bratsk HPP | 4,500 | 14,983 | 38% | 1,469 | 8 | 7,080 | 2,912 |
| Russia | Zhigulevskaya HPP | 2,467 | 5,422 | 25% | 1,440 | 8 | 7,080 | 2,912 |
| Vietnam | Son La | 2,400 | 5,537 | 26% | 1,552 | 8 | 7,080 | 2,912 |
| China | Jinping II | 4,400 | 16,543 | 43% | 1,429 | 7 | 6,195 | 2,548 |
| China | Laxiwa | 4,200 | 12,862 | 35% | 1,704 | 7 | 6,195 | 2,548 |
| China | Pu Bu Gou | 4,260 | 16,017 | 43% | 1,096 | 7 | 6,195 | 2,548 |
------------------------------
4. COUNTRY BY COUNTRY
------------------------------
| Country | Peaking dams of 500 MW and more | In the sun | TWh V21 Soleil | €bn | Plateaus avoided | V14 without a new lake | TWh wind V21 |
| China | 94 | 10 | 12 | 5 | 11 | 263 | 233 |
| Japan | 22 | 0 | 0 | 0 | 0 | 71 | 63 |
| Russia | 15 | 1 | 1 | 0 | 1 | 68 | 60 |
| Brazil | 35 | 33 | 51 | 20 | 47 | 7 | 6 |
| United States | 20 | 14 | 18 | 7 | 16 | 17 | 15 |
| India | 21 | 18 | 23 | 10 | 21 | 5 | 4 |
| Vietnam | 5 | 1 | 1 | 0 | 1 | 20 | 18 |
| Iran | 7 | 7 | 17 | 7 | 16 | 0 | 0 |
| Canada | 11 | 0 | 0 | 0 | 0 | 18 | 16 |
| Italy | 7 | 2 | 3 | 1 | 2 | 14 | 12 |
| Germany | 4 | 0 | 0 | 0 | 0 | 14 | 12 |
| Spain | 6 | 3 | 3 | 1 | 3 | 10 | 9 |
| Argentina | 6 | 5 | 10 | 4 | 9 | 2 | 2 |
| France | 5 | 0 | 0 | 0 | 0 | 13 | 12 |
| South Korea | 6 | 1 | 1 | 1 | 1 | 11 | 10 |
| Ukraine | 5 | 0 | 0 | 0 | 0 | 11 | 10 |
| Norway | 7 | 0 | 0 | 0 | 0 | 10 | 9 |
| Mexico | 7 | 6 | 5 | 2 | 5 | 2 | 2 |
| Colombia | 5 | 2 | 2 | 1 | 2 | 5 | 4 |
| Taiwan | 3 | 0 | 0 | 0 | 0 | 7 | 6 |
| Venezuela | 2 | 2 | 6 | 2 | 5 | 0 | 0 |
| Pakistan | 3 | 3 | 6 | 2 | 5 | 0 | 0 |
| Austria | 3 | 0 | 0 | 0 | 0 | 6 | 5 |
| Sweden | 2 | 0 | 0 | 0 | 0 | 6 | 5 |
| United Kingdom | 2 | 0 | 0 | 0 | 0 | 6 | 5 |
What the table says to the original question, Europe, Canada, Russia, Japan: they are in the wind column. China (233 TWh), Japan (63), Russia (60), Canada (16), France, Italy and Germany (12 each), Norway (9) have their peaking dams with a free substation, and there the V21 is the Hydroloop without a new lake; but there it is worth the price of a V14, and it waits for the wind. India (23 TWh in the sun), Brazil (51) and Iran (17) are the countries where the V21 Soleil is the cheapest plant on the site.
------------------------------
5. WHAT THE ARTESIA 3 PLAN WOULD GAIN
------------------------------
This page does not modify the
Artesia 3 plan. When all the water reservoirs have been checked one by one, calculated with their downstream reservoir, their sun and their wind measured, and modernised into V21, it can be estimated that the Artesia 3 plan will fall by about
6 billion euros and 200 plateau plants (the cautious 218 TWh of the V21 Soleil replace 200 V14 Soleil at 0.43 M€ per GWh with V21 at 0.40), and that
700 of the 5,000 ridge V14 will be able to stand on existing dams without a new lake, at the same price but with a permit, a substation and an operator already there. The plan's gain is not in its billions, it is in its doors: 2,749 peaking dams are 2,749 decisions already half made.
------------------------------
6. THE FIVE CAVEATS OF THIS ESTIMATE
------------------------------
*
Output is estimated for three quarters of the dams (WRI model), measured for 38 out of 135 in the sun; a capacity factor wrong by ten points moves a dam from one class to another. Dams with a zero or almost zero capacity factor (Castaic, Sardar Sarovar, Koyna) are pumping stations or irrigation dams, the best V21 sites but not the same operators.
*
The downstream reservoir is not known: the database does not say whether there is a lake below. The cautious count takes two thirds; the truth lies between half and three quarters, and can be read on a map, dam by dam.
*
The wind of temperate dams is not read: 932 TWh possible "if the wind is there". The planned wind scan will tell; without it, the wind column is a ceiling.
*
The sizing is that of Hoover: trackers at the power of the substation. A dam whose substation is free 19 hours a day accepts it; a dam at a 40% capacity factor, taken at half here, clips more, and its V21 is worth a little more than 0.40.
*
The land next to the dam: 2,080 MWp require 29 km² of desert next to Hoover; next to Tucuruí it is forest, and next to Koyna cultivated Ghats. Land use around the dams is not crossed; it is the same work as for the plateaus, to be done on the 135.
------------------------------
7. NEXT STEPS
------------------------------
In order: the downstream reservoir and the free land of the 135 large dams in the sun, on a map; the wind of the 234 large temperate dams with the wind scan; then the 2,380 of 20 to 500 MW one by one. The 3,500 dams of less than 20 MW in the database are not looked at: their substations are too small for a V21, it is the domain of the V3 and V11.
------------------------------
SOURCES
------------------------------
The calculation (Python, rasterio),
the 369 dams of 500 MW and more (CSV),
the 1,355 of 100 MW and more,
the 2,749 of 20 MW and more
World Resources Institute: Global Power Plant Database, version 1.3.0, CC BY 4.0 (34,936 plants, output measured 2013-2019 and estimated 2017)
World Bank and Solargis: Global Solar Atlas, PVOUT, CC BY 4.0
Hydroloop V21 Barrage and the calculated example of Hoover,
V14 Soleil,
V14
Artesia 3 world plan
The site's good ideas
Olivier Muhleisen in collaboration with Claude (Anthropic), October 2026. Files, code and figures under the CC BY 4.0 licence; WRI power plant database and Global Solar Atlas sunshine (CC BY 4.0).